GCC Regulators’ Summit Operational & Market Risk Developments and Challenges in the GCC

GCC Regulators’ Summit Operational & Market Risk Developments and Challenges in the GCC. Michael Zamorski Managing Director, Supervision 1 March 2009. Agenda. Overview of operational risk Operational risk management Preparedness of GCC banks Main risks faced by GCC banks

Télécharger la présentation

GCC Regulators’ Summit Operational & Market Risk Developments and Challenges in the GCC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GCC Regulators’ SummitOperational & Market Risk Developments and Challenges in the GCC Michael Zamorski Managing Director, Supervision 1 March 2009

  2. Agenda • Overview of operational risk • Operational risk management • Preparedness of GCC banks • Main risks faced by GCC banks • Steps to ensure compliance with IRB approach

  3. Definition of Operational Risk Focuses on causes of operational risks: • internal processes • people • systems • external events OPERATIONAL RISK The risk of loss resulting from inadequate or failed internal processes, people and systems or from external events

  4. Elements of Operational Risk Management • Obligations of the Board of Directors • Senior Management oversight and control • Measuring & managing operational risk • Modeling operational risk • Risk mitigation techniques • Capital to cover operational risk exposures

  5. Risk Mitigation Tactics • Treat – reduce the probability of risk crystallizing through improved internal controls • Terminate – avoid the risk completely • Transfer – use insurance or outsourcing arrangements to shift the risk to another person or entity • Tolerate – accept the risk and do nothing

  6. Modeling Operational Risk • Risk factors are largely internal • Lack of industry wide benchmarks • Absence of mechanism to share loss histories across banks • Hard to predict or model “Tail Events”, which might result in a very large loss though they have extremely low probability of occurrence • Difficulties in isolating operational risk element in losses

  7. Objectives of Basel Capital Accord • To establish risk-sensitive, consistent capital adequacy standards • To risk weight bank assets by credit, market and operational risks • To focus on need for strong internal controls and governance • To encourage banks to embed risk management and capital planning as part of their management processes • To enhance industry transparency

  8. Basel II Approach - GCC Banks • Near-term … • Focus on basic indicator or standardised approach for Pillar 1 operational risk • Begin collecting data for more advanced approaches, and watch for benchmarking • Implement Pillars 2 and 3 • Long-term … • Standardised or Advanced Approach • Banks eligible to adopt Advanced Approach will do so by 2015

  9. Challenges faced by GCC banks • Improvements desired in operational risk management • Inadequate data on operational losses • Industry wide framework to share operational loss data • Challenges in developing Sound models • Ability to analyse extreme loss scenarios • Skilled and competent personnel

  10. Thank You