1 / 12

IOSC Brief to ASFO Workshop

IOSC Brief ASFO Workshop 8-9 Oct 08 Capt Wesley Traill. IOSC Brief to ASFO Workshop. 8-9 Oct 08. Aim. Provide overview of IOSC activities. Outline. Background Process Status Issues Alert Icing Operations Phase I Gap Analysis Way Ahead Question. Background.

naasir
Télécharger la présentation

IOSC Brief to ASFO Workshop

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IOSC Brief • ASFO Workshop • 8-9 Oct 08 • Capt Wesley Traill IOSC Brief to ASFO Workshop 8-9 Oct 08

  2. Aim • Provide overview of IOSC activities

  3. Outline • Background • Process • Status • Issues • Alert Icing Operations • Phase I Gap Analysis • Way Ahead • Question

  4. Background • Informal survey – Wing icing operations • ARB directed stand-up of IOSC Jun 05 • Mandate • Articulate gaps in current de-icing program • Explore need to introduce anti-icing fluids & associated operational procedures • Report to ARB • Composition • Executive • Four Working Groups

  5. Process • Education • SCOUIC, Forum, Info on Web • Identify gaps • Wing Requirements • Aircraft Certification Requirements • Current de-icing/anti-icing capabilities • Formulate way ahead

  6. Status • WG TORs drafted (to be staffed for approval) • 2005 Matrices require validation • CP140 certified for anti-icing fluids • CC130 AMAF for anti-icing fluids in progress • CC115 TBD • Alert De-icing vehicle • Gap Analysis Phase 1 conducted (MOU TC) • 14 Wing survey • On Target

  7. Issues • Staff • Funding • Alert icing operations • Phase 1 Gap Analysis: • Program • Training & Proficiency • Audits • Fluids • Pubs • Environment • Infrastructure and Equipment

  8. Alert Icing Operations • Nil capability at Alert • Options: • FEs continue to de-ice using portable – unsat • Wings provide qualified tech to do icing ops • Contract out

  9. Program *Progress contracts for surveys, AGIP Training & Proficiency *Progress training contract for Oct Identify recurrent requirements Audit Requirements AMSET, DTAES, AFSO, SETs DTAES, ATESS AF Trg, A4 Maint, TRSET DTAES, A4 Maint, A3 Staff Phase 1 Gap Analysis

  10. Fluids QA/QC, Standing offers Environment Publications C-82; P06; MAPS Contract vs CF CF wide & keep a deployed capability? 14 Wing QETE, A4 Maint, A4 Log A4 CE QETE, A4 Maint A3 Staff, A4 Staff W Comd Phase 1 Gap Analysis

  11. Way Ahead • Alert Icing Operations • Pursue options • Phase 1 Gap Analysis • Letter for Comd signature • TD for response NLT 24 Oct 08 • Brief ARB 5 Nov • LOE • Surveys and draft AGIP • Training • National Contract

  12. Questions ?

More Related