제목 : Upper 기준홀 위치도 부적합

제목 : Upper 기준홀 위치도 부적합. 27.Feb.2013. 서울 산업. Problem Description. 기준홀. Spec : 0.4Max Act : 0.513. Problem Description. “ Z” datum 밀착용 스프링 (1 개소 ). “Y” datum. Jig 기준핀 (3 point). 4mm. “Y” datum 밀착용 볼플란져 (2 개소 ). Ball plunger. “Z” datum. “Y” datum. 6mm. Jig 기준핀.

nico
Télécharger la présentation

제목 : Upper 기준홀 위치도 부적합

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 제목 : Upper 기준홀 위치도 부적합 27.Feb.2013 서울 산업

  2. Problem Description 기준홀 Spec : 0.4Max Act : 0.513

  3. Problem Description “ Z” datum 밀착용 스프링(1개소) “Y” datum Jig 기준핀(3 point) 4mm “Y” datum 밀착용 볼플란져 (2개소) Ball plunger “Z” datum “Y” datum 6mm Jig 기준핀 제품과 Jig의 Gap 발생에 의한 기준홀 위치도 부적합 발생 제품

  4. Problem Description “Y” datum Upper 제품 가공 Jig “Z” datum 기준 데이텀 기준 데이텀 변경전 : 스프링 형식 변경예정 : 볼플란져 형식