1 / 1

Development of a Safety Culture Assessment Methodology for B&W Pantex Project #TT10-BWXT

Development of a Safety Culture Assessment Methodology for B&W Pantex Project #TT10-BWXT. Project Team Principal Investigator Jennifer Farris, Ph.D. Co-Principal Investigator Timothy Matis, Ph.D. Patrick Patterson, Ph.D Graduate Assistants Aaron Phillips

nash
Télécharger la présentation

Development of a Safety Culture Assessment Methodology for B&W Pantex Project #TT10-BWXT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Development of a Safety Culture Assessment Methodology for B&W Pantex Project #TT10-BWXT Project Team Principal Investigator Jennifer Farris, Ph.D. Co-Principal Investigator Timothy Matis, Ph.D. Patrick Patterson, Ph.D Graduate Assistants Aaron Phillips Undergraduate Assistants Matthew Ballan, Megan Heinz Project Motivation • Pantex Plant • Government owned and contractor operated manufacturing facility for the U.S. Department of Energy • America’s only nuclear weapons assembly /disassembly facility • Goal is to Operate as a High Reliability Organization • Faces high intrinsic hazards yet performs successfully • Lack of Data on Current Safety-Related Strengths and Weaknesses in Production Project Objectives • Develop and Implement a Safety Culture Assessment Methodology for the Pantex Plant • Identify Current Safety-Related Weaknesses in Production System and Design Action Plans for Improvement Project Activities • Instrument Design • Survey Administration • Data Analysis • Validation of Results and Design of Action Plans for Improvement • Full Scale Implementation of Assessment Method in Plant Research Methodology Survey Administration • Group-Based Instrument Design • Observation of Production System • Attribute Selection (Literature and Observation) • Item Development • Physical Layout and Response Options • Initial Pilot Test Data Analysis • Data Screening • Instrument Validation • Evaluation of Responses to Different Attributes (Group Differences, Strengths and Weaknesses) • Evaluating Relationships between Attributes Validation of Results and Design of Action Plans for Improvement • Production System Observation • Focus Groups • Dynamic Intervention Design • Final Assessment Approach for Roll-out to Larger Organization

More Related