An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Old and New Spacer Pop Tests Calibration of 0-40mbar & 0-200mbar Pressure sensors. Water column & Digital pressure gauge calibration. Test to destruction of Old and New Kodel gaps. Leak and “Popped Spacer Test”. Conclusion.

  2. Calibration of sensors & ADC against WC 24 bit ADC Pico Recorder Sensor Technics CTEM 7000 and9000

  3. Method and plots of destructive Tests Initial failure , the first spacer Pressure [mbar] An example RE4/2 TW01 100 50 Remaining spacer failures 0 1000 2000 Time [s]

  4. Individual spacer ID 5 ramps and failures. Evidence of a series of 5 RE3/2 TW18 Propagation of bands of 5 spacers across gap width

  5. Results Operating pressures are 2-3 mbar . QA tests are done @ 20mbar, which will not prejudice the integrity of the bond mbar Numerous spacers already broken

  6. “Spacer test” and leak test done using ADC “Standard finger thrust” gives approx 0.1-0.2mbar. Equivalent to 1-2mm WC Spacers can be counted to check for errors in procedure Slope gives leak rate Unglued or popped spacers will give higher values

  7. Conclusions Two of the 3 agreed “new” gaps were sacrificed in addition to “old” gaps stored in the ISR, to establish pressure to failure. The bonding of spacers in the “new” production from KODEL appear sufficient for our needs and similar to previous production. The use of an online log of pressure provides a reliable and simple popped spacer test combined with a leak test. The reason for two “new” gaps having popped spacers at less than 20 mbar has not been clarified. Thanks to Abeeraand Luigi