1 / 23

Rehabilitation of Flat Creek, Teton County, Wyoming; Planning, design and implementation

Project Goal. Reduce icing and winter flooding of Flat Creek through stream improvements which allow the creek to approach its fisheries and ecological potential. Project Tasks. PHASE 1:Conduct a planning and feasibility study to determine the aquatic habitat limitations of Flat Creek and recom

noelle
Télécharger la présentation

Rehabilitation of Flat Creek, Teton County, Wyoming; Planning, design and implementation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Rehabilitation of Flat Creek, Teton County, Wyoming; Planning, design and implementation A cooperative effort between: Trout Unlimited, Jackson Hole Chapter Teton Conservation District Town of Jackson Teton County Wyoming Game and Fish Department HabiTech, Inc Others

    2. Project Goal Reduce icing and winter flooding of Flat Creek through stream improvements which allow the creek to approach its fisheries and ecological potential

    3. Project Tasks PHASE 1:Conduct a planning and feasibility study to determine the aquatic habitat limitations of Flat Creek and recommend likely concepts and strategies for rehabilitation; PHASE 2:Conduct a detailed siting and design study leading to the recommendation of specific rehabilitation treatments and the submittal of necessary documents to the appropriate state and federal agencies for permitting purposes; PHASE 3:Implement the recommended and permitted rehabilitation treatments and provide a post implementation evaluation.

    4. Project Priorities Winter icing and flooding; Discontinuing thaw well use and not adding additional thaw wells; Storm water runoff storage in stream banks and sediment load management; Fish habitat

    5. Project Priorities

    6. Project Priorities

    7. Whats been done to date? Completion of 2 reaches Monitored & Analyzed Results on first 2 reaches 1st reach flood 2nd reach with stood coldest winter in recent history Preliminary design of Karnes Meadow Reach Site specific survey and hydraulic modeling Development of improvement concepts

    8. Reach #1 Downstream of Hwy 191 to High School Road

    9. Reach #1 Downstream of Hwy 191 to High School Road

    10. Reach #1 Downstream of Hwy 191 to High School Road

    11. Reach #1 Downstream of Hwy 191 to High School Road

    12. Reach #1 Downstream of Hwy 191 to High School Road No Frazil ice production during extreme cold (-10F) Surface Ice Formation

    13. Reach #1 Downstream of Hwy 191 to High School Road Flood What did we learn Will it happen again

    14. Reach #2 Downstream of Saddle Butte Bridge to Hwy 191

    15. Reach #2 Downstream of Saddle Butte Bridge to Hwy 191

    16. Reach #2 Downstream of Saddle Butte Bridge to Hwy 191

    17. Reach #2 Downstream of Saddle Butte Bridge to Hwy 191

    18. Reach #2 Downstream of Saddle Butte Bridge to Hwy 191

    19. Reach #2 Downstream of Saddle Butte Bridge to Hwy 191

    20. Reach #2 Downstream of Saddle Butte Bridge to Hwy 191

    21. Reach #2 Downstream of Saddle Butte Bridge to Hwy 191

    22. Reach #2 Downstream of Saddle Butte Bridge to Hwy 191

    23. Reach #3 Karnes Meadow

    24. Reach #3 Karnes Meadow

More Related