1 / 14

IEEE 802.21 Session # 56 Big Island , HI Closing Plenary

IEEE 802.21 Session # 56 Big Island , HI Closing Plenary. Subir Das sdas at appcomsci dot com. Subir Das, Chair 802.21 WG. Meeting Updates. Task Groups Update Liaison Reports Teleconference Future Locations. Subir Das, Chair, IEEE 802.21. TG Reports.

nassor
Télécharger la présentation

IEEE 802.21 Session # 56 Big Island , HI Closing Plenary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE 802.21Session #56Big Island, HIClosing Plenary Subir Das sdas at appcomsci dot com Subir Das, Chair 802.21 WG

  2. Meeting Updates • Task Groups Update • Liaison Reports • Teleconference • Future Locations Subir Das, Chair, IEEE 802.21

  3. TG Reports • 802.21c Single Radio Handovers Task Group • https://mentor.ieee.org/802.21/dcn/13/21-13-0081-04-srho-tgc-report-and-agenda.pptx • 802.21d Multicast Management Task Group • https://mentor.ieee.org/802.21/dcn/13/21-13-0090-00-MuGM-tgd-closing-note.ppt • 802.21m: Revision Task Group • https://mentor.ieee.org/802.21/dcn/13/21-13-0098-00-REVP-tgm-report-and-agenda.pptx • 802.21.1: Media Independent Services Task Group • https://mentor.ieee.org/802.21/dcn/13/21-13-0096-00-MISU-802-21-1-closing-report.pptx Subir Das, Chair, IEEE 802.21

  4. Liaison Reports • 802.11 Report • https://mentor.ieee.org/802.21/dcn/13/21-13-0099-00-0000-802-11-liaison-report-for-2013-05.ppt • IETF Report • None Subir Das, Chair, IEEE 802.21

  5. Teleconferences • 802.21c Teleconferences: • May 30 (Thurs), 8-10 pm, US ET • June 11 (Tues), 9:30-11:30 am, US ET • June 25 (Tues), 8- 10 pm, US ET • July 9 (Tues), 9:30-11:30 am, US ET • 802.21d Teleconferences: • July 3 (Wed), 2013, 8am-10am, US ET • July 10 (Wed), 2013, 8am-10am, US ET • 802.21m Teleconference: • June 11 (Tues), 8-10 pm, US ET • 802.21.1 Teleconference • June 24 (Mon), 2013 , 8- 10 am, US EST Subir Das, Chair, IEEE 802.21

  6. 802.21c LB BRC • Anthony Chan (Chair) • Dapeng Liu • Charlie E. Perkins • Yoshihiro Ohba • Antonio de la Oliva • Hyunho Park • Hyeong Ho Lee Subir Das, Chair, IEEE 802.21

  7. P802.21 WG Motion Move to authorize the Ballot Resolution Committee (BRC) to resolve WG LB6b comments and approve the related contributions via teleconferences Move: Charles E. Perkins Second: Clint Chaplin For: 06 Against: 00 Abstain: 00 Motion Passes Slide 7

  8. P802.21 WG Motion Move to authorize the P802.21c Editor to incorporate all the resolutions of letter ballot #6b comments into P802.21c /D03 and produce P802.21c/D04 Move: Charles E. Perkins Second: Clint Chaplin For: 06 Against: 00 Abstain: 00 Motion Passes Slide 8

  9. P802.21 WG Motion Motion to authorize the Working Group chair to initiate a LB#6 re-circulation Letter Ballot on the question “Should P802.21c/D04 be forwarded to Sponsor Ballot?” Move: Charles E. Perkins Second: Clint Chaplin For: 06 Against: 00 Abstain: 00 Motion Passes Slide 9

  10. P802.21 WG Motion The Working Group authorizes the WG Chair to carry out a Working Group 30 days Letter Ballot on the question ‘Should P802.21d D01 be forwarded to Sponsor Ballot?’ Move: Yoshihiro Ohba Second: Charlie E. Perkins For: 06 Against: 00 Abstain: 00 Motion Passes Slide 10

  11. Future Sessions Subir Das, Chair, IEEE 802.21

  12. Future Sessions – 2013 • Plenary: 14-19, July 2013, Geneva, Switzerland • Co-located with all 802 groups • Interim: 15-20, Nanjing Zhong Shan Hotel, September 2013, Nanjing , China • Co-located with all 802 wireless groups • Plenary: 10-15 Nov 2013, Hyatt Regency Reunion, Dallas, TX, USA • Co-located with all 802 groups Subir Das, Chair 802.21 WG

  13. July, 2013 Sessions Details • The July 2013 IEEE 802 Plenary Session will take place July 14-19, 2013 at the International Telecommunication Union (ITU-HQ) Headquarters Campus in Geneva, Switzerland.  International Telecommunication Union (ITU)Place des Nations, 1211 Geneva 20, Switzerland • Registration Fees: • Early:  Before 6pm Pacific Time, Friday, May 24, 2013 • $500 US for all attendees (no group hotel stay required • Registration for the July 2013 IEEE 802 Plenary Session  (http://802world.org/plenary)  will be available sometime after the completion of the March 2013 Session in Orlando, FL USA.  Subir Das, Chair 802.21 WG

  14. Future Sessions – 2014 • Interim: 19-24 January, 2014, Century Plaza, Los Angeles, CA, USA • Co-located with all 802 groups • Plenary: 16-21 March, 2014, China World Hotel, Beijing PRC (Pending) • Co-located with all 802 groups • Interim: 11-16 May 2014, Hilton Waikoloa Village, HI • Co-located with all wireless groups • Plenary: 13-18, July 2014, Manchester Grand Hyatt, San Diego, CA, USA • Co-located with all 802 groups • Interim: 14-19, September 2014, TBD (Europe or Asia venue) • Co-located with all 802 wireless groups • Plenary: 2-7 Nov 2014, Grand Hyatt, San Antonio, TX, USA • Co-located with all 802 groups Subir Das, Chair 802.21 WG

More Related