Title: Full Fastener Install at Tack Location in Cell 260

Title: Full Fastener Install at Tack Location in Cell 260. Responsible: D. Camacho Approved By: T Bittner. G. G. GTG:. Is / Was. Description: Fully install fasteners at Tack locations in Cell 260 to help with the pull-up .

ownah
Télécharger la présentation

Title: Full Fastener Install at Tack Location in Cell 260

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Title: Full Fastener Install at Tack Location in Cell 260 Responsible: D. Camacho Approved By: T Bittner G G GTG: Is / Was Description: Fully install fasteners at Tack locations in Cell 260 to help with the pull-up. Closure Criteria: Planning in place to fully install all Tack locations on Cell 260. Applicability: -9 -10 -8 Line no. Target : 108 Status: Ongoing Reasons: Perform. Cost Maint. Produce. Rate Supplier / Partner Focal: D. Camacho/ J. Bigley Originating Organization: ME  Anticipated Benefits: Customer:________Program__ Weight reduction:______N/A__ Labor hrs reduction:___ (TBD) _ Cr path reduction:_____ (TBD) __ ENOVIA Actions resubmitted with new SOW and new tools ME and Production Approved tool for design. Questions from Mesa tool designers answered

More Related