1 / 12

INTERVENCIONES INTEGRALES

Avenida 34. Plan Especial El Poblado. PUI Nororiental. Interv. Integral Moravia. INTERVENCIONES INTEGRALES. INTERVENCIONES INTEGRALES Plan Especial de El Poblado y Avenida 34. INTERVENCIONES INTEGRALES Plan Especial de El Poblado. INVERSIÓN PROYECTADA A 2006: $ 40.703’000.000.

onofre
Télécharger la présentation

INTERVENCIONES INTEGRALES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Avenida 34 Plan Especial El Poblado PUI Nororiental Interv. Integral Moravia INTERVENCIONES INTEGRALES

  2. INTERVENCIONES INTEGRALESPlan Especial de El Pobladoy Avenida 34

  3. INTERVENCIONES INTEGRALESPlan Especial de El Poblado INVERSIÓN PROYECTADA A 2006: $ 40.703’000.000 PRESUPUESTO 2006 1. Los Balsos: 15.590’ 2. Mejoramiento E. P. Cl 10: 4.000’ 3. El Chispero: 1.000’ 4. Paso sobre Q. La Volcana 263’ Otros proyectos Cerramiento de Lotes 450’ Gerencia del Proyecto 450’ 6. Espacio público Av. El Poblado 5.329’ TRANSVERSAL SUPERIOR 1 2 5 3 TRANSVERSAL INFERIOR CALLE 10 3 LOMA LOS PARRA 4 2 LOMA LOS GONZALEZ 1 LOMA LOS BALSOS 6 AVENIDA DEL POBLADO 4 AGUACATALA AVENIDA LAS VEGAS 27.803’ 6 AUTOPISTA NORTE 7.317’ 5.583’ 2004 2005 2006

  4. 2004 2006 2005 2004 2006 2004 2005 2006 2005 INTERVENCIONES INTEGRALESPlan Especial de El Poblado PRINCIPALES PROYECTOS EN 2006 PASEO URBANO AV. EL POBLADO FEB 06 MAY 06 OCT 06 LOS BALSOS: Doble calzada entre Tv. Inferior y Av. El Poblado, Intercambio vial a desnivel sobre la Av. El Poblado, Prolongación Loma de los González – Loma Los Balsos – Carrera 43 A – Av. Las Vegas. MAR 06 JUN 06 NOV 06 MEJORAMIENTO ESPACIO PÚBLICO. CALLE 10: Construcción Corredor Urbano Cl. 10 MAR 06 JUN 06 OCT06

  5. 2004 2005 2006 SEP 05 MAR 06 COMPRA FAJAS DIC 06 INTERVENCIONES INTEGRALESMoravia INVERSIÓN PROYECTADA A 2006: $ 25.478’000.000  Contratación y construcción del Centro de Desarrollo Cultural.  Contratación de obras civiles y construcción del Centro “Hogares Agrupados”, equipamiento para atención a la infancia del barrio .  Se continúa con los procesos de compra inmuebles para proyectos de infraestructura urbana mediante convenio con la EDU. 12.595’ 8.071’ Vivienda: 11.000 4.812’ Vivienda: 4.812’ Vivienda: 5.324’

  6. 2004 2005 2006 MAR 05 FEB 06 AGO 06 INTERVENCIONES INTEGRALESArea Metrocable INVERSIÓN PROYECTADA A 2006: $ 16.690’000.000  Construcción de obras de mejoramiento urbano bajo la concepción de un desarrollo integral con acompañamiento social. Se adelantan: • Paseo Calle 106 • Paseo Calle 107 • Puentes peatonales. • Puentes vehiculares. • Construcción y adecuación de espacios públicos vecinales. 7.867’ 4.497’ 4.326’

  7. INTERVENCIONES INTEGRALESArea Metrocable PROYECTOS SECTOR SANTO DOMINGO ANILLO 106-106A INICIO: AGOSTO DE 2006 FINAL: NOVIEMBRE DE 2006 COSTO (MILLONES): $550 PUENTE PEATONAL GUADUA INICIO: OCTUBRE 2005 FINAL: FEBRERO 2006 COSTO (MILLONES): $151

  8. INTERVENCIONES INTEGRALESArea Metrocable PROYECTOS SECTOR POPULAR PARQUE PABLO VI INICIO: NOVIEMBRE 2005 FINAL: MARZO 2006 COSTO (MILLONES): $419 UNIDAD DEPORTIVA GRANIZAL Est. Sto. Domingo INICIO: AGOSTO DE 2006 FINAL: DICIEMBRE DE 2006 COSTO (MILLONES): $500 PARQUE LAVADEROS INICIO: OCTUBRE 2005 FINAL: MARZO 2006 COSTO (MILLONES): $216 PUENTE PEATONAL GRANIZAL INICIO: AGOSTO DE 2006 FINAL: DICIEMBRE DE 2006 COSTO (MILLONES): $450 PARQUE LOS HUMEDALES INICIO: NOVIEMBRE 2005 FINAL: MARZO 2006 COSTO (MILLONES): $451 Est. Popular Corredor de la 37 INICIO: MAYO DE 2006 FINAL: NOVIEMBRE DE 2006 COSTO (MILLONES): $1.570 PARQUE LINEAL QBDA LA HERRERA Est. Andalucía 4 INICIO: NOVIEMBRE 2005 FINAL: MARZO 2006 COSTO (MILLONES): $451 Corredor de la 42B C.H. DIVINA PROVIDENCIA INICIO: ENERO DE 2006 FINAL: JUNIO DE 2006 COSTO (MILLONES): $1.578 INICIO: JUNIO 2006 FINAL: JULIO 2006 COSTO (MILLONES): $ 450 Est. Acevedo Río Medellín (Río Aburra)

  9. INTERVENCIONES INTEGRALESArea Metrocable PROYECTOS SECTOR ANDALUCÍA Est. Sto. Domingo PUENTE PEATONAL CRA 48A ANDALUCIA-LA FRANCIA INICIO: NOVIEMBRE 2005 FINAL: MARZO 2006 COSTO (MILLONES): $1.571 DISEÑO Y CONSTRUCCIÓN DEL PUENTE PEATONAL DE LA CRA 48A ENTRE EL BARRIO ANDALUCÍA Y VILLA DEL SOCORRO INICIO: OCTUBRE 2005 FINAL: FEBRERO 2006 COSTO (MILLONES): $325 Est. Popular C.H. QBDA. JUAN BOBO Est. Andalucía INICIO: SEPTIEMBRE 2005 FINAL: MAYO 2006 COSTO (MILLONES): $6.000 Est. Acevedo Río Medellín (Río Aburra)

  10. INTERVENCIONES INTEGRALESObras de Construcciónde Vías – Av. 34 PRESUPUESTO TOTAL DEL PROYECTO: $ 20.000’000.000 5. Avenida 34 200’ 5 TRANSVERSAL SUPERIOR 5 TRANSVERSAL INFERIOR CALLE 10 3 LOMA LOS PARRA 2 LOMA LOS GONZALEZ 1 LOMA LOS BALSOS 6 4 AVENIDA DEL POBLADO 4 AGUACATALA AVENIDA LAS VEGAS AUTOPISTA NORTE 13.813’ 200’ 4.162’ 2004 2005 2006

  11. MEDELLÍN, LA MÁS EDUCADAColegiosEPM PRESUPUESTO TOTAL DEL PROYECTO: $ 160.000’000.000 • Estudios preliminares • Localización, diseño y ejecución de las obras arquitectónicas, urbanas y técnicas • Análisis de los proyectos planteados de acuerdo a las necesidades de la comunidad • Identificación de problemas técnicos, arquitectónicos y urbanos y sus potencialidades 100.000’ 20.000’ 2004 2005 2006

More Related