1 / 11

THANG LONG INDUSTRIAL PARK II To achieve Properity and Realize the Dreams

Home. Hung Yen - Vietnam. THANG LONG INDUSTRIAL PARK II To achieve Properity and Realize the Dreams. Industrial Park. Tenant List. About Us. For Tenant.

orrin
Télécharger la présentation

THANG LONG INDUSTRIAL PARK II To achieve Properity and Realize the Dreams

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Home Hung Yen - Vietnam THANG LONG INDUSTRIAL PARK II To achieve Properity and Realize the Dreams Industrial Park Tenant List About Us For Tenant Vietnam is the focus of so much attention as an investment destination of “China plus one”. Attractive features of Vietnam for Japanese manufacturer are a lot of young labor power with hard work and cleverness, stable political environment and good relationship with Japan. A lot of Japanese manufacturer value Northern Vietnam as the suitable place for “Manufacturing” and decided to invest here. Thang Long Industrial Park II(TLIPII) is located in Hung Yen Province, Northern Vietnam. TLIPII was established in November 2006 based on experiences of Thang Long Industrial Park(TLIP) in Hanoi that we developed. Over 70 manufacturing companies are operating in TLIP.

  2. The shape of Vietnam running north-south is similar to the one of Japan. There is a capital city Hanoi with 1,000 years history in Northern Vietnam. Even Northern Vietnam belongs to subtropical zone, there is a season and temperature sometimes is under 10 decrees in winter. The country view expanding Northern Vietnam is the hometown view which induces nostalgia in Japanese people. The climate in Northern Vietnam is more inclement than that in South Vietnam. People was making village for rice cultivation and helped each other. Current people in Northern Vietnam who took over such a culture is said to be suitable for works which require TEAM WORK. Home Hung Yen - Vietnam THANG LONG INDUSTRIAL PARK II To achieve Properity and Realize the Dreams Industrial Park Tenant List About Us For Tenant

  3. Brief Summary of Vietnam Area: 330,000km2Capital: Hanoi (Population : 6,200,000)Export goods: Crude oil, Fabric, Needlework and Aquatic productImport goods: Machinery, Petroleum products, and Iron and steelLiteracy rate : 93% (A lot of people who can speak English or Japanese) Rich Human Resources with good eye-sight and a right hand Stables Ethnic Stability (90% Kinh race) Stable Politic System of President, Secretary, Prime Minister Dialogue with Foreign Direct Investment Labor with high quality and competeness World 12th population (3rd in ASEAN) National average age, 28 years old

  4. Brief Summary of Hung Yen province Area: 330,000km2Population : 1,100,000Hung Yen Province, although it is next to a capital, was late in development and had not received Foreign Direct Investment so much like neighboring provinces. The fact is that Hung Yen province has historical relationship with Japanese through the ages and we can expect this province surely is developing. Distance from TLIPII Thang Long Industrial Park II(TLIPII) is located in Hung Yen province with 33km far from Hanoi and approximately 45 minutes drive. You can hire capable staff and engineer who live in Hanoi because of easy access. Moreover, TLIPII is located along National road No.5 as an industrial road with only 82km far from Hai Phong port which is very convenient for export and import. And you can easily and quickly access to new national road no.1 which connect to People’s Republic of China and Thailand: To border with China: 200kmTo Guangzhou: 1,200kmTo Ho Chi Minh City: 1,600kmTo Bangkok : 1,400km To Center of Hanoi: 33kmTo Noi Bai International Airport : 53kmTo Hai Phong Port: 82kmTo Cai Lan Port: 143kmTo Thang Long Industrial Park : 46km

  5. Future advance supporting infrastructures Construction work of express way (New national road No.5) which will connect with Hanoi and Hai Phong was started in 2009 and is now under construction. New national road No.5 New Hai phong Port Total Investment: US$ 15.4bilInvestor: VIDIFI (Vietnam Infrastructure Development and Finance Investment Joint Stock Company) High standard HighwayLength: 105kmWidth: 100mLimitation : 120km/hourSchedule start in May 2009 Lach Huyen PortExpected to Start Operation in 2013 Draft 14m Deep Sea Port 70K Ton(6,000~7,000TEU) Class Total 11 Berths, (4 berths to be supported by Japanese ODA)Commenced Study on June 2010

  6. Mordern & Advance Infrastructures Home Hung Yen - Vietnam Flood Countermeasures THANG LONG INDUSTRIAL PARK II To achieve Properity and Realize the Dreams Industrial Park Flood countermeasure is very important in Northern Vietnam. We fill up by sand at 1.5m height and 2.3 m height dyke surrounding TLIPII based on 100 year probability calculation (Even if big rainfall such as biggest rain during 100 years happen, we can prevent from flood. The well designed drainage channel and big capacity pumping station also ensure the quickly water discharge Tenant List About Us For Tenant Dyke surrounding TLIPII Drainage Channel Drainage Pump Station

  7. Industrial Water Supply System • We have own Water Treatment Plant: • Designed capacity: 18,000 m2/day&nightInitital capacity: 4,500 m2/day&night (completed on Dec.’2009) 1st upgraded capacity: 13,500 m2/day&night (completed on Dec.’2011) • Underground Distribution Pipe System with connection points avaiable to each land plot Initial Water Treatment Plant Upgrade Water Treatment Plant Sewage Treatment • We have own Sewage Treatment Plant: • Designed capacity: 15,000 m2/day&nightInitital capacity: 3,000 m2/day&night (completed on Dec.’2009) • Underground Collection Pipe System with connection points avaiable to each land plot

  8. SewageTreatment Plant Power Supply System • We have own Sub-Station 110kV/22kV connected directly to the National High Voltage Grid • Designed capacity: 176 MVAInitital capacity: 50 MVA (completed on December 2009) • 1st upgraded capacity: 176 MVA (to be completed on Nov.’2012) • Underground 22kV Distribution Cable System with connection points avaiable to each land plot to reduce risk which may occur power cut

  9. 110kV/22kV Sub-Station Road Systems Most wide road systems to ensure the convenient and safe transportation

  10. Ready Facilities for Prompt Operation Most wide road systems to ensure the convenient and safe transportation

More Related