200 likes | 452 Vues
KEPCO JEJU Smart Grid Projects. IL-KEUN SONG. CONTENTS. Ⅰ. KEPCO in Brief. Ⅱ. JEJU SG Pilot Projects. Ⅴ. Ⅴ. Ⅲ. SR Test-bed Projects. Ⅳ. DR Interconnection Rules. Policy for DG on Grid. Ⅴ. Policy for DG on Grid. Ⅰ. KEPCO in Brief. History
E N D
KEPCO JEJU Smart Grid Projects IL-KEUN SONG
CONTENTS Ⅰ KEPCO in Brief Ⅱ JEJU SG Pilot Projects Ⅴ Ⅴ Ⅲ SR Test-bed Projects Ⅳ DR Interconnection Rules Policy for DG on Grid Ⅴ Policy for DG on Grid
Ⅰ. KEPCO in Brief • History • 1898 : The first electric power company was founded • 1961 : Three regional electric companies merged into a national electric Power company(KECO) • 1982 : KECO was renamed as KEPCO, a wholly goverment-owned • 2001 : KEPCO’s generation unit was spun off into 6 subsidiaries • As of 2010 • Number of Customers : 223,488,239 • Sales(kWh) : 434,160,228,034 • 10st Ranked in Utilities(Fortune) • Asset(107.6 Billion USD, ranked 5st in KOREA) • Credit Rating(A2 : Moody’s, A : S&P) Song– KR – RT.4c
Ⅱ. JEJU SG Pilot Projects • JEJU SG Pilot Projects For the Technical Verification of SG, and Business Model Development • SG Road Map Foundation for Low-Carbon Green Growth based on Smart Grid VISION 1st Phase(2013) 2nd Phase(~2020) 3rd Phase(~2030) PHASE Field Test in JEJU Application in Wide Area (SG City Project) Nationwide Application Smart Power Grid Smart Place Smart Transportation Smart Renewable Smart Elec. Service Main 5 Sectors Song– KR – RT.4c
Ⅱ. JEJU SG Pilot Projects • Smart Power Grid New Intelligent Power Grid Management System with “Smart” Functions based on IT technology Targets Mosaic Panel Labor Cost and Time Saving, Reliability & Efficiency Improvement Benefits IEC 61850 Contents 100 Mbps Fiber Ethernet Copper Wire • Two 154kV Substations and Feeders will be • digitalized based on IEC 61850 • Fault Prediction System with Intelligent • sensors • Intelligent Distribution Management System Digital Relay IED Relay ※ DAS installation completed on2004 Schedule • 1st (2010. 6~2011. 5) : Device installation • 2nd~4th (2010. 1~ 2013.11) : Device test, • Operation and Assessment Song– KR – RT.4c
Ⅱ. JEJU SG Pilot Projects • Smart Place Targets Load Management by Demand Respond under AMI environment MDMS Load Leveling, Energy Efficiency Improvement, Cutting Electric Charge Benefits SUN Center Contents • Smart Meters / MDMS • Integrated Metering System /Energy Portal • Two-way Power Exchange / Other Services Smart Building Green Energy Energy Display ※MDMS – Metering Data Management System SmartAppliance Smart Panel Smart Home EV, PHEV Schedule • 1st(2009.12~2010.5): Planning & Field Survey • 2nd(2010. 6~2011. 5): Service Models & Solutions • 3rd(2011. 6~2012. 5): Field Test • 4th(2012. 6~2013. 5): Conclusion Home Server Intelligent Switch Smart Meter Smart Thermostat Service DR Infra Song– KR – RT.4c
Ⅱ. JEJU SG Pilot Projects • Smart Transportation Targets Preparation for EV’s Charging Infrastructure Contribution for EV’s fast spread, Power Sales Increment Benefits Contents CIM System Charging Infra. Distribution Network • Various charging stands by case • - Quick, Slow, Inductive, High Capacity Storage • Operation System for Charging Station / • / Information Security / Other services • Standardization of Charging Interface Charging Station Charging Stand Customer Management & Payment Network Protection * CIM : Customer Information Management Operation System Meter EVs Schedule Metering, Billing & Charging • 1st(2009.12~2010. 5): Designing • 2nd(2010. 6~2011. 5): Infra. Construction • 3rd(2011. 6~2012. 5): EV operation & Test • 4th(2012. 6~2013. 5): Assessment Monitoring & Charging Control Remote Control Song– KR – RT.4c
Ⅱ. JEJU SG Pilot Projects • Smart Renewable Targets Stabilization of unstable power from renewable energy sources Total Operation Center (TOC) DG’s stable interconnection with Network Benefits EMS SW Contents • 4 Types of System Configurations • 3 Types of Power Stabilization Mode, including • control Algorithm STATCOM, AVC Renewable Energy Power Grid Schedule PCS • 1st(2009.12~2010. 5): Designing • 2nd(2010. 6~2011. 5): Device Production • 3rd(2011. 6~2012. 5): Field Test • 4th(2012. 6~2013. 5): Conclusion BMS Load Bank Battery Song– KR – RT.4c
Ⅱ. JEJU SG Pilot Projects • Smart Electric Service Targets Support of Power Trade on RTP market, and Integrated Operation Center Business platform Development in the future Benefits Contents • Virtual Power Market Operation System (EMS) • Real-time Tariff Test, • Energy Information Portal Schedule • 1st(2009.12~2010. 5): Designing • 2nd(2010. 6~2011. 5): Installation & Pilot test • 3rd~4th (2011. 6~2013. 5): Integrated Field Test, • Assessment Song– KR – RT.4c
Ⅲ. Smart Renewable Test-bed Project • Project Goal • Development & Field Test of Power Stabilization Technology and Business Models in JEJU-Island • Project Outline • Project Name : Smart Renewable Test-bed Project • Duration / Budget : 2009.12.1~2013.5.31(42month) • Contents • Generation Power Stababilization of Resource Source • Development of Business Models, and Institutional Strategy to spread Smart Renewable Technology Song– KR – RT.4c
Ⅲ. Smart Renewable Test-bed Project Smoothing • System Configuration TOC(Total Operation Center) EMS Constant Power SW Power Grid STATCOM, AVC Renewable Power Energy Shifting PCS BMS Battery • EMS [Energy Management System] ▪ PCS [Power Conditioning System] • AVC : Automatic Var Compensator ▪ BMS[Battery Management System] • STATCOM [STATic synchronous COMpensator] Song– KR – RT.4c
Ⅲ. Smart Renewable Test-bed Project • Air View of SR Test Bed Small Hydro (60㎾) SROperation Center No 12 (750㎾, A Type) No 14 (660㎾, B type) Small WT (100㎾, C1 type) G KEPCO Line Small PV (100㎾, C2 type) Jeju Line G Communication Song– KR – RT.4c
Ⅲ. Smart Renewable Test-bed Project • Business Model Type A [Energy Shifting] Stores energy in low load time, and Discharges in peak time by using Large capacity storage Type B [Power Smoothing] Makes the generation power smooth by small capacity storage Type C [PQ Compensation] Improves the PQ at PCC(Point of Common Connect); Voltage variation reduction, PQ improvement, etc Supplies power to customers in isolated grid when in case of KEPCO lines’ outage Type D [Intentional Islanding] Song– KR – RT.4c
Ⅲ. Smart Renewable Test-bed Project • Future Plans 2011 2012 2013. 5 Test being linked Standard & Patent Equipment Upgrade SREquipment Development Demonstration Scenario Shor t Term Demonstration Long Term Demonstration SRDemonstration SRBiz Model BM Evaluation Analysis & BM Development Song– KR – RT.4c
Ⅳ. Distributed Resource Interconnection Rules • Technical Criteria (To-be) • Connection Capacity (As-is) “DG can be interconnected to the grid if they meet the technical criteria” “DG can not be interconnected to the grid if their capacity over the capacity rules” SR have no technical barrier for connection with grid Power Smoothing Renewable Energy PQ Compensation (Smart Renewable Functions) Song– KR – RT.4c
Ⅴ. Policy for DG Positive Impacts on Grid • Changed rule and policy • Exising rule and policy The existing rules and policy focus on the negative impacts of DG ☞ limit the connection capacity of DG ☞ hinder R&D activity and application of new technologies The changed rule intend to drive the positive impacts of DG ☞ Enlarge the connection capacity ☞ Utility have help form DG and also DG create new benefits “The Capacity Rules intend to alleviate the negative impacts of DG” “The changed rules and policy lead to the positive impacts of DG” SR can provide the ancillary service and also participate in the electric market Power Smoothing Renewable Energy PQ Compensation Intentional Islanding Energy Shifting Song– KR – RT.4c (Smart Renewable Functions)
the end IL-KEUN SONG, Team Leader/Chief Researcher Transmission & Distribution Lab. KEPCO RI E-mail : songilk@kepco.co.kr