1 / 28

Jean-Luc BIARROTTE CNRS-IN2P3 / IPN Orsay, France EURATOM FP7 MAX project coordinator

Overview of the MYRRHA accelerator & presentation of the MAX project. Jean-Luc BIARROTTE CNRS-IN2P3 / IPN Orsay, France EURATOM FP7 MAX project coordinator. Background The MYRRHA accelerator concept Review of the MYRRHA linac design. The MYRRHA project. MYRRHA Project

pelham
Télécharger la présentation

Jean-Luc BIARROTTE CNRS-IN2P3 / IPN Orsay, France EURATOM FP7 MAX project coordinator

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overviewof the MYRRHA accelerator& presentation of the MAX project Jean-Luc BIARROTTE CNRS-IN2P3 / IPN Orsay, FranceEURATOM FP7 MAX projectcoordinator J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  2. Background • The MYRRHA accelerator concept • Review of the MYRRHA linac design J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  3. The MYRRHA project MYRRHA Project Multi-purpose hYbrid Research Reactor for High-tech Applications At Mol (Belgium) Development, construction & commissioning of a new large fast neutron research infrastructure to be operational in 2023  ADS demonstrator  Fast neutron irradiation facility  Pilot plant for LFR technology See Introduction talk by H. Aït Abderrahim (SCK•CEN) J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  4. The MYRRHA accelerator: background • End 90’s: several collaborative R&D activities worldwide on ADS accelerators (APT/AAA, TRASCO, etc. w/ especially a CEA/CNRS/INFN collaboration) • 2001: “The European roadmap for developing ADS for Nuclear Waste Incineration”, European Technical Working Group on ADS (chaired by C. Rubbia, ENEA) • 2002: pre-design “Myrrha Draft 1” (cyclotron 350 MeV) • 2002-2004: MYRRHA is studied as one of the 3 reactor designs within the PDS-XADS FP5 project(coord. Framatome/AREVA)(cyclotron turns into linac, first reliability analyses show a need for fault-tolerance capability) J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  5. The MYRRHA accelerator: background • 2005: updated pre-design “Myrrha Draft 2” (linac 350 MeV) • 2005-2010: MYRRHA is studied as the XT-ADS demo within the EUROTRANS FP6 project(coord. FZK)(600 MeVlinac conceptual design, R&D activities w/ focus on reliability) • 2010:MYRRHA is on the ESFRI list, and officially supported by the Belgium government at a 40% level (384M€, w/ 60M€ already engaged) • 2010-2014: MYRRHA accelerator advanced design phase w/ support from the EURATOM FP7 projects (MAX especially) • 2015-2019: possible construction phase • 2020-2023: possible commissioning phase & progressive start-up J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  6. CDT Reactor design SCK●CEN FREYA GUINEVERE experiment SCK●CEN MAX Accelerator design CNRS MYRRHA within EURATOM FP7: 2010-2014 See Conclusion talk by R. Garbil (EC) J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  7. The MAX project • MAX = “Myrrha Accelerator eXperiment, research & development programme” • 3 years & coordinated by CNRS • 2011 – 2012 – 2013 (February 2011 to January 2014) • Goal of the project = support the transition from the EUROTRANS “conceptual design phase” to the MYRRHA pre-construction “engineering design phase” • Pursue the R&D related to ADS-type accelerators, that request a “beyond the state-of-the-art” reliability level • Follow up of FP5 PDS-XADS & FP6 EUROTRANS activities • Fine-tune the design of the driver accelerator for the MYRRHA system • To initiate a possible MYRRHA detailed engineering design & subsequent construction phase starting at the end of the MAX project • Key data • Call identifier: FP7-FISSION-2010 • Collaborative Project – Small/medium-scale Focused (CP-FP) • Project cost: 4.9 M€ total cost – 2.9 M€ EU contribution • With a total involvement of about 300 p.m. (8 persons FTE) from 11 partners J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  8. The MAX project WP1: Global accelerator design WP2: Injectordevelopments WP3: Main linacdevelopments WP4: System optimisation http://ipnweb.in2p3.fr/MAX/ J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  9. Background • The MYRRHA accelerator concept • Review of the MYRRHA linac design J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  10. MYRRHA as an ADS demonstrator • Demonstrate the physics and technology of an Accelerator Driven System (ADS) for transmuting long-lived radioactive waste • Demonstrate the ADS concept (coupling accelerator + spallation source + power reactor) • Demonstrate the transmutation(experimentalassemblies) Main features of the ADS demo 50-100 MWth power Highly-enriched MOX fuel Pb-Bi Eutectic coolant & target keff around 0.95 in subcritical mode 600 MeV, 2.5 - 4 mA proton beam J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  11. Choice of the proton beamenergy: 600 MeV Power densitydeposited in LBE   Accelerator cost  J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  12. Choice of the proton beamcurrent: 4mA Current / Energy / Sub-Criticityfor a 80 MWtherm ADS demo (simulation by ANSALDO) J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  13. MYRRHA proton beamrequirements High power proton beam (up to 2.4 MW) Extremereliabilitylevel J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  14. The ADS reliabilityrequirement • Beam trips longer than 3 sec must be very rare: • To limitthermal stress & fatigue on the target window, reactor structures & fuel assemblies • To ensure a 80% availability– given the foreseen reactor start-up procedures • Present MYRRHA spécifications: <10 beam trips per 3-monthoperationperiod(i.e. MTBF > 250h) – derived from the PHENIX reactor operation analysis • Far above present HPPA accelerator performance – MTBF is a few hours at PSI or SNS • Far abovepresent ADS specifications in US or Japan– mainly based on simulations D. Vandeplassche, IPAC2012 J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  15. The ADS reliabilityrequirement • Beam trips longer than 3 sec must be very rare: • To limitthermal stress & fatigue on the target window, reactor structures & fuel assemblies • To ensure a 80% availability– given the foreseen reactor start-up procedures • Present MYRRHA spécifications: <10 beam trips per 3-monthoperationperiod(i.e. MTBF > 250h) – derived from the PHENIX reactor operation analysis • Far above present HPPA accelerator performance – MTBF is a few hours at PSI or SNS • Far abovepresent ADS specifications in US or Japan– based on simulations • In any case, reliability guidelines are needed for the ADS accelerator design: • Strong design i.e. robust optics, simplicity, low thermal stress, operation margins… • Redundancy (serial where possible, or parallel) to be able to tolerate failures • Repairability(on-line where possible) and efficient maintenance schemes J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  16. Genericscheme of the European ADS accelerator • Modular SC main linac • Upgradeable concept (demo, transmuter) • Independently-controlled elements • The function of a missing element can be replaced by retuning adjacent elements (“FAULT-TOLERANCE”) • Redundant injector • Fault-tolerance is non applicable (β<0.15) • Minimized number of elements • Spare stand-by injector with fast switching capabilities J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  17.  Initial configuration  The failure is localized in injector Operational injector 1: RF + PS + beam ON The switching magnet polarity is changed (~1s) - + Warm stand-by injector 2: RF+ PS ON, beam OFF (on FC)  A failure is detected anywhere  Beam is resumed Failed injector 1, to be repaired on-line if possible Beam is stopped in injector 1 by the Machine Protection System @t0 - + Injector 2 operational (@t1 < t0 +3sec) Strategy for a fault case in the injector Need for an efficient fault diagnostic system ! J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  18. Fastfault-recoveryprocedure  A failure is detected anywhere → Beam is stopped by the MPS in injector at t0  The fault is localized in a SC cavity RF loop → Need for an efficient fault diagnostic system  New V/φ set-points are updated in cavities adjacent to the failed one → Set-points determined via virtual accelerator application and/or at the commissioning phase  The failedcavityisdetuned (to avoid the beamloadingeffect) → Using the Cold Tuning System  Once steady state is reached, beam is resumed at t1 < t0 + 3sec → Failed RF cavity system to be repaired on-line if possible J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  19. Background • The MYRRHA accelerator concept • Review of the MYRRHA linac design J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  20. Layout of the MYRRHA linac J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  21. Layout of the MYRRHA linac J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  22. WP1 – Global accelerator design H. Klein (IAP): MYRRHA injector design (Monday 11:00) J-L. Biarrotte (CNRS): SC linac design & associated MEBT (Monday 11:35) L. Perrot (CNRS): High-energybeamlines(Monday 12:10) from the CDT work F. Bouly (CNRS): Beamtolerance to RF faults(Monday 14:30) D. Uriot (CEA): Instrumentation & operation aspects (Monday 15:00) J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  23. WP2 – Injectordevelopments C. Zhang (IAP): Injectorlayout & beamdynamics(Monday 15:50) H. Podlech (IAP): Cavitydevelopment for MYRRHA (Monday 16:25) D. Vandeplassche (SCK•CEN): MYRRHA injectorat UCL (Monday 17:00) → towards a MYRRHA R&D platform J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  24. WP3 – Main linacdevelopments H. Saugnac (CNRS): Spokecryomodule design (Tuesday 08:30) R. Paparella (INFN): SC ellipticalcavities design & associated R&D (Tuesday 09:05) F. Bouly (CNRS): Fault-recoveryprocedures & associated R&D (Tuesday 09:40) J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  25. WP4 – System optimisation N. Chevalier (ACS): Cryogenic system for the MYRRHA linac(Tuesday 10:30) D. Vandeplassche (SCK•CEN): RF and control aspects (Tuesday 11:05) A. Pitigoï (EA): Reliabilityanalysis(Tuesday 11:35) L. Medeiros (SCK•CEN): Conclusion (Tuesday 13:50) → Roadmaptowards MYRRHA accelerator construction J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  26. Charge to the review: Q/A • Q: Whatis the goal of the MAX Euratom FP7 project (Feb 11 – Jan 14)? • Deliver a consolidated reference layout of the MYRRHA linacin 2014 so as to initiate its engineering design and subsequent construction phase • Q: Whatis the goal of this MYRRHA linacreview ? • Review, at MAX mid-project, the design choices and the technical progress made so far and give recommendations for the forthcoming activities • Q: What documentation does the review team need to consider ? • Becausewe have no fully consistent TDR-like document yet, the reviewis to be made on the basis of the slidesshownat the meeting. Nevertheless, possiblyusefuladditional documentation has also been made available. • EUROTRANS final report on XT-ADS accelerator design (March 2010) • Alreadyissued MAX deliverables: Project presentation (March 2011), Detailedwork programme (April 2011), Cryogenicanalysis (Jan 2012), Injectorconceptual design (Fev 2012) • CDT deliverables on: Myrrha HEBT design (Feb 2012) and instrumentation needs (March 2012) J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  27. Charge to the review: Q/A • Q: On whichspecific points should the review team focus in particular ? • Besides a critical analysis (Findings/Comments/Recommendations) of the various technical contributions, we would like the review team to answer specifically to the following questions: • May the adopted general philosophy and methodology lead to the design of a highly reliable accelerator? • Are the different design choices appropriate for such a machine? • Is the R&D programme coherent, adequately focused and efficient at this stage of the project? • In a more global view, what should be the essential points of concern for the MYRRHA project team in the two following years (2013-2014) to prepare for the accelerator construction? J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

  28. Thank You for yourkindinvolvement! • http://ipnweb.in2p3.fr/MAX/ • http://myrrha.sckcen.be/ J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

More Related