An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alachua CountyBoard of County Commissioners NW 16th AVENUE / NW 23rd AVENUE FROM NW 57th Terrace to NW 13th Street

  2. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue PROJECT LOCATION NW 16th Avenue / NW 23rd Avenue (From NW 57th Terrace to NW 13th Street)

  3. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue • Present 60% Plans • Next steps • Questions & Comments Presentation outline

  4. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue PUBLIC INVOLVEMENT TO DATE October 27, 2009 Board of County Commissioners November 16, 2009 Public Meeting December 1, 2009 Bicycle/Pedestrian Advisory Board February 23, 2010 Board of County Commissioners June 7, 2010 BPAB & Gainesville Cycle Club October 12, 2010 Board of County Commissioners December 15, 2010 Joint City & County Workshop January 11, 2011 Board of County Commissioners January 25, 2011 Board of County Commissioners March 17, 2011 City of Gainesville Commission July 12, 2011 Board of County Commissioners

  5. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue July 12, 2011 BOCC Meeting Approve proposed typical section Direct staff to proceed with the development of 60% plans in regards to the NW 16th Ave./NW 23rd Ave. resurfacing project Infill sidewalk to the curb, expand to 10 feet where practical and cost effective, ensuring a stable, smooth, and level surface the length of the corridor

  6. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue PROJECT ELEMENTS Rehabilitate the existing asphalt pavement by milling to the limerock base and resurfacing with 3 inches of new asphalt. Upgrade all existing pedestrian components to satisfy ADA requirements as required by Federal Law. Improve existing pedestrian accommodation by widening existing sidewalks as much as practical and feasible. Improve pedestrian and bicycle accommodation by widening existing sidewalks and remarking the roadway on NW 16th Boulevard and NW 16th Avenue to provide a wider outside lane and designating the lane as a shared lane for both bicycles and vehicles.

  7. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue PROJECT ELEMENTS Improve safety by extending the existing 5 lane section from NW 55th St. west to NW 57th Terrace, closing two existing median openings and converting one existing median opening to a directional opening. Reconfigure the north and south legs of the NW 55th St. intersection to provide a dedicated left turn lane and a through lane in each direction to improve capacity and safety. Rehabilitate two sections of leaning retaining wall on NW 16th Avenue by lowering the wall height and placing a new layer of concrete on the wall face. Total Estimated Project Cost = $7,136,200* *Includes 10% contingency

  8. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue PROPOSED TYPICAL SECTION NW 23rd Avenue

  9. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue PROPOSED TYPICAL SECTION NW 16th Blvd.

  10. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue PROPOSED TYPICAL SECTION NW 16th Ave.

  11. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue SIDEWALK IMPROVEMENTS Infill sidewalk to the curb

  12. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue SIDEWALK IMPROVEMENTS Expand to 10 feet where practical and cost effective 10 ‘ Wide Sidewalk 10 ‘ Wide Sidewalk

  13. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue SAFETY IMPROVEMENTS Extend 5 lane section on NW 23rd Ave. from NW 55th St. to NW 57th Terrace Close existing median opening just east of NW 43rd St. and convert existing opening at the Publix/Fresh Market driveways to a directional opening permitting only left turns to the driveways Close existing median opening just west of NW 13th St. Reconfigure the NW 55th St. intersection to improve capacity and safety.

  14. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue • Finalize Plans for Bidding – February 2013 Looking ahead

  15. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue • Approve 60% Plans • Direct staff to proceed with development of 100% plans and advertise project for bids RECOMMENDATIONS

  16. Alachua CountyBoard of County Commissioners THANK YOU • Any Questions?

  17. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue NW 58th Blvd NW 57th Terrace Northwest Baptist Church NW 55th St NW 55th Terrace return

  18. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue return

  19. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue Villa Ravine Apts. Georgetown Apts. Gesalt Center Holy Trinity Jodi Messler School of Dance Citgo Georgetown Apts. Close Opening Starbucks NW 13th St return

  20. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue NW 55th St Northwest Baptist Church NW 55th Terrace return

  21. HDR Engineering Gainesville NW 16th Avenue / NW 23rd Avenue Sidewalk Improvements The existing 2.5 foot wide grass strip between the curb and the existing sidewalk will be filled with new concrete sidewalk for a total concrete width of 7.5 feet. The outer 6 inches will be beveled to the top of the existing curb to provide a smooth connection resulting in a minimum useable sidewalk width of 7 feet. Existing sidewalk that is badly cracked or broken will be completely replaced. A 10 foot wide sidewalk (9.5 feet useable width) will be provided on the north side of NW 23rd Avenue from NW 57th Terrace to NW 43rd Street. A 10 foot wide sidewalk (9.5 feet useable width) will be provided on the south side of NW 16th Boulevard from NW 43rd Street to NW 34th Street.