1 / 15

The Seven Forms of Waste

The Seven Forms of Waste. Continuous Improvement focuses on the identification and elimination of the 7 forms of waste: Overproduction Inventory Unnecessary Motion Transportation Waiting Over Processing Defects / Repair / Rework. 1. Over Production.

osman
Télécharger la présentation

The Seven Forms of Waste

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Seven Forms of Waste Continuous Improvement focuses on the identification and elimination of the 7 forms of waste: • Overproduction • Inventory • Unnecessary Motion • Transportation • Waiting • Over Processing • Defects / Repair / Rework

  2. 1. Over Production • Producing products or materials before they are needed. • Overproduction is the worst form of waste because it is the root cause of many other wastes. • Results of Over Production: • Products being produced in excess quantities • Products being made before customers need them • Excess Inventory • Excess Transportation • Hides available capacity • Caused by: • Working ahead of customer (internal/external) or process requirements

  3. Waste Of Overproduction : Example OPERATOR SHOULD BE IN THIS STATION (ST 16) BUT IS WORKING AHEAD IN ST 15

  4. 2. Inventory • Excess inventory is not directly required for current customer orders. • Results of Excess Inventory: • requires space • costs money and ties up capital • search and transport damage • hides defects • excess WIP and finished out-of-date product • Increased deterioration • Caused by: • Working ahead of build requirements • High WIP standards • No WIP standards • Lack of JIT/Pull system

  5. Excess Inventory: Example STANDARD SET AT 4 HIGH X 3 DEEP PART BIN STACKED 6 HIGH

  6. 3. Motion • Unnecessary movement in a process. • Some Results of Motion: • unnecessary walking • poor ergonomic conditions • part transfer • reaching and stopping and walking to locate/ pick up parts/tools • Caused by: • poor parts placement • poor process flow • poor work station layout

  7. Waste of Motion: Example TEAM MEMBER IN PAINT SHOP ATTEMPTING TO UNTANGLE HOSES TO THE BACK-UP GUNS IN THE TOP COAT BOOTH.

  8. 4. Transportation • The unnecessary movement of materials • Results of Transportation: • Loss of traceability • Damaged goods • Increased Lead Time • Excess Costs • Storage space • Caused by: • Poor parts storage • Poor Work area layouts • Working ahead of build requirements • Lack of JIT/ Pull system

  9. Waste of Transportation: Example BODY SHOP CONVEYANCE DELIVERS AMS BRACKETS TO TABLE ON THE FLOOR BODY SHOP T/M CARRIES PARTS TO RACK LINESIDE.

  10. 5. Waiting • Periods of inactivity in a downstream process that occur because an upstream activity does not deliver on time. • Results of Waiting: • Over Production • Over Processing • Idle resources • Non-Value added work • Caused by: • Line stops • Waiting for Material • Repair/Maintenance • Waiting for equipment to process • Missing tools • Non- “Full” work process

  11. Waste of Waiting: Example TEAM MEMBER WAITING ON BODY IN ST. 3900. ROBOTS IN ST. 2400 WENT DOWN CAUSING DOWNTIME

  12. 6. Over Processing • Producing more or better than the customer requires. • Results of Over Processing: • Increased Processing Time • Costs • Incorrect process/equipment • Caused by: • Refining the product in ways or areas not • important to the customer • Wait Time • Unclear Quality Standards

  13. Waste of Over Processing: Example BODY SHOP T/M SANDING DOOR THAT HAD NO DEFECTS

  14. 7. Defects/Repair/Rework • Products or aspects of the production processes that do not conform to specifications or to the customer’s expectations. • Results of Defects/Repair/Rework: • Customer Dissatisfaction • Non-Value added work • Extra costs • Extra space • Extra inspections/checks • Caused by: • Scrapped parts • Wrong or defective tools or machines • Wrong or missing processes • Poor Problem Solving • Unclear Standards

  15. Waste of Repair: Example PAINT SHOP T/M MAKING REPAIR IN SPOT REPAIR BOOTH.