1 / 4

Fast Roaming Study Group Closing Report March 2004

Fast Roaming Study Group Closing Report March 2004. Addressed comments on PAR and 5 Criteria from 802.21 (motions on Wednesday) Reaffirmed vote to accept PAR (03/771-r5) and 5 Criteria (03/772-r4) and to forward PAR and 5 Criteria to WG to forward to EXCOM (motion today)

Télécharger la présentation

Fast Roaming Study Group Closing Report March 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fast Roaming Study Group Closing Report March 2004 • Addressed comments on PAR and 5 Criteria from 802.21 (motions on Wednesday) • Reaffirmed vote to accept PAR (03/771-r5) and 5 Criteria (03/772-r4) and to forward PAR and 5 Criteria to WG to forward to EXCOM (motion today) • Voted to extend Study Group through meeting in January 2005 (motion today) Clint Chaplin, FR SG Chair

  2. Presentations • Roaming Requirements (04-286) • Roaming Interval Measurements(04-378) • Analysis of Roaming Techniques (04-377) Clint Chaplin, FR SG Chair

  3. Fast Inter-AP Transition = FIAT • Minutes: 04-287 Clint Chaplin, FR SG Chair

  4. Goals for May (SG or TG) • Focus on the following areas: Develop process to follow in Task Group Key Requirements for Fast BSS-Transition Current BSS-Transition architecture and Process Survey of liaison group candidates Use cases/applications of Fast BSS-Transition Clint Chaplin, FR SG Chair

More Related