1 / 19

Bruce Mayer, PE Licensed Electrical & Mechanical Engineer BMayer@ChabotCollege.edu

Engineering 11. Engineering Design for Small-Volume Electro-Mechanical Systems . Bruce Mayer, PE Licensed Electrical & Mechanical Engineer BMayer@ChabotCollege.edu. To Build a Designed Object. Say you were Asked to BUILD or CONSTRUCT something using basic hand tools

natane
Télécharger la présentation

Bruce Mayer, PE Licensed Electrical & Mechanical Engineer BMayer@ChabotCollege.edu

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering 11 Engineering Designfor Small-Volume Electro-Mechanical Systems Bruce Mayer, PE Licensed Electrical & Mechanical EngineerBMayer@ChabotCollege.edu

  2. To Build a Designed Object • Say you were Asked to BUILD or CONSTRUCT something using basic hand tools • You would need (at a minimum) • A list of Parts with P/N’s and Qtys • Parts FABRICATED specially for this Object • Parts PURCHASED from Catalogs for this Object (a.k.a. “Standard Parts”) • Instructions on how ASSEMBLE the Object

  3. Small-Volume Object Design Raw-Material in Basic-Shapes (chosen by the Engineer) Parts Purchased from Technical Catalogs (Selected by the Engineer) Parts Fabricated per Specialized designs (your BluePrints) Assembly Documentation (Parts-List, BluePrints, Instructions, etc.) Written by the Engineer

  4. When Designing Something… • Think About CRITICAL Issues • Will It WORK • Will it Meet the SCHEDULE & BUDGET • Can it be BUILT from MY Design Documentation? • Ask Yourself: “If I were Building this object What Info would I need?”

  5. Discussion Scope • We Examine what it takes to BUILD small quantities (dozens to hundreds per year)of Engineering-Designed ElectroMechanical Systems for Sale • This Discussion Does NOT Address the FUNCTIONAL PERFORMANCE of the design; only what it takes to actually BUILD IT, regardless of how Well it works

  6. BUILDING SomeThing is HARD • Designing on Paper is MUCH EASIER than Designing Something that must be BUILT and Ultimately Sold • The Build-Process exposes • Incomplete Design Documents • Wrong Parts Purchased • Incorrect Order Number • Part-Purchase Delayed • Incorrect Supplier Phone Number • $-Costs much higher than estimated

  7. BUILDING SomeThing is HARD • The Build-Process exposes • Incomplete Design Documents • Not Sufficient Information to Construct • BluePrints Missing/Incorrect Dimensions or Notes; e.g., • Inconsistent Material CallOut • Missing/Confusing Lines • Missing Surface Finish • Schematics or Assembly Drawing Missing/Incorrect ID-Information; e.g., • Missing Balloon CallOut for O-Ring, Bolt, Valve, etc. • Missing Value for Resistor or Capacitor

  8. BUILDING SomeThing is HARD • The Build-Process exposes • Design Errors • Mechanical Elements do NOT FIT • Electrical Elements SHORT or do notPowerUp • Can Not be Fabricated or Assembled as Designed • Mechanical Structures are NonRigid • “Floppy” or “Doingy” or “Cheesy” of “Wobbly” • Electrical or Fluid Systems are UnderPowered or Noisy or Unstable • “Whimpy” or “Flakey” or “Glitchy”

  9. To BUILD an Engineered Design • CORRECT & COMPLETE information on PURCHASED-Parts Given to the “Purchasing Department” • NAMES & PHONE-NUMBERS of ALL Suppliers • Correct Part-Numbers for ALL Purchased Parts • Correct Order-Quantities and Estimated $-Costs

  10. To BUILD an Engineered Design • Dot “i’s” & Cross “t’s” on All FABRICATION Drawings (the “BluePrints”) • A single Missing-Dimension or Superfluous Line or Missing Feature-Callout Brings Production to a HALT • OMISSIONS result in ReWork or Scrap; e.g.; • Forgetting a needed Removed-Feature (Hole or Slot or Notch or Groove) • Superfluous Removed-Feature (‘extra” hole)

  11. Designed Part (Piece Part)

  12. To BUILD an Engineered Design • COMPLETE Bill of Materials (“BoM”, also called the “Parts List”) • EVERY Nut, Bolt, Washer, Wire-Connector, Plumbing-Fitting, etc.,Listed on the BoM Table • Complete CallOuts ALL parts shown with “Balloons” containing part ID-number • Clearly UNDERSTOOD AssyDwgs • Don’t Confuse the Assemblers

  13. Typical Assembly Drawing Balloon CallOut On-DwgBoM

  14. Tools at the Engineer’s Disposal • INGENUITY & CREATIVITY • MOST Important • Knowledge of SCIENCE and MATHEMATICS • Technical CATALOGS • “BluePrint” Making Software • Standard Fabrication Methods • Machining, Welding, Injection-Molding, etc.

  15. Summary: Design Docs Include • Purchased Part Information • What Mfr-PN, Who Supplies, How Much $ • Fabricated Parts Drawings (BluePrints) • 100% Accurate; generate NO Questions from Fabricators • BoM or Parts List • 100% Accurate as it is used to “Pull Parts from Stock” to Make an “Assembly Kit” • NonConfusing Assembly Drawings

  16. Small Volume Design FlowChart SupplierContact Info Purchased Part Catalog No. Physical Design to Scale (LayOut) MaterialSelection Fabrication Notes PurchasedParts Formal “BluePrints”(Use Std TitleBlock) Order & ReceivePurchased Parts Assy Parts List(Bill of Materials) To FabricatorMachine Shop, etc. Fabricatorcontact Info Assembly Drawing & Documentation FabricatedPiece-Parts Physical Assembly and/or Construction

  17. All Done for Today EngineeringDesign Pyramid

  18. Engineering 11 Appendix Bruce Mayer, PE Registered Electrical & Mechanical EngineerBMayer@ChabotCollege.edu

More Related