An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 13/02/2006 - 14/02/2006 Operational procedures Tasks and data flow overview Laser Monitoring

  2. 13/02/2006 - 14/02/2006 Sliding window analysis A range of runs is selected for a given SM ● Play Back the history ● Valid the readout ● TP analysis ● Analyzes of the history of channel’s responses Prepare the computation of the short term correction coefficients Laser Monitoring

  3. 13/02/2006 - 14/02/2006 Data Structure built for the sliding window analysis Retrieve all the reduced data from DB corresponding to the range of runs ● Distributed data (12 PC of the farm) ● Data integrity checked Master PC located in counting room Data organization: Xmonitor corrections 1) The data structure is a concatenation of reduced data for each run ● Laser shape parameters from the MATACQ ● Pulse shape parameters ● Response to Blue Laser ● Response to Infrared Laser ● Response to TP 2) Tables are built containing all the possible normalization ● for a given color ● for a given lmodN Laser Monitoring

  4. 13/02/2006 - 14/02/2006 Play Back the history The play back is performed on each PC of the monitoring farm ● Reduced data ● Log files (specific to each process executed on a PC) List of tasks: ● LookLaserShapeParProc ● LookPulseShapeParProc ● ValidLaserEventProc ● CorrectResponseLaserProc The play back doesn’t correspond to the processing reprocess from the converted data Laser Monitoring

  5. 13/02/2006 - 14/02/2006 Valid the Readout ● VROProc TP analysis ● LookTPmonitorProc ● CorrectTPEventProc Analyzes history of channel’s response ● LookmonitorProc ●LookPNmonitorProc 1) Detect zeros and fluctuations in the history of each channel 2) Detect oscillations with a 12h or 24h period (temperature) 3) Make a correction: ● Interpolation (without irradiations) ● Fit (In situ) Laser Monitoring

  6. 13/02/2006 - 14/02/2006 Follow-up (suivi) of the evolution of the ECAL Build R/R0 for blue and infrared Lasers Data structure: 1) For a given SM and lmodN 2) For a given normalization 3) Several blocks of ASCII data ● row: channel number ● first column: response to blue Laser ● third column: response to infrared Laser List of tasks: ● LookConstraintProc ● ValidCorrelationProc Laser Monitoring