1 / 5

INFORMATION TECHNOLOGY Device Refresh 2020

INFORMATION TECHNOLOGY Device Refresh 2020. Todd Watkins Director of Career and Information Technology. Oct 3, 2019. Phase 1 (September, 2019-October, 2019) Discussions and surveys with stakeholders to guide device type and curriculum.

paul2
Télécharger la présentation

INFORMATION TECHNOLOGY Device Refresh 2020

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INFORMATION TECHNOLOGY Device Refresh 2020 Todd Watkins Director of Career and Information Technology Oct 3, 2019

  2. Phase 1 (September, 2019-October, 2019) • Discussions and surveys with stakeholders to guide device type and curriculum. • Analyze data to create a shared vision of teaching and learning • Phase 2 (November, 2019-January, 2020) • Selection committee will begin evaluating devices based on a matrix that examines compatibility, instructional needs, cost, functionality, and required computer minimum specifications.  The selection committee will be comprised of the district technology coaches, IT staff, curriculum department, media specialists, teachers, and principals. Also, times will be allotted for district staff to have hands-on usage and feedback. • Reallocation of current Lenovo Thinkpad devices in grades 9-12 to support programs requiring additional or classroom computers, such as PLTW, Cyber Security, Graphic Design, Engineering, etc. Device Refresh Timeline

  3. Phase 3 (January, 2020-August, 2020) • Coordinated communication plan for transitions across the district • Provide Just-in Time Training (JIT) along with planned sessions for development to staff. JIT consists of various methods that are housed in a central repository and easily accessible to staff for “on-demand” help and tutorials. This allows teachers to have access to a centralized location for essential help on various software and Google GSuite. This will be combined with face-to-face conducted at schools, central locations, or online. • Delivery and deployment of devices to schools Device Refresh Timeline (Continued)

  4. Phase1 Phase 2 Phase 3 Sep 2019 - Oct 2019 • Digital Discussions • Surveys • Map Curriculum • Analyze Data Oct 2019- Jan 2020 • Demo Devices • Committee Selections • Finance Dept • Board Approval • Order new devices • Reallocation Plan Jan 2020 - Aug 2020 • Messaging and Roll-out • Training resources • PD Plan • Delivery • Deployment 3

More Related