1 / 5

Current Status of BRAHMS: Smooth Operations and Upcoming Goals for High-pT Program

The BRAHMS experiment is currently running smoothly with no major issues. Since January 16th, we have recorded 0.43 nb⁻¹, collecting 12M MRS and 11M FS triggers. The focus now is on the “soft physic” low-pT program, aiming to deliver 2 nb⁻¹ within a week. For the high-pT program, which is luminosity-limited, the goal is 4 nb⁻¹, with strategies to enhance luminosity and b* squeeze to achieve this. A minimum of two weeks in low energy running is required for physics outcomes. Planning meetings and discussions are ongoing to optimize performance.

naava
Télécharger la présentation

Current Status of BRAHMS: Smooth Operations and Upcoming Goals for High-pT Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BRAHMS Cu+Cu Status • Running smoothly without major issues - 0.43 nb-1 recorded since Jan. 16th - 12M MRS 11M FS Triggers collected • Currently running “soft physic” (low-pT) program - Goal: 2 nb-1 delivered - Will be done in a week • High-pT program - Goal: 4 nb-1 delivered - Will be luminosity limited - Higher luminosity and/or b* squeeze will help reaching the goal • Minimum low energy run required for physics: ~ 2 weeks RHIC Planning Meeting

  2. RHIC Planning Meeting

  3. ZDC Rates for the week W S S RHIC Planning Meeting

  4. FS spectrometer trigger rates RHIC Planning Meeting

  5. b* squeeze test RHIC Planning Meeting

More Related