Thursday 10 th January

Thursday 10 th January. 9:30 Network routers restart, all went fine, but only just. 12:00 All power converters from the arcs on at standby 12:00 ELQA test finished Still some selected accesses 17:40 Cryo Maintain OK for all sectors 18:37 Cryo OK complete machine

orinda
Télécharger la présentation

Thursday 10 th January

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Thursday 10th January 9:30 Network routers restart, all went fine, but only just. 12:00 All power converters from the arcs on at standby 12:00 ELQA test finished Still some selected accesses 17:40 Cryo Maintain OK for all sectors 18:37 Cryo OK complete machine Test of circuits and QPS 22:55 All vacuum valves open 00:48 All HWC tests finished 02:41 BIS loops closed 06:50 RF conditioning M1.B1 finished LHC 8:30 meeting

  2. Network routers restart – IT department • The restart of the routers did affect the LHC • Many cryo valves closed IP8. Stop of compressors just avoided because of the cryo crew was ready to react. • ODH in IP2 (as displayed in CCC) • Linac2 Vistar BCT (trafo) readings • Good that it was a coordinated reboot following yesterday’s request by IT LHC 8:30 meeting

  3. Decided on polarities LHC 8:30 meeting

  4. Outstanding • RF • “Module 1B1 has 2 cavities that need further conditioning overnight. We would make them operational early morning to-morrow.” Finished this morning at 6:50 • RF interlock cav4.B2: piquet called • RF low-level set-up going on right know: 1 hour • Power converters to be changed • 60 A corrector pc RCBV12.L7B2 • 60 A corrector RCBV28.R1B1 • CMS shielding at top of pit? LHC 8:30 meeting

  5. The plan • John’s master plan, as presented yesterday, can be found via “latest news” page. • Today: • RF low-level set-up (1 h) • Change 2 pc (2 h) • Take first beams • Test ramp with dump at flat top • Set-up of squeeze, optics measurements • TDI, BPMS LHC 8:30 meeting