1 / 28

Thai Generator Association 28 Oct 2021 V1

Ergonomics proceeding

Télécharger la présentation

Thai Generator Association 28 Oct 2021 V1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DISCOVER NEW ENERGY Diesel Generator Diesel Generator Hybridization Hybridization October 28, 2021 October 28, 2021 07.00 p.m. to 08.30 p.m. (Bangkok Time) 07.00 p.m. to 08.30 p.m. (Bangkok Time) Featured Speaker : Featured Speaker : Mr.Shaun Mr.Shaun Montgomery Montgomery

  2. Xelectrix HISTORY Begins in 1935 Construction equipment beginnings Needed solution for their own Crushing products Establishment of xelectrix Power in 2016 All this to ensure that we play a major part in global climate sustainability.

  3. GLOBAL CHALLENGES Climate change demands reduction in fossil fuels 1 Global trend towards electrified construction equipment 2 Charging of this equipment is required (for customers and rental fleets) 3 Emission regulations in urban areas 4 The grids will not be able to cope with this Construction BEV expansion 5

  4. CONSTRUCTION SITE OF THE FUTURE 6 EFFICIENCY EFFICIENCY ENVIRONMENT ENVIRONMENT 1 CONSTRUCTION CONSTRUCTION VEHICLES The backbone behind the charger VEHICLES / / E E- -MOBILITY MOBILITY 1 5 DIESEL DIESEL GENERATORS GENERATORS Hybridize to save PROFITABILITY PROFITABILITY DRIVERS LEGISLATION LEGISLATION 2 INNER INNER CITY It´s the law…. CITY 2 3 4 PRODUCTIVITY PRODUCTIVITY CONNECTIVITY CONNECTIVITY RENTAL RENTAL SaaS – Storage as a Service 4 3

  5. The future has started ZERO FUEL ZERO NOISE UP TO 50% LESS DG RUNTIME ZERO EMISSIONS HIGH AMP OUTPUTS WITH ONBOARD DB UP TO 60% DOWNSIZING ISLAND, HYBRID, BACKUP MODE HIGH VOLTAGE

  6. Power Box Product Overview / Applications WALL RANGE XPB-W11 11 kW / 20-40 kWh BASIC SPLIT RANGE XPB-B35 35 kW / 60-240 kWh XPB-W35 35 kW / 40 kWh XPB-B11 11 kW / 40-240 kWh XPB-B80 80 kW / 100-240 kWh CORE PRODUCTS XPB = xelectrix Power Box W = WALL B = BASIC SPLIT P = PRO U = UNLIMITED PRO RANGE XPB-P11 11 kW / 20-120 kWh UNLIMITED RANGE M10 (10ft container) 35 kW / 60-240 kWh 80 kW / 100-240 kWh 150 kW / 180-240 kWh XPB-P35 35 kW / 40-120 kWh M20 (20ft container) 35 kW / 240-480 kWh 80 kW / 240-480 kWh 150 kW / 240-480 kWh 1st VALUE = Inverter Power in kW 2nd VALUE = Battery Capacity in kWh M = U Range container sizes in feet TS = B Range with Backup Option (Transformer and Switch Function) XPB-U80-200-M10 XPB-B80TS-80-SPLIT For project specific requests please contact us directly!

  7. Our solutions Up Up to massive massive emission emission and to 50% Fuel 50% Fuel Burn Burn Reduction Reduction and and maintenance maintenance reductions and DIESEL GENERATOR HYBRIDIZATION DIESEL GENERATOR HYBRIDIZATION Stabilization of load curve, Genset Switch Off 1 reductions PEAK POWER BOOST PEAK POWER BOOST Ability to SUM UP power from Genset or Grid Running Running a a construction construction site or or Grid Grid cannot cannot provide site when when the enough Power the Genset Genset Power 2 provide enough 1 OFF GRID CHARGING OFF GRID CHARGING Charging when there is no Grid Green Power Green Power when when and and where where you you need need it it 3 Battery Battery capacity capacity can reduced reduced to to suit v can be site requirements requirements be easily easily added added / / MODULAR, ROBUST AND FLEXIBLE MODULAR, ROBUST AND FLEXIBLE Designed for the construction industry 4 suit site RENEWABLE ENERGY PLUG IN RENEWABLE ENERGY PLUG IN Multiple power source connection Further Further cost v cost and and emission emission reductions reductions 5 REMOTE MONITORING AND REPORTING REMOTE MONITORING AND REPORTING Knowing what is happening On On- -board Data Collection Module board Data Collection Module with Cloud Cloud interface interface v with 6 xelectrix-power.com

  8. xplained CONSTRUCTION SITE OF THE FUTURE DISCOVER NEW ENERGY ➢ CO2Reduction ➢ Environmental Responsibility 1 2 ➢ Diesel Generator Hybridization is is massively positive for environmental sustainability and cost of operation. ➢ Ability to utilize under-powered grids to meet add. Requirements 3 4

  9. UNIQUE FEATURES POWER ELECTRONICS POWER ELECTRONICS Bi Directional, fully hybrid inverter PARALLEL POWER TECHNOLOGY 1 kW – 150 kW Power 3 Phase, AC Coupled, Frequency Inverter Island Mode / Backup 1 BATTERY STORAGE BATTERY STORAGE LFP intrinsically safe 20 kWh modules XP Battery Management in every module Integrated thermal fire extinguisher 20 kWh – 480 kWh 2 NAM (Network Analysis Module) NAM (Network Analysis Module) In-house development for pricise and quick measurement 3

  10. Power Box Hillhead 2021 benefits Safety Environmental sustainability Cost savings Plug & Play PLUG AND PLAY COST SAVING CO2 Modular, robust and expandable Multi-functional Working with a company passionate to LEAD Energy, Optimization, Storage, Control xelectrix-power.com

  11. xpsel Real solutions for your application High lifetime savings and attractive ROI´s 50 kVA Diesel Generator 2 XPB-P35- 120 Power Box 3 4

  12. Power Box Applications xpsel

  13. Power Box Applications xpsel

  14. Power Box Applications xpsel

  15. Power Box Applications xpsel

  16. Power Box Applications xpsel

  17. Power Box Applications xpsel

  18. Power Box Applications xpsel

  19. Power Box Applications xpsel

  20. Power Box Applications xpsel

  21. Power Box Applications xpsel

  22. Power Box Applications xpsel

  23. Power Box Applications xpsel

  24. Power Box Applications xpsel

  25. Power Box Applications xpsel

  26. Power Box Example projects Volvo ce Electric launch Paris Application Off-Grid Charging Solution XPB-B80-140 80 kW Power 140 kWh Battery Capacity WHY xelectrix? Transformer Island System Plug & Play

  27. Power Box projects Solar Park H. Gotthalmseder Application Business Park Renewable Energy (PV) EV Charging Solution M40 container system 250 kW Power 360 kWh Battery Capacity WHY xelectrix? Fast reaction/delivery time Modularity and expandability Backup power

  28. Power Box projects KA-TE Sewer Rehabilitation Robots Application Enable clean and quiet work when DG´s are not allowed to operate. Van mounted. Solution Customized System 11 / 35 kW Power 20 / 40 kWh Battery Capacity WHY xelectrix? Developer and Manufacturer Robust Design Good price / performance ratio

More Related