1 / 24

Global Briefing September 19, 2013 Jodie Love

Global Briefing September 19, 2013 Jodie Love. Virginia Port Authority Structure. Mid Atlantic U.S. Location. The Port of Virginia is within a day’s drive of two-thirds of the U.S. population . VPA Terminals. Cargo Terminals Hampton Roads Harbor. NNMT. NIT. Future CIMT. APM Terminals.

orrick
Télécharger la présentation

Global Briefing September 19, 2013 Jodie Love

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Global BriefingSeptember 19, 2013Jodie Love

  2. Virginia Port Authority Structure

  3. Mid Atlantic U.S. Location The Port of Virginia is within a day’s drive of two-thirds of the U.S. population

  4. VPA Terminals

  5. Cargo Terminals Hampton Roads Harbor NNMT NIT Future CIMT APM Terminals PMT

  6. Richmond Deepwater Terminal

  7. James River Barge Line – 64 Express • Weekly calls between the Port of Virginia and the Port of Richmond • Calls at NIT and PMT • Door service availability • Green transportation alternative

  8. Virginia Inland Port • Five-day-a-week rail service between the VIP and the Hampton Roads marine terminals • Within 1 mile of Interstate 66 and within 5 miles of Interstate 81

  9. Top 10 U.S. Ports

  10. Top 10 U.S. East Coast Ports

  11. 2012 Top Commodities Source: PIERS

  12. 2012 Top Trading Partners Source: PIERS

  13. 2012 Top Customers Source: PIERS

  14. Intermodal Gateway Over 1.9 million TEUs moving over the Port in 2012 were transported by: 4% Barges 32% Rail 64% Trucks Source: Terminal Operator CY2012

  15. Growth Track NS CSX Both CSX and Norfolk Southern are upgrading their rail network in order to send double-stack trains from east coast ports like Virginia to the mid-west.

  16. Economic Impacts • The Port of Virginia is an economic engine for the Commonwealth • 343,000 port and port-related jobs statewide • $41 billion in business revenues • $1.2 billion in state and local taxes • Increased port growth results in more jobs and revenues for the Commonwealth Source: 2006 Economic Impact Study by William & Mary Mason School of Business

  17. Selected Distribution Facilities Using The Port of Virginia

  18. Panama Canal vs. Suez Canal Port of Virginia Hong Kong, China Suez Canal Suez Canal Panama Canal Via Panama Canal Distance: 11,021 nautical miles Via Suez Canal Distance: 11,705 nautical miles

  19. Panama Canal Expansion - New Locks Will Accommodate Post-Panamax Vessels 160’ 106’ 18 containers wide 13 containers wide 110’ 180’ Existing Locks Post-Panamax Locks

  20. U.S. East Coast Competitive Ports Water Depth 4,500 TEU 38 ft 8,500 TEU 42 ft Savannah 45 ft Charleston NY/NJ (2012) 12,500+ TEU 50 ft Norfolk Norfolk 55 ft (authorized) Jacksonville Wilmington, NC Baltimore Based on fully loaded vessel

  21. MSC Bruxelles • At 1,105 feet long, the MSC Bruxelles holds the record for the biggest containership ever to enter the Hampton Roads Harbor. • Vessels of this size regularly call on The Port of Virginia • Our channels and terminals can handle these vessels fully loaded unlike any other port on the East Coast

  22. Environmental Programs • On-terminal storm-water retention & treatment • Electric powered ship to shore gantry cranes • LED lighting systems reduce energy consumption • Sound walls minimize noise pollution Ultra low emission locomotives to shunt intermodal rail cars throughout our on-dock rail yard • "GO" program:Voluntary diesel retrofit/ replacement truck and vessel hybridization and fuel switch program http://www.portofvirginia.com/corporate/environment/go-program.aspx

  23. Future Craney Island Marine Terminal Phase 1 – June 2025 Total Acreage: 220 Pier Length: 3000 ft.Depth: 52 ft.Cranes: 6Capacity: 1.5M TEUsCost: $1.2B

  24. Global Briefing

More Related