An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Middle Fork ProjectFlow and Temperature Modeling(Status Report) September 9, 2008

  2. Agenda • 9:00 AM - 12:00 PM • Introductions • Status Report/Discussion of Water Temperature Modeling • Reservoir Models • Tunnel Models • River Models • Data • Schedule and Key Decisions • 12:00 PM • Adjourn

  3. Principal Project Tasks • Model Implementation/Construction • Reservoirs (complete) • Rivers (in progress) • Tunnel (complete) • Model Calibration • Reservoirs • French Meadows • Hell Hole • Ralston • Rivers (pending) • Tunnel model calibration (in progress) • Other Tasks • field visits • model refinement • Technology transfer

  4. Model Implementation and Construction • Reservoir model implementation (CE-QUAL-W2): previously presented • River model implementation • Geometry (complete) • Flow (daily flow complete, peaking flows in progress) • Temperature (boundary condition and calibration data largely complete) • Meteorology (complete) • Tunnel model • Field data has been collected • Calibration

  5. River Models: Geometry • X-Y description (complete) • Profile (Z) description (complete) • Cross section form (in progress)

  6. X-Y-Z River Representation: MF

  7. X-Y-Z River Representation: Rubicon

  8. Reservoir Model Calibration • Flow: explicitly defined in model, i.e., user specifies inflow and outflow • Stage: measured vs. simulated • Water Temperature: • measured vs. simulated profile • measured vs. simulated outflow temperature • French Meadows and Hell Hole – preliminary results • Ralston – in progress (pending river model results)

  9. Reservoir Outflow French Meadows Hell Hole

  10. Reservoir Stage French Meadows Hell Hole

  11. Water Temperature • Models started under isothermal conditions in January (largely insensitive to initial temperature condition) • Vertical profiles available for summer months: 2006 and 2007 • Two locations: near dam and near tunnel intake (mid-reservoir profiles not available at all times)

  12. French Meadows Reservoirat Dam(2006)

  13. French Meadows Reservoirat Tunnel Intake(2006)

  14. Hell Hole Reservoir at Dam(2006) No data at mid-reservoir in 2006

  15. Tunnels • Tunnels in the project area - review • General Tunnel information • Tunnel Specifications • As built drawings • Field data • Tunnel Statistics • Recent Tunnel Temperature Data • Tunnel Model - Updates

  16. Model Element: Tunnels

  17. Tunnels • Tunnels are generally unlined and horseshoe shaped. Some sections are piped, and other sections have various shapes of concrete liners • Overbreak (e.g., excess excavation for car passes may add to tunnel volume)

  18. Tunnel Statistics * Travel time at +10 % volume ** Travel time at -10% volume TBD – to be determined for Duncan Tunnel – as open channel flow

  19. Tunnel Temperature Data: August 2008 French Meadows to Hell Hole Interbay to Ralston

  20. Tunnel Model • Where, • Δt = time step (sec) • Ts = Outside/rock temperature (oC) • D= Diameter (m) • Cp = Specific heat of water (J kg-1 oC-1) • ρ = density of water (kg m-3) • h = Heat exchange coefficient (Wm-2 oC-1) • n = time temperature profile along the tunnel with time • a = calibration coefficient ( unitless ) • Where, • k = thermal conductivity of water (Wm-1 oC-1) • R = hydraulic radius (m) • Re = Reynolds number • Pr = Prandtl number • b = calibration coefficient (unitless)

  21. Other Tasks • Field Visits • Reservoir model refinement • River model calibration • Tunnel model calibration • Technology transfer

  22. Technology Transfer • CE-QUAL-W2: model introduction • Model input files • Control file • Flow input • Temperature input • Model Output files • CE-QUAL-W2 • Compaq Array Viewer • AGPM

  23. Model Framework - Reservoirs • Input Control: • Model Parameters • (W2-con.npt) Reservoir Model CE-QUAL-W2 • Input Data: • Geometry • Flow • Temperature • Meteorology • Other Software: • Compaq Array Viewer • Model Output: • Flow • Temperature AGPM Post-Processing • Processes Output: • Animation • Profile • Time Series • Comparison with field data • Other

  24. CE-QUAL-W2 • Public Domain • Version 3.2 • Supported by PSU and US ACOE • 2-dimensional reservoir model (vertical and longitudinal representation) • Software Requirements (Compaq)

  25. CE-QUAL-W2 Input Files • Control File: logic control, model parameters, I/O control, initial conditions, etc. • Bathymetry • Flow input (reservoir inflow and reservoir outflow): Time series • Temperature of inflows: Time series

  26. CE-QUAL-W2 Output Files • Warning files • Reservoir outflow • Reservoir outflow temperatures (mass balance) • Other summary files

  27. CE-QUAL-W2 File Structure • Fixed format flat files • Input files must reside in same directory as executable • Output files are written to same directory • File management is important

  28. AGPM • The Animation and Graphics Portfolio Manager (AGPM) • Version 3.5 for Windows XP/Me/2K/9x/NT4 (32-bit) I • Post-processing software for graphically displaying results of two-dimensional reservoir water quality models such as CE-QUAL-W2 (as well as BETTER, and WASP). • Allows the modeler build a series of plots using a Windows interface for one simulation, and then efficiently reproduce all the same plots for a subsequent simulation. • The portfolio concept dramatically reduces the time and expense of plotting multi-constituent model results and shortening calibration times

  29. Profiles

  30. Animation (Screen Captures)

  31. Dam Release Temperatures

  32. Time Depth Plots

  33. Hands On Application