An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Responsibilities & Planning DCS WS 13.06.05 L.Jirdén

  2. Responsibilities • ACC (and its CERN partners) will provide • DCS H/W Infrastructure • Back-End System • Common Services • Interface to TRG, DAQ, HLT, LHC via ECS • S/W Infrastructure for Detector Applications • Detectors will provide • Detector Sub-System Devices and Cabling • Detector Specific Networking (Ethernet switches) • Detector Applications for each Sub-System • Detector Specific Services • Integration of all Detector Sub-Systems to a full Detector Control System • Interface to the Alice Detector Control System layer

  3. ACC will provide:DCS H/W infrastructure • DCS Racks in CR3 • 1 for Back-end PC’s • 1 for ELMB power • 6 for Front-end (detector) PC’s • Network • DCS network ports in all racks with DCS computers & devices • detectors to specify requirements: “rack content meetings” • Computers • Back-end: prototype installation exists • Front-end: detectors to specify requirements: ACC will propose • PCI interfaces: detectors to specify requirements: ACC will propose • Peripherals • Printers, displays, etc

  4. DCS H/W infrastructure CERN Consoles Remote Access Backend Servers Domain Controller Firewall System Management Domain Controller DCS Operator IP Reach for KVM DB Server (Config.) DB Server (Archive) Terminal Server DCS Status DB Server (Archive) Terminal Server File Server Safety Status Information Server ACR Consoles DCS network Worker Nodes Network and Security Gas & Cooling Alarms LHC & Access FSM General services General DCS Environment Electricity & Racks Alignment Detector Front-end PC’s Infrastructure, network Spares Racks, network, cabling KVM switchescontrolled power plugs Hot swap spare serversDisks & memories

  5. TPC(1) 108? WXP/Linux PVSS II Detectors to specify requirements: ACC will propose FW OPCserver LIBRARIES PCI ? ? 216 2 18? 3 1 22 1..22 108 288 1..3 1..18 ? ~400? ? 1 1 1? 26/11/04 [FSM?] Database(s) ACC WILL PROVIDE: SOFTWARE INFRASTRUCTURE FOR F-END’s PVSS II PVSS II PVSS II Control room (ACR) OPCclient DIMclient User interface Ethernet PVSS II PVSS II PVSS II PVSS II PVSS II OPC client OPC client OPC client OPC client PVSS II ISEG OPCserver Wiener OPCserver ELMB OPCserver ELMB OPCserver DIMclient PCI-CAN PCI-CAN PCI-CAN PCI-CAN RS232 C C C C E S Front-End [FED] DIMsrv DIMcl ISEG Heinzinger Eth. Switch E OPC client Wiener Eth. Switch E HV LV ELMB HV ELMB LV monitor DDL Chambers Chambers Chambers,detector RCU HVrod HVrod DIMsrv High Voltage Low Voltage Temp. Monitor FEE Very High Voltage VHV Curr. Monitor

  6. TPC(1) 108? 216 ? ? 3 2 22 18? 1 1? 288 1..22 ? 1 ~400? 1..3 1 ? 1..18 108 26/11/04 [FSM?] Database(s) DETECTORS will provide*SUB-SYSTEM DEVICES; HVPS, LVPS, etc* ELMB’s and ELMB + CAN power by ACC * CABLES; CAN and Interlock cables by ACC*SPECIFIC NETWORKING; switch to RCU, etc. *DETECTOR SPECIFIC SERVICES (GAS, COOLING) PVSS II PVSS II PVSS II Control room (ACR) OPCclient DIMclient User interface Ethernet PVSS II PVSS II PVSS II PVSS II PVSS II OPC client OPC client OPC client OPC client PVSS II ISEG OPCserver Wiener OPCserver ELMB OPCserver ELMB OPCserver DIMclient PCI-CAN PCI-CAN PCI-CAN PCI-CAN RS232 C C C C E S [FED] DIMsrv DIMcl ISEG Heinzinger Eth. Switch E Wiener Eth. Switch E HV LV ELMB HV ELMB LV monitor DDL Chambers Chambers Chambers,detector RCU HVrod HVrod DIMsrv High Voltage Low Voltage Temp. Monitor FEE Very High Voltage VHV Curr. Monitor

  7. DETECTORS DETECTOR APPLICATIONS ACC • ALICE STANDARDS: • - ALICE DCS State Diagrams (HV, LV, FEE, Detector DCS, ALICE DCS) • Guidelines & Conventions for ALICE PVSSII Control Software • ALICE DCS Computing Rules JCOP FRAMEWORK PVSS TOOLS ALARM ARCHIVAL FW CORE CONFIGURAT ARCHIVAL CONDITION DEVICE COMPONENTS ACCESS PVSS CONFIG FEE CONFIG APPLICATIONS TRENDING CONNECTION: OPC, DIM, DIP PVSS applications

  8. ACC will provide* integration of services* interface to ECS ECS DCS Detectors will provide* Integration of subsystems* Interface to DCS … … gas power Control Units … racks det D det E det B … sub-sys 1 sub-sys 2 sub-sys 1 sub-sys 2 Device Units … … device a device b device e To physical devices

  9. Jan 06 Aug 06 Mar 2007 April 2007 Nov 05 PHASE 1 PHASE 2 PHASE 3 PHASE 4 INFRASTRUCTURE TPC HMPID Pre-Installation HMPID TOF / TRD PHOS TPC/ITS VacuumFMD/V0/T0 RB26 FMD/V0/T0 RB24 PMD Stage2VacuumL3 doorsShielding Final Installation Muon spectrometer Installation schedule

  10. HV LV PC and PLC H/W RACKS TMON NETWORK FEE VHV DSS RODC LASER B-END PULSER GOOFIE GCS TPC DCS INTEGRATION ALICE DCS INTEGRATION ECS – DAQ INTEGRATION TPC pre-installation example 2005 2006 June Nov Dec June July July Aug Jan Apr Oct Feb Mar Sep May TPC CHAMBER MOUNT TPC FEE TPC COMMISSIONING

  11. Plans for 2005 SXL2 SX2 SG F-END TPC GAS DSS F-end comp TPC TPC GAS SYSTEM DSS JUL 05 SEP 05 OCT 05 F-END CR3 B-END F-end comp B-end comp HMPID JUL 05 OCT 05 CR4 DSS DSS JUL 05 • TPC and HMPID Pre-installation at P2 NETWORK MAY 05

  12. Detector groups: DETECTOR APPLICATIONS SOFTWARE Central Team: INSTALLATION AND VALIDATION TEST GUIDE REQ PURCH B-END F-END:HMPIDTOFTRDPHOSMTGMTK F-END:TPCITSFMD/V0/T0PMD Final Installation Jan 05 Jan 06 Aug 06 Mar 2007 April 2007 PHASE 1 PHASE 2 PHASE 3 PHASE 4 HMPID TOF / TRD PHOS TPC/ITS VacuumFMD/V0/T0 RB26 FMD/V0/T0 RB24 PMD TOFTRD Stage2VacuumL3 doorsShield Muon spectrometer