An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jawaharlal Nehru National Solar Mission Ministry of New and Renewable Energy Government of India

  2. India’s Energy Challenge In next 12 years India’s electricity requirement to grow 2.5 times Electricity shortage estimated at 25-35 GW 400 Million people still without access to electricity Climate Change is also an important issue India is dependent on oil imports for 80% of its demand

  3. Indian Power Sector (30 June 2012)

  4. Renewable Power Capacity(30 June 2012)

  5. Plan-wise Renewable Capacity Addition

  6. Renewable Energy Projections for 2027 Cumulative Installed Capacities in GW

  7. India’s National Action Plan on Climate Change (NAPCC) • National Action Plan on Climate Change was released by Hon’ble Prime Minister of India on 30th June, 2008. • Eight Missions were envisaged on • Solar Energy, • Enhanced Energy Efficiency, • Sustainable Habitat, • Water, • Sustaining the Himalayan Eco-system, • Green India, • Sustainable Agriculture and • Strategic knowledge for Climate Change

  8. Jawaharlal Nehru National Solar Mission (JNNSM) One of the eight Missions under National Action Plan on Climate Change Launched by the Government of India in January 2010. JNNSM is one of the major global initiatives in promotion of solar energy technologies. Mission aims to achieve grid tariff parity by 2022 through Large scale utilization, rapid diffusion and deployment at a scale which leads to cost reduction R&D, Pilot Projects and Technology Demonstration Local manufacturing and support infrastructure 8

  9. Mission Road Map 9

  10. Mission Road Map In addition, 100 MW capacity distributed small grid connected power plants during Phase -1

  11. Enabling policy and regulatory frame work Supporting Utility scale power generation Emphasis equally on grid & off-grid applications Accelerating Research and Development Enhancing Domestic manufacturing base National Solar Mission: Strategy

  12. Policy and Regulatory Framework • Amendment of National Tariff Policy for solar specific RPOs • Solar specific RPO - 0.25% in Phase 1 (2013) to increase to 3% by 2022; • REC Mechanism • Encourage state specific solar policies • State-wise RPO Orders by Regulators • Exemption from environmental clearance for solar power projects

  13. JNNSM (Phase 1) - Key Deliverables • 1,100 MW Grid Solar Power Projects • 200 MW Off-grid Solar Applications • 7 million Sq. m solar thermal collector area • R&D and HRD; Centers of Excellence • Domestic Manufacturing • Institutional arrangements for implementation of activities under the Mission

  14. JNNSM : Phase-I, Batch-I

  15. JNNSM : Phase-I, Batch-II

  16. State-wise Capacity

  17. Growth in Solar Power Installations

  18. Solar Power Installations • Under the national programme, over 280 MW capacity projects connected to the grid • Large projects = 130.0 MW (Out of 140 MW) • Small Plants = 80.55 MW (Out of 98 MW) • Migration = 50.5 MW (Out of 84 MW) • Other Schemes= 21.5 MW • Through the encouragement provided by the JNNSM, the states have taken initiatives to install over 755 MW capacity projects. Overall achievement is already over 1030 MW.

  19. State Initiatives

  20. Off Grid SPV : Physical Targets and Achievements (Target: 200 MW in Phase-I) Solar Thermal : Achievements • 5.73 million square meter of solar thermal collector area installed so far cumulatively against target of 7.0 million square meter in Phase-I.

  21. Centers of Excellence • IIT Bombay: Research and education in the area of photovoltaics (2009-10) • IIT Rajasthan: Research and education in the area of solar thermal (2011-12) • IIM Ahmedabad: Technology incubation and development of entrepreneurship (2010-11) • CEPT University, Ahmedabad: Solar passive architecture and green building technologies (2010-11) • Amrita Vishwa Vidyapeetham, Cochin: Integrated nano-material based Photo Voltaic-storage devices (2010-11) • IISc. Bangalore: Proposal is under consideration for decentralized solar thermal power applications

  22. Research Infrastructure Augmentation (Universities/ R&D institutions) • R&D Policy is in place to support R&D projects in Universities, academic institutions, research laboratories and in industries • Type of projects covered under the policy include • Centres of excellence in thematic areas of research • Applied research • Technology validation and field evaluation • Capacity building • Currently, 18 projects in photovoltaics and 17 in solar thermal areas are under implementation

  23. Research Infrastructure Augmentation (Universities/ R&D institutions) • Implementing institutions include • IIT Bombay, IIT Delhi, IIT Kanpur, IIT Rajasthan • CSIR laboratories, NPL, NCL, Indian Inst of Chemical Tech • Universities: Delhi, Pune, BESU, KIIT, Jain University, Cochin University of S&T, • IACS, Indian Institute of Petroleum, TERI • Industries : Moser Baer, Maharishi Solar, Sunborne, ATE Pune, Clique Dev, Thermax, Megawatt Solutions, • Others: WRST; DST Lakshadweep.

  24. Specific R&D Thrusts • CPV • One proposal from IIT Kanpur is under consideration aiming at development of Si solar cell • Development of high temperature photovoltaics • Ga As is usually used • Cooling mechanisms are usually applied. • Heat Cycles for solar thermal with air as heat sink • Being tried out in solar tower project by Sunborne • Covered in the scope of work at IIT Rajasthan project • Pilot project is also being planned

  25. Materials and Components • Receiver for Parabolic Trough Technology: Challenges • Glass to Metal seals • Vacuum Receiver • High temperature and low emittance selective coating • Advanced power converter modules for PV • Covered under BESU and IIT Bombay Projects • Self cleaning reflector surfaces • Receiver Modules for central tower • Covered under Sunborne Project

  26. New Photovoltaic Materials • Organic solar cells using organic-inorganic semiconductor hybrid absorber – IIT Delhi • Dye Sensitized Solar Cell (DSSC) – IICT, Hyderbad • Novel Doped 3-D Nanoporous Oxides for Dye-Sensitized Solar Cells – IIPM, Dehradun • Salmon DNA-Conducting Polymer (P3HT) - Quantum Dot (CdSe) - Carbon Nanotube (SWNT) – University of Delhi • Titanianano-structured thin film based for developing DSSC – Amrita University, Cochin • Design and Development of Organic Solar Cell Sub-Modules – IIT Kanpur

  27. Pilot CSP Projects • Planned with NCEF and ADB support • Air/ hybrid cooling • Large thermal storage • Base load capacity solar stand alone plant • Advanced technology with operating temperature over 500 deg C • Proposed to be taken up • Hybridization with natural gas • Solar - biomass hybrid plant • Solar Augmentation of the existing coal thermal power plant • Solar dish Stirling engine

  28. Infra-structure for Solar Energy • Capacity for silicon production • 50 MWp capacity vertically integrated plant by Lanco at Chhattisgarh • A project by Maharishi Solar for development of solar grade Silicon • Some capacities are likely under SIPS by Ministry of IT

  29. CERC Tariff Vs. Bid Tariff

  30. Network of Solar Radiation Monitoring Stations in India

  31. Mandatory Solar RPO Mechanism • State Electricity Regulators to fix a percentage of energy purchased from Solar Power under RPO. • The Solar RPO has to begin with 0.25 % of the energy procured reaching 3% by 2022. • This requirement likely to go up to 30,000 MW by 2022.

  32. Current state-wise Solar RPO targets Source: RPO regulations of the respective states

  33. Current state-wise Solar RPO targets Source: RPO regulations of the respective states

  34. Captive Compliance Requirement

  35. Solar REC trade @ IEX

  36. S-REC Traded @ IEX

  37. 2.5 MW Unit of a 10 MW capacity project at Bikaner by ACME

  38. 1 MW PV Plant at Osamabad

  39. 5 MWp SPV Plant at Khimsar, Rajasthan

  40. SPV Power Plant at Goshen Drass Kargil (40 kWp)

  41. Solar Thermal System for Steam Generation at ITC Hotel, New Delhi

  42. Projected Growth

  43. Exemption from Taxes • Vide Custom Notification No. 25/1999 dated 28th February, 1999 there was no customs & Excise duty on cells and modules but some raw materials required to manufacture cells and modules attract 5% customs duty and CVD. • Vide Custom Notification No. 32/2012 dated 8th May, 2012 importation of Plant & Machinery for initial setting up of solar power projects is exempted from Additional Custom Duty and the total custom duty leviable has come down from 9.35% to 5.15%. • Vide Notification No. 31/2012 dated 8th May, 2012 goods required for manufacturing of solar cells and modules have been exempted from Additional Custom Duty and the total custom duty leviable has come down to 9.35%.

  44. Solar Resource Maps for India

  45. Ground Measurements of Solar Radiation • C-WET is implementing the project for setting up 51 ground monitoring stations • Centralized data collection, analysis and calibration of measuring sensors

  46. Solar Energy Centre • Solar Energy Centre (SEC) near New Delhi under the Ministry is the lead Centre for testing and training in solar energy in the country • SEC has NABL accredited testing facilities for PV module qualification as per Indian and International standards • SEC is imparting training in solar energy at various levels • SEC is regularly conducting international training programmes in solar energy with MEA • Several research and technology validation projects are being set up at SEC.

  47. National Solar Thermal Power Testing, Simulation and Research Facility • 1MWe Solar Thermal Power Plant • - Research and Demonstration plant • - Combination of different collector fields • (Direct and Indirect Steam Generation) Linear Fresnel Field - 7200 sq. m - 2.2 MWth (Design) • Parabolic Trough Field • 8700 sq. m • 3.3 MWth (Design) Turbine operating conditions: saturated steam at 3500 C and 40 bar

  48. Thank You www.mnre.gov.in