1 / 22

Modular Building Systems International (MBSI): Modular Build

Modular Building Systems is a Central Florida provider of custom modular buildings - an expert in providing turn key solutions.

nguhonga
Télécharger la présentation

Modular Building Systems International (MBSI): Modular Build

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 888-320-8050 www.MBSI.com

  2. Key Contact Patricia Berk - President & Owner of MBSI • Patricia Berk incorporated MBSI in April of 2000. • MBSI has become the leading environmentally conscious modular company in the State of Florida. • Prior to MBSI, Ms. Berk held positions as Executive Vice President and was a shareholder of ASAP Office Buildings in Orlando, Florida, 1996-1999. • Branch Manager for the Central Florida branch of Space Master International, 1993-1996. • Account Executive for Diamond Engineered Space, 1989- 1993. • Phone 888-320-8050 GUATEMALA HOUSING REVITALIZATION

  3. About MBSI • MBSI is a solely owned corporation based in the State of Florida, United States. • MBSI is a certified general contracting firm, specializing in modular construction with Turn KeyServices. • The Company was established April 10, 2000 with it’s primary business in the South East, USA. • MBSI has established themselves in the alternative building marketplace as a leader with energy efficient and environmentally friendly buildings. GUATEMALA HOUSING REVITALIZATION

  4. MBSI’s Mission • To exceed client expectations through honest communication, quality construction and sensitivity for the environment, while fostering a safe, creative and ethicalworkplace that provides unlimitedopportunities. • To be major contributor to the developmentand quality of modular construction whileproviding impeccable customer service and communication. GUATEMALA HOUSING REVITALIZATION

  5. MBSI Business Philosophy • To attain successful long-term relationshipsthrough truthful and honest business procedures. - Utilize proven manufacturers, qualitymaterials, and provide cost effective construction. - Committed to meeting all client requirements, for total customer satisfaction. GUATEMALA HOUSING REVITALIZATION

  6. Environmental Focus • Provider of the first platinum-level Leadership, Energy and Environmental Design (LEED) Certified modular school in the State of Florida • Introduced green building practices in allaspects of MBSI as standard practices. • We use use certified green products in our modular buildings in order to minimize offgassing and conserve energy GUATEMALA HOUSING REVITALIZATION

  7. Market Sectors •Commercial Housing - Group treatment homes, Dormitories, Military Housing, Worker Camps •Schools - Charter, Public and Private, Gymnasiums, Classrooms, Auditoriums •Medical - CT/MRI Buildings, X-Ray Storage, Administrative Buildings, Doctors Offices, Hospitals, Laboratories •Churches/Places of Worship - Daycare & Child Care, Offices, Fellowship Halls, Sanctuary's, Business Offices •Government - Administrative Offices, dormitories, field stations,Grelocatable medical centers

  8. Types of Products Provided • Factory Built Modular Structures • Pre-engineered Steel Buildings • Turn Key Site Services • Building Accessories GUATEMALA HOUSING REVITALIZATION

  9. Recent Completed Projects • Shands Hospital MRI/CT Scan ModularFacility • Learning Gate Community School, Platinum Level LEED Certified Hillsboro CountyPublic Charter School. www.learninggate.org • Terrace Community Charter Middle School-Hillsboro County Public Charter School • 50,000 sq. ft. classroom space EmbryRiddle Aeronautical University GUATEMALA HOUSING REVITALIZATION

  10. Jacksonville Medical Center • MRI/CT can, type II non combustible modularmedical facility. • 5000 Square feet. • Contracted November2007 • Finished March 2008 To know about MBSI’s other medical buildings and projects, visit http://mbsi.com/building-types/medical.html

  11. Learning Gate School • 9 Classrooms, 8000 Sq. Feet • First Platinum LEEDCertified ModularSchool in U.S. • Receiving National Attention • www.learninggate.org To know about MBSI’s other educational buildings and projects, visit http://mbsi.com/building-types/education.html

  12. Terrace Community Charter School • Built in 2007 • Two Buildings totaling 36,000 sq.feet. • Administrative Offices • Gymnasium • 30 Classrooms • Cafeteria

  13. An Overview of the Permanent/Relocatable Modular Construction Engineering & Submittals Site Development Modular Construction Staging & Installation Interior & Exterior Finishes Project Completion 2000 Modular Building Systems Intl.

  14. Design Engineering • Unlimited Design Assistance • FL Engineered Blueprints • PE /Architect Coordination • Local Permitting Administration Design Site Development Staging and Installation Finishout Completion Modular Construction 2000 Modular Building Systems Intl.

  15. Site Development • Site preparation • Foundations • Logistics and receiving for staging Design Site Development Staging and Installation Finishout Completion Modular Construction 2000 Modular Building Systems Intl.

  16. Modular Construction Process • Begin Manufacturing Modules • Quality control/Documentation • State of FL building approval • Delivery to Site Design Site Development Staging and Installation Finishout Completion Modular Construction 2000 Modular Building Systems Intl.

  17. Staging & Installation • Foundation Development prior to Delivery • Staging on or near existing site • Set-up and installation • Begin on-site finishes Design Site Development Staging and Installation Finishout Completion Modular Construction Begin Finishout 2000 Modular Building Systems Intl. GUATEMALA

  18. Begin On Site Finishes • As modular building is installed, on site Interior & Exterior finishes Begin • Full Time Construction Management On Site CompletionFinishes Design Site Development Staging and Installation Modular Construction Begin Finishout 2000 Modular Building Systems Intl.

  19. Interior Finishes • Interior finishes are completed • Full Time Construction Management and Coordination of Interior Contractors Design Site Development Staging and Installation Interior Completion Finishes Modular Construction Begin Finishout 2000 Modular Building Systems Intl.

  20. Finish Out • Exterior finishes completed: • Exterior siding, sidewalks, canopies, etc Design Site Development Staging and Installation Exterior Completion Finishes Modular Construction Begin Finishout 2000 Modular Building Systems Intl.

  21. Completion • Final walkthrough of building • Test HVAC, Electrical & Plumbing • Substantial Completion Signed Off Design Site Development Staging and Installation Finishout Completion Modular Construction Begin Finishout 2000 Modular Building Systems Intl.

  22. Project Completed Design Site Development Staging and Installation Finishout Completion Modular Construction Begin Finishout 2000 Modular Building Systems Intl.

More Related