TEP

TEP. 2008 BTA N-1-1 Studies RMR Studies Extreme Contingency Studies. N-1-1 Studies. TEP studies simultaneous outage of all combinations of two transmission elements, whether common mode or unrelated

ocean-young
Télécharger la présentation

TEP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEP 2008 BTA N-1-1 Studies RMR Studies Extreme Contingency Studies

  2. N-1-1 Studies • TEP studies simultaneous outage of all combinations of two transmission elements, whether common mode or unrelated • Simultaneous outage of two elements is equivalent to having one of them IOS and then losing the other • TEP survived all combinations of two transmission elements • 15 TEP-owned singles plus Cholla-Saguaro are included in the TOLS tables

  3. RMR Studies

  4. Extreme Contingency Studies Extreme contingency considered to be loss of all EHV transformers at a TEP substation (Tortolita, Vail or South): • TEP can survive loss of all EHV xfmrs at any substation: Tortolita, South, & Vail. • These outages are included in Tie Open Load System tables. TEP operates using “load Shed” tables • Fast switched reactive devices and/or direct load trip arming