1 / 3

Points of Consensus

This document represents the general results of the discussion at the March 31, 2010 Globally Competitive Students Committee of the North Carolina State Board of Education. No action was taken and consensus points are emerging and not final. Points of Consensus.

natara
Télécharger la présentation

Points of Consensus

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. This document represents the general results of the discussion at the March 31, 2010 Globally Competitive Students Committee of the North Carolina State Board of Education. No action was taken and consensus points are emerging and not final. Points of Consensus • Choice in Post-Secondary Readiness measures seems supported however there will need to be a careful strategy to minimize gaming {Hearing from some but not all} • Continue the use of the performance composite based on new standards • Focus on Reading and Math as represented in Longitudinal Growth for LEA Accountability plotted with a common metric • Give Graduation Project weighting in a bonus system • Use 5-Year Cohort graduation rate in model • Emphasis in model (and weighting) is student achievement and growth. • Preference for 4-quadrant model (or similar) for classification system • Need for revision of Gateway system 1

  2. Next Steps • Develop mechanism for additional SBE member input on Future-Ready Core, weighting and reporting in next month and compile results • Finalize straw man of new model in preparation for summer formal feedback and get buy-in of folks on board early (NCAE, Other Ed Groups, Teachers) • Report on full superintendent results on April 25th to SBE. • Have a conversation with Wake Forest (and others) who have dropped the SAT and ACT and determine what they use to measure readiness. • Run simulations to get a sense of how a new model would behave with different weightings • Revisit semantics carefully prior to rolling out to field • Add teacher and student working conditions survey data to updated reporting • Get a couple of pieces of data: 08-09retention rates, find who passed the test but not the class and Algebra II data 2

  3. Parking Lot Issues • SBE has a separate conversation about diagnostic assessment plan and Ready, Set, Go • Reward and Sanction conversation relative to ESEA • Conversation about the possibility of inclusion of 20% of final grade coming from EOCs in 3-8 • Discussion of Legislative changes necessary 3

More Related