1 / 10

eSTORAGE

eSTORAGE. WP 2 Progress & Results. 28/10/2013. Jean-Christophe Passelergue Olivier De l’ Hermuzière. 28/10/2013. Agenda. Objectives & Organization Results and Progress Next Year Actions Critical Success Factors Q&A Session. 28/10/2013. WP2 Objectives. Existing limitations

nadda
Télécharger la présentation

eSTORAGE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. eSTORAGE WP 2 Progress & Results 28/10/2013 Jean-Christophe Passelergue Olivier De l’Hermuzière

  2. 28/10/2013

  3. Agenda Objectives & Organization Results and Progress NextYear Actions CriticalSuccessFactors Q&A Session 28/10/2013

  4. WP2 Objectives Existing limitations Classic Pumped Storage Hydro Plants (PSP) not flexible enough to contribute to portfolio energy balance management provide Ancillary Services such as secondary regulation when in pumping mode participate efficiently in Balancing Mechanism when in pumping mode WP Objectives Implement new market rules and associated incentives schemes related to storage in a context of large renewable resources integration Demonstrate the criticality of IT tools in enabling the deployment and efficient use of storage systems in the framework of Smart Energy Networks Year 1 Objectives Reviewand demonstrate the existingtools to the WP partners Identification of current operational process and constraints Prepare a flexible framework for WP2 development WP2 28/10/2013 On/Off Pumpingmode Flexible Generation mode

  5. 28/10/2013 Work Packages Organization WP1 WP2 WP3 Pumped Hydro Smart Energy Networks Benefits of Storage and Regulatory Storage Upgrade in & IT Tools Framework & Market Design Variable Speed MGT OTHER DEMO DEMO RTD T3.1 T1.1 Development Scenarios and Role of T2.1 Performance and System Specifications Storage for the Future EU Electricity Service Targets System T3.2 T1.2 T2.2 Economic and Environmental Value of Communication Unit design & Model IT tools for more continuous Storage in the Future EU electricity energy trading markets Test Management Systems T3.3 T1.3 Obstacles for the integration of Storage in Conversion to Variable Current EU Regulatory and Market T2.3 Speed of Hydro Plant Unit framework Smart Dispatch Storage PSP T3.4 T1.4 WP6 Hydro Plant unit Regulatory Recommendations for Storage in European Market Rules monitoring WP5 T4.1 Feasibility and technical cost benchmark PSP sites in EU WP4 Exploitation OTHER

  6. WP2 Organization 28/10/2013 Smart Energy Networks & IT Tools T2.1 System Specifications T2.2 IT Tools for more continuoustradingmarket T2.3 Smart Dispatch Storage PSP Detailed Specification System Architecture & Interoperability DetailedSpecification System Architecture & Interoperability Functionnal Specification Standard Interface & Protocol Data Model Standard Interface & Protocol Data Model Identification of Needs Development Integration Development Integration Test & Validation Test & Validation EDF, AHF, AGR ICL, ELIA, AGR

  7. Results & Progress Review and demonstrate the existing tools to the WP partners WP2.1 & WP2.2 : extension of e-terramarket entso-e suite, focusing on the Market Clearing Engine WP2.3 : extension of the IPO (Intra-day Plant Optimization) module (from e-terrageneration product) WP2 KOM : demo of e-terramarket entso-eand e-terragenerationto the partners Business operations and constraints analysis WP2.3 : Meeting with EDF « DOAAT » in St Denis in Feb 7th WP2.3 : Meeting with EDF « conduite » in Lyon in July 5th WP2.1 & WP2.2 : Coordination with WP3&4: Participation at the WP3 KOM in March 26th Redefinition of WP2 schedule in coordination with WP3 milestones and deliverables Preparation of a flexible framework for WP2 development Purchase of third-party development licenses for the optimization modules : AIMMS (mathematical modeling software) & CPLEX (solver) On-going set-up of the optimization module framework that will facilitate the development and integration of var-speed PSP models and market models 28/10/2013

  8. NextYear Actions 28/10/2013 • General • Project Management (internal & consortium) • Actively participate to the other Working Group • WP2.1 & WP 2.2 – IT tools for more continuous trading market • Follow-up WP3 development in view of the interim WP3 report expected in M24 • Start to work on first specification “Market Model and associated clearing rules” • Completing the framework setup and build base balancing market models (offers and bids, ancillary services requirement, power balance clearing and congestion management) • WP2.3 – Smart Dispatch Storage PSP • Get varspeed PSP data and characteristics to build and implement a var-speed PSP mathematical model in the IPO module (technical part only) • Produce a high level project note specification to describe the scope, proposed optimization tool and expected results • Deliver a first version of adapted eSTORAGE IPO in 2014 (not an official deliverable)

  9. CriticalSuccessFactors 28/10/2013 • Availability of physical and commercial model data to get meaningful and representative results • Availability of adapted market rules for implementation on market management system • Identify the place and role of the optimization tool within the actual EDF business process • Get acceptance and support from EDF exploitation team to implement meaningful demonstrator

  10. 28/10/2013

More Related