E N D
2. Programme Rail Net Denmark's Network
Dividing the network into line sections
 
Capacity Consumption Methodology
Standard time slots 
Visualization of results
Identification of bottlenecks
Outlook
Using the UIC406 method
Handling changes in infrastructure and/or timetable 
3. Rail Net Denmark’s Network 
4. Rail Net Denmark’s Network 
5. Methodology – Standard Time Slot 
6. Methodology – Standard Time Slot 
7. Visualization of Results 
8. Visualization of Results 
9. Visualization of Results 
10. Using the UIC406 Method 
11. Using the UIC406 Method 
12. Changes in Infrastructure and/or Timetable 
14. Extra train on double track – less capacity consumption? 
15. Overtakings – less capacity consumption?