70 likes | 198 Vues
In Session 5, Presentation 2, we explore critical pilot considerations and solutions related to construction plans for runways. Key topics include ensuring availability of runways and after-hours construction, along with the importance of proper site marking and management of foreign object debris (FOD). We discuss effective utilization of multiple and shortened runways, require proper aircraft performance charts, and highlight necessary training for entry/exit procedures. Additionally, we address traffic management techniques, adapting aircraft types for capacity, and handling weather-related challenges.
E N D
Pilot considerations and pilot solutions Session 5 Presentation 2
Construction plan • Availability of runways • After hours availability of construction runway • determine availability • Ensure proper marking of construction sites • Runway recall determine the time • FOD ensure management plan implemented
Runway use • Multiple runways • shortened runway considerations: • Obtain revised performance charts • Use most suitable aircraft type • Only use runways with approach slope guidance • Single runway • Entry /exit procedure training
Traffic Management • Flow capacity • Adapt the aircraft type for capacity • Use any extended airport operating hours • Arrivals and departures control ground hold better airborne holding • Arrival and departures ATC requirements additional holding fuel
Weather • X wind • aircraft type suitable for expected conditions • carriage of alternate fuel
Not common considerations • Use of new aircraft type crew familiarization