2010 - CEZ IN ROMANIA

2010 - CEZ IN ROMANIA. Juan Saez Business Development Director CEZ Romania. Poate deveni Romania un hub energetic pentru Europa de Sud-Est? 2010 - Anul marilor investitii in energie Bucuresti – Aprilie 29, 2010.

napua
Télécharger la présentation

2010 - CEZ IN ROMANIA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2010 - CEZ IN ROMANIA Juan Saez Business Development Director CEZ Romania Poate deveni Romania un hub energetic pentru Europa de Sud-Est? 2010 - Anul marilor investitii in energie Bucuresti– Aprilie 29, 2010

  2. CEZ GROUP IS PRESENT IN MORE THAN 10 COUNTRIES FROM CENTRAL AND SOUTH EASTERN EUROPE 1

  3. CEZ GROUP IS ON TOP 10 POWER ULTILIY COMPANIES IN EUROPE Source: Bloomberg, Annual reports

  4. CURRENT LEVEL OF DEBT IS LOW; EASY ACCES TO LOANS

  5. CEZ GROUP IN ROMANIA • Electrocentrale Galati – joint venture • Majority Shareholder • Objective: construction of a new CCGT 400 MW Botosani Baia Mare Satu Mare Suceava Bistrita Iasi Zalau Oradea Piatra Neamt Cluj-Napoca Tîrgu Mures Bacau Vaslui • Wind Park in Fantanele & Cogealac • Biggest on shore wind park in Europe • Installed capacity: 600 MW • Total investment: 1.1 billion Euro • First stage: 139 turbines GE 2,5 MW - in 2010 • Second stage: 101 turbines- in 2011 Miercurea Ciuc Arad Alba lulia Sfîntu Gheorghe Timisoara Deva Focsani Sibiu Brasov Galati Braila Buzau Resita Rîmnicu Vîlcea Tulcea Tîrgu Jiu Ploiesti Pitesti Tirgoviste • Cernavoda Units 3&4 - Energonuclear • CEZ owns 9.15 % • Romanian state announced its intention to diminish the participation Drobeta-Turnu Severin Slobozia Slatina Bucuresti Craiova Calarasi Constanta Giurgiu Alexandria Sales and distribution services Sales services • CEZ DISTRIBUTIE and CEZ VANZARE • CEZ, a.s. bought 51% in 2005 for 165 mio. Euro • October 2009, CEZ a.s. placed a call option for 375 mio. Euro, buying 30% from Fondul Proprietatea and 19% from SC Electrica SA • The annual investment program for the distribution network is almost 50 mio. Euro

  6. CEZ IS DEDICATED TO KEEPING A CONSISTENT PUBLIC FRIENDLY POLICY TO THE COMMUNITIES Selected public related activities of CEZ Partnership with communities • Long-term partner for the communities • Acknowledging its role and supporting their development Supporting the local infrastructure projects • CEZ is currently building its relationship and involvement as partner, discussions with both the authorities and citizens • The village's infrastructure and facilities for the people are just some of the focus subjects • Dedicated to improving the quality of life in the community Sub-constructing work to local companies • Creating jobs for local citizens • Choosing local companies as partners (Eraos, Fantanele – construction works) • Supporting commerce (economical development) of the area 5

  7. PICTURES FROM THE WIND PARK SITE (1) Pouring of blinding concrete Mounting of ring for foundation Pouring of blinding concrete Construction of adapter ring and steel installation 6

  8. PICTURES FROM THE WIND PARK SITE (2) Installation of adaptor ring Installation of cables 7

  9. PICTURES FROM THE WIND PARK SITE (3) Installation of first WTG (FE8) Installation of first WTG (FE8) 8

  10. PICTURES FROM THE WIND PARK SITE (4) Installation of blades 9

  11. PICTURES FROM THE WIND PARK SITE (5)

  12. PICTURES FROM THE WIND PARK SITE (6) 11

  13. PICTURES FROM THE WIND PARK SITE (7) 12

  14. THANK YOU FOR YOUR ATTENTION!