1 / 14

Presentation Contents Company structure The Sevan technology FPSO Sevan Piranema FPSO Sevan Hummingbird FPSO Sevan

Presentation Contents Company structure The Sevan technology FPSO Sevan Piranema FPSO Sevan Hummingbird FPSO Sevan Voyageur FPSO for ENI Goliat field Sevan Driller No 1 FLNG GTW (Gas To Wire) Sevan bridge linked WHPIce Hull Sevan Ice Hull. Company structure. Sevan Marine ASA.

myron
Télécharger la présentation

Presentation Contents Company structure The Sevan technology FPSO Sevan Piranema FPSO Sevan Hummingbird FPSO Sevan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation Contents • Company structure • The Sevantechnology • FPSO SevanPiranema • FPSO SevanHummingbird • FPSO SevanVoyageur • FPSO for ENI Goliat field • Sevan Driller No 1 • FLNG • GTW (Gas To Wire) • Sevanbridge linkedWHPIceHull • SevanIce Hull

  2. Company structure Sevan Marine ASA 100% 100% 100% 100% Kanfa AS Sevan Drilling Sevan Marine do Brasil Ltda Sevan Pte Ltd Singapore Sevan Production AS 100% Sevan Production Services Pte Ltd Kanfa TEC Kanfa Aragon 80% Mator Sevan TBN Pte Ltd. 100% Sevan TBN Pte Ltd. 100%

  3. FPSO Floating Production Storage Offloading GTW Gas To Wire (Offshore powerplant) MODU Mobile Offshore Drilling Unit FDPSO Floating Drilling Production Storage Offloading MSV Multipurpose Support Vessel FAU Floating Accomodation Unit The SevanPlatform - the versatile ttechnology- FLNG Floating Liquefied Natural Gas production

  4. Field operator: Petrobras Contract type: Build own and operate FPSO operator: Sevan Marine Location: Offshore Aracaju Water depth: 1000m • Oil processing: 30 000 bod • Gas processing/ injection: 3.6 mill Sm3/day - 130 mill scfd @ 280 bar FPSO Sevan Piranema In operation since October 2007

  5. Field operator: Venture Production • Contract type: Build own and operate FPSO operator: Sevan Marine Location: UK Central North Sea Water depth: 120m Hull size: Sevan300 • Oil processing: 20 000 bod • Water injection: 20 000 bwd • Liquid combined: 30 000 bld • Retrofit of gas compression studied for future field. FPSO Sevan Hummingbird In production since September 2008 at Venture Production Operated Chestnut field UK CNS

  6. FPSO Sevan Voyageur at the Premier Oil operated Shelley field First offloading September 2009 Field operator: Premier Oil • Contract type: Build own and operate FPSO operator: Sevan Marine Location: UK Central North Sea Water depth: 120m Hull size: Sevan300 • Oil processing: 20 000 bod • Water injection: 20 000 bwd • Liquid combined: 30 000 bld • Power for two ESPs • Retrofit of gas compression studied for future field.

  7. FPSO Sevan 1000 for the ENI operated Goliat Field Field operator: ENI Norge • Contract type: Technology licensing FPSO owner: Goliat license Location: Norwegian Barents Sea Water depth: 400m Hull size: Sevan1000 • Total liquid processing: 110 000 bbl/day • Oil stabilization and desalination 110 000 bbl/day • Produced water re-injection: 75 000 bbl/day • Sea water injection: 125 000 bbl/day • Rich wet gas processing: 140 MM Scfd • Power from shore: 60 MW (HVAC)

  8. Winterization Protectionof personell (and equipment) againstwind, lowtemperatures, rain, sleat, hail, snow and icing Areas not exposed to hydrocarbonswill be 100% enclosed. Process areas will have weathertight roof and perforatedwalls to ensure ventilation Large benfits to workingenvironment; weatherprotection, heatedwork areas and safer material handling

  9. Sevan Driller No:1 Naming ceremony COSCO yard, Qidong, China August 2009 Contracted by Petrobras Sevan Driller No:2 contracted by ONGC Sevan Driller No:3 contracted by Petrobras

  10. FLNG application • Simplified tank system • More deck space for process and liquefaction system • No requirement for swiveling of cooling water LPG/LNG Tank Hold Space LNG Tanks Chain Lockers Condensate Tanks Ballast Tanks LNG storage (6 tanks): 180 000 m3 LPG storage (1 tank): 30 000 m3 Condensate storage (6 tanks): 28 000 m3 Ballast tanks (24 tanks): 87 000 m3

  11. Floating powerplant applications Onboard Co2 capture and compression plant feasible

  12. Elevations FPSO with dry tree completions Bridge-link to wellhead platform at moderate waterdepths

  13. Concept Description - Sevan FPU-ICE

  14. Thankyou