ECE 4006B Fall, 2002 Group 2, Nilay Patel Progress Report Period (11/7-11/13, 2002)

Progress: Thank you Group 3 & 5 Assembled Rx and Tx Tested Rx and Tx Began Layout Revision Received all components. Planned Work: Finish alignment tolerance testing Debug Tx and modify 2 nd layout Order 2 nd PCB Order Common Cathode VCSELs.

palila
Télécharger la présentation

ECE 4006B Fall, 2002 Group 2, Nilay Patel Progress Report Period (11/7-11/13, 2002)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress: Thank you Group 3 & 5 Assembled Rx and Tx Tested Rx and Tx Began Layout Revision Received all components Planned Work: Finish alignment tolerance testing Debug Tx and modify 2nd layout Order 2nd PCB Order Common Cathode VCSELs ECE 4006B Fall, 2002 Group 2, Nilay PatelProgress Report Period (11/7-11/13, 2002)

  2. ECE 4006B Fall, 2002 Group 2, Nilay PatelProgress Report Period (11/7-11/13, 2002) Unconnectorized Tx Connectorized Tx Connectorized Rx Unconnectorized Rx

  3. ECE 4006B Fall, 2002 Group 2, Nilay PatelProgress Report Period (11/7-11/13, 2002)

  4. 2nd layout Remove jumper configuration Fix cross trace Make path to VCSEL shorter Spacing between pins Correct pad size Connectorized Tx Unconnectorized Tx ECE 4006B Fall, 2002 Group 2, Nilay PatelProgress Report Period (11/7-11/13, 2002)

  5. ECE 4006B Fall, 2002 Group 2, Nilay PatelProgress Report Period (11/7-11/13, 2002)