1 / 14

DataCore™ Hot Upgrade Lab

DataCore™ Hot Upgrade Lab. Upgrading from SANmelody or SANsymphony to SANsymphony-V. R eview this in its entirety before starting the Upgrade. Overview Objectives List of Documents Review Upgrade Guide Connecting to the Lab environment Check and Start Activity on the Lab Environment

nen
Télécharger la présentation

DataCore™ Hot Upgrade Lab

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DataCore™ Hot Upgrade Lab Upgrading from SANmelody or SANsymphony to SANsymphony-V

  2. Review this in its entirety before starting the Upgrade • Overview • Objectives • List of Documents • Review Upgrade Guide • Connecting to the Lab environment • Check and Start Activity on the Lab Environment • Planning the Upgrade • Start the Upgrade • Desired end result

  3. Overview • This presentation provides an overview of how to proceed with a Hot Upgrade from SANmelody or SANsymphony to SANsymphony-V in your Lab Environment. • This Online Training Course is Self-paced without an Instructor • Up to 24 hours is allowed for the course from GMT–12hrs until GMT+12 hrs • Your task is to upgrade a fully functional SANmelody or SANsymphony configuration to SANsymphony-V with the same capability. Note: Changes to the configuration are needed to Upgrade • You will use the Upgrade Advisor Tool provided on the Lab to identify changes needed • You will notify training@datacore.com when you have completed the course attaching the checklist to the email • You will end with a fully functional SANsymphony-V configuration

  4. List of Documents • You have been provided with the package called SSV_Upgrade_Materials.zip which contains: • 01_Read_First.pptx (this PPT presentation) • 02_SSV8.1PSP1Upgrade Guide.pdf • 03_Hot_Upgrade_Appendix_v2.xls • 04_Student Guide for DataCore Virtual Training Site.pdf

  5. Review the Upgrade Guide • Read the Upgrade Guide in its entirety to be familiar with the upgrade process before you start the real Hot Upgrade of the Remote environment. • The upgrade guide is the attached document “02_SSV8.1PSP1Upgrade Guide.pdf”

  6. Connecting to the Lab Environment • Read the document “04_Student Guide for DataCore Virtual Training Site.pdf” in its entirety. • This document contains the instructions to connect to the Lab environment. • Use the URL, Userid and Password in the email sent to you to connect to the Lab environment.

  7. Check and start up the Lab environment: 1 of 3 • On the Datacore Server’s Desktop is a SSV Upgrade Folder containing the Upgrade Advisor.msi and the SANsymphony-V 8.1 PSP1 Update 1. (SANsymphony sample shown here)

  8. Check and start up the Lab environment: 2 of 3 • Open DataCore MPIO on Server B to verify all paths are available to all Virtual Volumes. • Open IOmeter using the folder on the Desktop, select ONLY the mirrored volumes. (SANsymphony sample shown here)

  9. Check and start up the Lab environment: 3 of 3 • Select Access Specifications, and double-click Default • Set Transfer Delay to 10000, click OK and Assign this workload. Then START the IOmeter workload

  10. About the Upgrade • Do NOT open any GUI’s unless specifically instructed to. • The Upgrade Guide has steps for backing up the Boot drive (Appendix A), it is NOT necessary in this lab environment. • This Lab uses iSCSI, upgrading Fibre Channel environments are the same.

  11. Planning the Upgrade • Use “02_SSV8.1PSP1Upgrade Guide.pdf” to identify all items that need pre-upgrade and post upgrade re-configuration • Fill out the 03_Hot_Upgrade_Appendix_v2.xls checklist with those items that require reconfiguration. • The “03_Hot_Upgrade_Appendix_v2.xls” checklist will also give you general guidance on reconfiguration steps.

  12. Upgrade Customer Expectations for Lab • Existing Data must be retained on ALL volumes • A Linear Vvol is OK to be upgraded to 3PAP, we have storage • A Standard Mirror is OK to be upgraded to 3PAP • The data on the Snapshot MUST be retained

  13. Start the Upgrade • You can start the Upgrade of the Lab according to the instructions in Upgrade Guide. • The Upgrade Advisor tool will also confirm what items require reconfiguration before upgrading. • Please complete the 03_Hot_Upgrade_Appendix_v2.xls during the upgrade. • Post-Upgrade, use the the 03_Hot_Upgrade_Appendix_v2.xls to restore settings to thresholds, port roles, etc.

  14. Desired End Result • You completed the Hot Upgrade to SANsymphony-V. • Both DataCore Servers are Up and Running • The Host was able to send I/O to the Mirror virtual disks without any interruption. • FORWARD your Training Confirmation e-mail to training@datacore.com with the subject “Training Hot Upgrade Done” containing your comments about the upgrade as well as the completed and zipped 03_Hot_Upgrade_Appendix_v2.xls. • The Training Team will review the running HA lab and verify all data is present over the next day and inform you of the result.

More Related