An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RAJIV AWAS YOJANA PRESENTATION ON SFCPoA –BILASPUR, C.G.

  2. Contents • Introduction to Bilaspur City • SFCPoA Fact Sheet • Approach & Methodolgy of SFCPoA • Socio-Economic Survey. • GIS Mapping • Data Analysis. • Housing . • Population Projection. • Funding

  3. Introduction to Bilaspur • Bilaspur city, is the second largest city in the state of Chhattisgarh, spread over an area of 30.24 sqkm with a population of 3,30,106 (2011 Census) ,No of Wards- 66 • The High Court of Chhattisgarh is also located in the city, zonal HQ of S.E.C. Railway, power plants – NTPC, • Planning area (urban aglomaration ) - • includes BMC, 2 ULB, 29 Villages • Total Population of UA /Planning area – 5,07,507 • Total No of Slums – 134 • Total Slum Population – 1,71,301( 34%)

  4. SLUM LOCATION MAP

  5. SFCPoA FACT SHEET • SFCPoA HIGHLIGHTS Contd..

  6. Contd..

  7. Contd..

  8. Contd..

  9. Contd..

  10. Sharing Cost for the Curative & Preventive Strategy (Figures in Crore) Contd..

  11. SFCPoA: Strategy

  12. CURATIVE STRATEGY • Assessment of present status of slums • Slum listing • Slum survey • Data profiling of slum-MIS • Mapping of slums using GIS • Integration of GIS and MIS • Categorization of all slums based on tenability • Prioritization of tenable and untenable slums • Stakeholder Consultations including active Community Engagement • Formulation of slum development options • Detailed analysis of prioritized slums • Formulation of development options

  13. PREVENTIVE STRATEGY • Estimating Urban Poor Housing Shortage & Identifying Supply & Demand Constraints • Framing Future Supply Strategy and Suggest Reforms • Suggesting Reforms to ease identified Supply and Demand Constraints in Urban Poor Housing

  14. SLUM SURVEY: with Community Participation • Discussion made: • Objective of the scheme and the contribution of the beneficiaries • Type of houses to be built and facilities to be provided

  15. DOOR TO DOOR SOCIO-ECONOMIC SURVEY • Allotted unique Household no. • Filling up prescribed format of NBO • Collected livelihood details

  16. Quality Checking BY BMC, BILASPUR

  17. GIS MAPPING

  18. GEO-REFERENCED BASE MAP

  19. SLUM LOCATION MAP

  20. SLUM BASE MAP

  21. GIS – MIS INTEGRATION • MIS Join shape file is to be imported in slum base map. DATA ANALYSIS BY THE GEOGRAPHICAL INFORMATION SYSTEM (GIS) • MIS table is to be joined to the GIS base map with unique field.

  22. VIEW OF GIS-MIS INTEGRATION

  23. SLUM PROFILE -DATA ANALYSIS

  24. HOUSING STATUS

  25. LAND OWNERSHIP OF THE SLUMS

  26. POPULATION DETAIL BASED ON CATEGORY

  27. DETAILS OF CATEGORY, RELIGIOUS & HANDICAPPED PERSON

  28. OCCUPATIONAL PROFILE OF SLUMS DWELLERS

  29. TENURE STATUS OF SLUMS SAMPLE COPY OF TEMPORARY PATTA

  30. 3X3 MATRIX ANALYSIS • Parameters : • Land tenure Status : Legal status of land ownership. • Housing Conditions • Existing quality of Housing and Infrastructure conditions • Infrastructure Availability Matrix Analysis Code Matrix Analysis Code 312 311

  31. INFRASTRUCTURE SCENARIO IN SLUMS

  32. Housing

  33. HOUSING PATTERN • Housing Pattern: It is based on existing housing area, residential density and F.A.R • Possible Density Options:

  34. D.U.PLAN OF ASHOK NAGAR SLUM -Pilot DPR CARPET AREA- 25 SQM. AND BUILT-UP AREA.-30SQM.

  35. PROSPECTIVE VIEW

  36. BLOCK PLAN

  37. POPULATION PROJECTION

  38. PROJECTED POPULATION OF URBAN AGGLOMERATION AREA • Projected Population • Year 2021 -590943 • Year 2031- 674379 • Decadal growth rate for the period 2001 to 2011: • Urban population-18.5 % • Rural population – 39.39 %

  39. ESTIMATED SLUM POPULATION OF URBAN AGGLOMERATION AREA (PERSPECTIVE 20 YEARS) • Projected Population • Year 2021 -209529 • Year 2031-256989 • Decadal growth rate of for the period 2001 to 2011: • Urban population-17% • Rural population – 39.39 % • Note : Decadal growth of rural population is assumed as 30 %

  40. TOTAL HOUSING AND LAND REQUIREMENT FOR CURATIVE AND PREVENTIVE STAGE • Year of Projection –2014-2029 • Maximum Density- 300HH/Ha • Norms adopted: BhumiVikas Niyam,1984..

  41. NO OF SLUMS PHASE WISE & PHASING CRITERIA

  42. FUNDING

  43. SHARING OF THE PROJECT COST • Sharing of the Project Cost: • Central Government • 75 percent of the cost of provisions of basic civic and social infrastructural amenities and housing including O&M of assets created under the scheme. • State Government • – 15 percent of the cost of provision of housing and infrastructure and civic amenitiesand O&M assets. • ULB’s Share • - 10 percent of the cost of infrastructure and civic amenities and O&M assets. • Beneficiary Share • - Minimum 10-12 percent of the cost of housing. • (10 percent in the case of GEN/SC/ST/BC/OBC/PH and other weaker sections)

  44. IMPLEMENTATION PHASING OF SLUMS & FUNDING REQUIREMENT FOR CURATIVE & PREVENTIVE SATGE

  45. Thank you

  46. TENABILITY STATUS

  47. LAND VALUE OF SLUMS • Land values records have been collected from Registrar office, Bilaspur • Categorized into high Medium & low valued land Source-Registrar office, Bilaspur