An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Old Mill School Modernization Summer 2011

  2. Old Mill Bond Election Project List Not Included in the Project Safety and Communication Replace outdated fire alarm system Replace outdated clock, bell and paging system American Disabilities Act compliance Food service kitchen compliance Building Systems and Renovation Repair or replace aging electrical system Upgrade inefficient lighting systems Upgrade computer wiring and infrastructure Repair or replace aging plumbing system components Repair or replace leaking or deteriorating roofs Paint interior and exterior of buildings Replace flooring Repair or replace windows, doors, hardware and signage Repair or replace damaged restroom surfaces and fixtures Repair or replace cabinets and countertops Modernize lower-level classrooms Site Improvements Construct solar ready covered outdoor eating area Restore or resurface deteriorating concrete or blacktop Site Improvements Construct solar ready covered outdoor eating area It was determined during the Public Input process and Design Development that the community and school staff did not want covered outdoor eating areas, so this was not included in the project

  3. After Before 1960’s Addition with storefront windows Windows, paint, roof, doors, lights, gutter, landscape, ramp, stairs, and railings

  4. After Before 1960’s Addition with storefront windows Windows, paint, roof, doors, lights, gutter, landscape, ramp, stairs, and railings

  5. After Before 1960’s Addition with storefront windows Windows, paint, roof, doors, lights, gutter, landscape, ramp, stairs, and railings

  6. After Before Flagpole, windows, window repair, paint, roof, lights, gutter, landscape, ramp, stairs, railings, door replaced with window

  7. After Before Window repairs, paint, roof, lights, gutter, landscape, ramp, stairs, railings

  8. After Before Window repairs, paint, roof, gutter, landscape, replace door, with wall walkway, ramp, and railings

  9. After Before Non compliant doors, landing and stairs leading to nowhere Windows, window repairs, paint, roof, gutter, landscape, remove landings and stairs, replace doors with windows

  10. After Before Windows, paint, roof, doors, lights, gutter, landscape, ramp, stairs, railings, remove landings and stairs, replace doors with windows

  11. After Before 1960’s Addition with storefront windows Windows, paint, roof, replace doors with wall, gutter, and landscape

  12. After Before 1960’s Addition with storefront windows Windows, paint, roof, replace doors with wall, gutter, and landscape

  13. After Before Non compliant door access, and slippery floor mats Realign walls, paint, pin-up panels, abrasive action flooring, doors, Non-wax flooring, new fire alarm, new clock bell system, and electrical upgrade

  14. After Before Move walls for new exit doors, non-wax flooring, abrasive action flooring , Non-wax flooring, new fire alarm, new clock bell system, and electrical upgrade

  15. After Before Non-wax flooring, abrasive action flooring, new fire alarm, new clock bell system, and electrical upgrade

  16. After Before Non compliant door access, and slippery floor mats Realign walls, paint, pin-up panels, abrasive action flooring, and doors

  17. Before After Door to non-complaint landings and stairs Replace door with window, window repairs, blinds, new fire alarm, new clock bell system, and electrical upgrade

  18. After Before Door to non-complaint landings and stairs Replace door with window, window repairs, blinds, new fire alarm, new clock bell system, and electrical upgrade

  19. After Before Classroom door at bottom of stairs Replace door with wall, paint, pin-up panels, stair treads, railings, wheel chair lift, and non-wax flooring

  20. Before After Widen hallway, skylights, paint, pin-up panels, stair treads, railings, exit doors, cubbies, lighting, ceiling, new fire alarm, new clock bell system, and electrical upgrade, flooring

  21. After Before Widen hallway, skylights, paint, pin-up panels, stair treads, railings, doors, cubbies, lighting, ceiling, new fire alarm, new clock bell system, and electrical upgrade, flooring

  22. After Before Widen hallway, skylights, paint, pin-up panels, stair treads, railings, doors, cubbies, lighting, ceiling, new fire alarm, new clock bell system, and electrical upgrade, flooring

  23. After Before New windows, replace door with wall, paint, pin-up panels, window shades, carpet, ceiling, new fire alarm, new clock bell system, and electrical upgrade

  24. After Before Remove all TV, heater, cabinets, carpet, counter, and lighting

  25. After Before Non-compliant stairs

  26. After Before Sloping blacktop, tilting lunch tables Window repair, door replaced with wall, paint, roof, gutter, level lunch table landing, safety rail, new PTA Garden, black top play events

  27. After Before Window repair, door replaced with wall, paint, roof, gutter, level lunch table landing, safety rail, striping, and black top play events

  28. After Before Deck, paint, seat wall, level lunch table landing, new PTA Garden

  29. After Before Paint, roof, gutter, ramps, deck and safety rail, striping

  30. After Before Window repair, door replaced with wall, paint, roof, gutter, level lunch table landing, safety rail, striping, roof venting, and black top play events

  31. After Before Boys restroom had an interior ramp to urinals All new

  32. Before After Paint, and compliant concrete deck

  33. After Before Windows, roof, new electrical service, railings, gutter, roof vents, paint, and compliant concrete deck

  34. After Before Non-compliant stairs and railings Windows, roof, new electrical service, railings, gutter, roof vents, paint, water fountain, electrical switch gear, and seat pads

  35. Before After Electrical service with spring running through it Electrical service moved to new location, new sub panel installed above water line

  36. After Before Windows, roof, roof vents, new electrical service, railings, gutter, paint, seat pads, asphalt, new play structure box and surface

  37. After Before New PE office exterior entrance, new building addition for entry doors, roof, lights, railings, stairs, gutter, paint, landing, and water fountain

  38. After Before Non-compliant lunch benches New benches, retaining wall, and asphalt

  39. After Before Roof, vents, and exhaust fans

  40. After Before Roofs, gutters, vents and paint