Daimler Wind Tunnel Project

Daimler Wind Tunnel Project. Project Review. Capstone Team Andre Nylund Chris Grewell Craig Lechtenberg Fadel Al Jutail Matt Melius Mufeed Yacoub Team Advisor Dr. Raul Bayoán Cal Customer Daimler Trucks North America. Project Review. Tunnel Details 12,000 sq. ft. facility

nixie
Télécharger la présentation

Daimler Wind Tunnel Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Daimler Wind Tunnel Project

  2. Project Review • Capstone Team • Andre Nylund • Chris Grewell • Craig Lechtenberg • Fadel Al Jutail • Matt Melius • Mufeed Yacoub • Team Advisor • Dr. Raul Bayoán Cal • Customer • Daimler Trucks North America

  3. Project Review Tunnel Details • 12,000 sq. ft. facility • Wind speeds up to 65 mph • 30ft long test section 21ft wide 26ft tall

  4. Project Review • Pressure sensitive floor for calculating trucks drag coefficient. • Smoke wand for flow visualization Tunnel Details • Rotating floor panel to test various angles of attack

  5. Project Review Mission Statement: Improve smoke testing methods • Increase the testable area within the wind tunnel • Increase stability of the system • Deliver smoke to location of interest accurately • Provide these requirements while maintaining negligible aerodynamic impact to test region • Delivery of final product by June,16th

  6. General Scope Modification Modified Scope • Design Complete System • Build Roller Box Original Scope • Design Complete System • Build Complete System

  7. Concept Design Wand Support Rollers Drive Motor Wind Tunnel Wall Horizontal motion Vertical motion Tunnel seal Vertical Rails Vertical Carriages Smoke Wand Horizontal Rail Horizontal Carriage

  8. Final Detailed Design

  9. Horizontal motion Roller box Allows the smoke wand to move in and out of the tunnel while being supported Linear actuator Pre-fabricated

  10. Vertical motion • Trolley • Designed with simple fabrication and installation in mind • Lifting motor • Drive system • 700 lb/in • 10 ft/min • 1.5 hp • Ball screws • 1” X 0.5” (OD X Pitch) • 21’ Long

  11. Tunnel seal Rolling shutters • Custom fit shutters to prevent pressure from escaping from the wind tunnel

  12. Roller box components • Flat Roller Beam (2X) • Angular Roller Beam (2X) • Rubber Roller Wheel (16X) • Roller Housing • Roller Clamps-Upper and Lower Roller Box

  13. Roller Box

  14. Stability • Four sets of rollers • Sixteen points of contact Roller Box • Adjustability • Two adjustable set screws/roller assembly • Angel variation • Upper and lower brackets are loosened to rotate

  15. Final Design Progress • Horizontal motion (completion 6/6/2012) • Linear actuator • Roller box (65% complete fabrication) • Vertical motion (completion 5/30/2012) • Trolley • Lifting motor (70% complete design) • Tunnel seal (completion 5/30/2012) • Rolling shutters (70% complete design)

  16. Questions