0 likes | 1 Vues
Language: English<br>Format: PDF<br>Platform: Windows Phone, Ipad and Mac<br>Delivery: Instant Download After Payment.
E N D
This is the sample of the sample click on The download link for complete manual DOWNLOAD LINK For some reason if link does not work download this pdf and then click
Product: MULTI TERRAIN LOADER Model: 267 MULTI TERRAIN LOADER CMP Configuration: 267 277 Multi Terrain Loader CMP00001-UP (MACHINE) POWERED BY 3034 Engine Disassembly and Ass embly 2 67, 277 and 287 Multi Terrain Loaders Engine Su pplement Media Number -RENR481 4-01 Publication Date -01 / 12/ 200 3 Date Updated -04/ 12/ 200 3 i01984677 Air Cleaner - Remove and Install SMCS - 1051-010 Removal Procedure 267 Multi Terrain Loader Illustration 1 g00766191 1. Release clamps (3). Remove air cleaner cover (2) from air cleaner housing (1) . 2. Remove the primary air filter and the secondary air filter from inside air cleaner housing (1) .
Illustration 2 g01033182 3. Loosen clamps (4). Disconnect hose (5) . Illustration 3 g01033181 4. Remove bolts (6). Remove air cleaner housing (1) . 5. Remove service indicator (7) . Removal Procedure 277 Multi Terrain Loader
Illustration 4 g00766044 1. Release clamps (3). Remove air cleaner cover (2) from air cleaner housing (1) . 2. Remove the primary air filter and the secondary air filter from inside air cleaner housing (1) . Illustration 5 g00766054 3. Loosen clamps (4). Disconnect hose (5) .
Illustration 6 g00779924 4. Remove bolts (6). Remove air cleaner housing (1) . 5. Remove service indicator (7) . Removal Procedure 287 Multi Terrain Loader Illustration 7 g01028489 1. Release clamps (2). Remove air cleaner cover (3) from air cleaner housing (1) . 2. Remove the primary air filter and the secondary air filter from inside air cleaner housing (1) .
Illustration 8 g01028490 3. Loosen clamps (6) and disconnect hose (7) . 4. Remove nuts (4) and the spacers. 5. Remove service indicator (5) . 6. Remove air cleaner housing (1) . Installation Procedure 267 Multi Terrain Loader Table 1 Required Tools Tool Part Number Part Description Qty A 5P-3413 Pipe Sealant
Illustration 9 g01033181 1. Apply Tooling (A) to the threads of service indicator (7). Install service indicator (7) into air cleaner housing (1). Tighten the service indicator until the service indicator makes contact with the base of the fitting. Tighten the service indicator by another 1/4 turn. 2. Place air cleaner housing (1) into position. Install bolts (6). Tighten bolts (6) to a torque of 19 ± 2 N·m (14 ± 1 lb ft). Illustration 10 g01033182 3. Connect hose (5). Tighten clamps (4) to a torque of 4.5 ± 1 N·m (40 ± 9 lb in). Illustration 11 g00766191 4. Install the primary air filter and the secondary air filter into air cleaner housing (1) . 5. Install air cleaner cover (2) and secure clamps (3) .
Installation Procedure 277 Multi Terrain Loader Table 2 Required Tools Tool Part Number Part Description Qty A 5P-3413 Pipe Sealant Illustration 12 g00779924 1. Apply Tooling (A) to the threads of service indicator (7). Install service indicator (7) into air cleaner housing (1). Tighten the service indicator until the service indicator makes contact with the base of the fitting. Tighten the service indicator by another 1/4 turn. 2. Place air cleaner housing (1) into position. Install bolts (6). Tighten bolts (6) to a torque of 19 ± 2 N·m (14 ± 1 lb ft).
Illustration 13 g00766054 3. Connect hose (5). Tighten clamps (4) to a torque of 4.5 ± 1 N·m (40 ± 9 lb in). Illustration 14 g00766044 4. Install the primary air filter and the secondary air filter into air cleaner housing (1) . 5. Install air cleaner cover (2) and secure clamps (3) . Installation Procedure 287 Multi Terrain Loader Table 3 Required Tools Tool Part Number Part Description Qty A 5P-3413 Pipe Sealant
Illustration 15 g01028490 1. Apply Tooling (A) to the threads of service indicator (5). Install service indicator (5) into air cleaner housing (1). Tighten the service indicator until the service indicator makes contact with the base of the fitting. Tighten the service indicator by another 1/4 turn. 2. Place air cleaner housing (1) into position. Install the spacers and bolts (4). Tighten bolts (4) to a torque of 19 ± 2 N·m (14 ± 1 lb ft). 3. Connect hose (7). Tighten clamps (6) to a torque of 4.5 ± 1 N·m (40 ± 9 lb in). Illustration 16 g01028489 4. Install the primary air filter and the secondary air filter into air cleaner housing (1) . 5. Install air cleaner cover (3) and secure clamps (2) . Copyright 1993 - 2019 Caterpillar Inc. Fri Dec 13 10: 25: 29 UTC+ 0530 2019 All Rights Reserved. Private Network For SIS Licensees.
Product: MULTI TERRAIN LOADER Model: 267 MULTI TERRAIN LOADER CMP Configuration: 267 277 Multi Terrain Loader CMP00001-UP (MACHINE) POWERED BY 3034 Engine Disassembly and Ass embly 2 67, 277 and 287 Multi Terrain Loaders Engine Su pplement Media Number -RENR481 4-01 Publication Date -01 / 12/ 200 3 Date Updated -04/ 12/ 200 3 i01990559 Alternator - Remove and Install - Without Air Conditioning SMCS - 1405-010 Removal Procedure 1. Disconnect the battery. Refer to Disassembly and Assembly, "Battery and Battery Cable - Seperate and Connect". Illustration 1 g01033322 2. Remove screws (1) and bolts (3) . 3. Remove cover (2) .
Illustration 2 g01033323 4. Remove cable strap (5). Raise rubber boot (4). 5. Disconnect harness assembly (6) . Illustration 3 g01033324 6. Remove nut (9). Disconnect cable assembly (8) . 7. Loosen bolts (7) and (12) . 8. Slide alternator (10) toward the engine. 9. Remove V-belt (11) from alternator (10) . 10. Remove bolts (7) and (12) . 11. Remove alternator (10) . Installation Procedure
This is the sample of the sample click on The download link for complete manual DOWNLOAD LINK For some reason if link does not work download this pdf and then click
Illustration 4 g01033324 1. Place alternator (10) in position. 2. Install bolts (7) and (12). Do not tighten bolts (7) and (12) at this time. Note: When you install the alternator, ensure that the alternator pulley is in alignment with the crankshaft pulley within 2.4 mm (0.09 inch). 3. Install V-belt (11) onto alternator (10) . 4. Slide alternator (10) away from the engine in order to tighten V-belt (11) . Note: Refer to the Operation and Maintenance Manual, "Belts - Inspect/Adjust/Replace" for the correct procedure. 5. Tighten bolt (7) to a torque of 12 N·m (9 lb ft). 6. Tighten bolt (12) to a torque of 24 N·m (18 lb ft). 7. Connect cable assembly (8). Install nut (9) .
Illustration 5 g01033323 8. Connect harness assembly (6) . 9. Install rubber boot (4). Install cable strap (5) . Illustration 6 g01033322 10. Place cover (2) in position. 11. Install bolts (3). Tighten bolts (3) to a torque of 15 ± 3 N·m (11 ± 2 lb ft). 12. Install screws (1). Tighten screws (1) to a torque of 6 ± 1 N·m (53 ± 9 lb in). 13. Connect the battery cables. Refer to Disassembly and Assembly, "Battery and Battery Cable - Seperate and Connect". Copyright 1993 - 2019 Caterpillar Inc. Fri Dec 13 10: 22: 17 UTC+ 0530 2019 All Rights Reserved. Private Network For SIS Licensees.
Product: MULTI TERRAIN LOADER Model: 267 MULTI TERRAIN LOADER CMP Configuration: 267 277 Multi Terrain Loader CMP00001-UP (MACHINE) POWERED BY 3034 Engine Disassembly and Ass embly 2 67, 277 and 287 Multi Terrain Loaders Engine Su pplement Media Number -RENR481 4-01 Publication Date -01 / 12/ 200 3 Date Updated -04/ 12/ 200 3 i01988120 Battery and Battery Cable - Separate and Connect SMCS - 1401-029 Separation Procedure Illustration 1 g01029662 1. Raise the cover on the negative terminal of the battery. Disconnect negative terminal (2) of the battery. Place a protective cover on the negative terminal of the battery. 2. Raise the cover on the positive terminal of the battery. Disconnect positive terminal (1) of the battery. Place a protective cover on the positive terminal of the battery.
Illustration 2 g01029663 3. Remove bolts (3). Remove bracket (4) . 4. Remove battery (5) . Connection Procedure Illustration 3 g01029663 1. Install battery (5) . Note: Both battery terminals must be next to the engine. 2. Install bracket (4). Install bolts (3) .
Illustration 4 g01029662 3. Remove the protective cover from the positive terminal of the battery. Connect positive terminal (1). Lower the cover on the positive terminal of the battery. 4. Remove the protective cover from the negative terminal of the battery. Connect negative terminal (2). Lower the cover on the negative terminal of the battery. Copyright 1993 - 2019 Caterpillar Inc. Fri Dec 13 10: 22: 01 UTC+ 0530 2019 All Rights Reserved. Private Network For SIS Licensees.
Product: MULTI TERRAIN LOADER Model: 267 MULTI TERRAIN LOADER CMP Configuration: 267 277 Multi Terrain Loader CMP00001-UP (MACHINE) POWERED BY 3034 Engine Disassembly and Ass embly 2 67, 277 and 287 Multi Terrain Loaders Engine Su pplement Media Number -RENR481 4-01 Publication Date -01 / 12/ 200 3 Date Updated -04/ 12/ 200 3 i01715326 Cab - Tilt SMCS - 7301-084 Procedure to Tilt the Cab Start By: A. Release the hydraulic system pressure. Refer to Disassembly and Assembly, "Hydraulic System Pressure - Release". Do not go beneath cab unless cab is empty and support lever is engaged. Failure to follow the instructions or heed the warnings could result in injury or death. Note: Empty the water tank (if equipped) before you tilt the cab.
Illustration 1 g00601508 Illustration 2 g00597525 1. Remove nut (1) and large washer (2) from the inside of the cab. Illustration 3 g00597551
2. Remove bolt (3) . 3. Repeat Steps 1 and 2 on the opposite side of the cab. Illustration 4 g00597554 4. Raise cab (4) . Illustration 5 g00601451
Illustration 6 g00563598 5. Engage cab support lever (5) . Lower Procedure Illustration 7 g00601456
Illustration 8 g00563674 1. Tilt the cab upward. 2. Disengage cab support lever (5) . Illustration 9 g00601528 3. Lower cab (4) .
Illustration 10 g00597551 4. Install bolt (3) . Illustration 11 g00601508 Illustration 12 g00597525
Note: Ensure that the large washer is between the nut and the rubber mounting. 5. Install large washer (2) and nut (1) from the inside of the cab. Tighten the nuts to a torque of 125 ± 10 N·m (92 ± 7 lb ft). 6. Repeat Steps 4 and 5 on the opposite side of the cab. Copyright 1993 - 2019 Caterpillar Inc. Fri Dec 13 10: 26: 21 UTC+ 0530 2019 All Rights Reserved. Private Network For SIS Licensees.
Product: MULTI TERRAIN LOADER Model: 267 MULTI TERRAIN LOADER CMP Configuration: 267 277 Multi Terrain Loader CMP00001-UP (MACHINE) POWERED BY 3034 Engine Disassembly and Ass embly 2 67, 277 and 287 Multi Terrain Loaders Engine Su pplement Media Number -RENR481 4-01 Publication Date -01 / 12/ 200 3 Date Updated -04/ 12/ 200 3 i01990623 Electric Starting Motor - Remove and Install - 267 and 277 Multi Terrain Loaders SMCS - 1453-010 S/N - CMP1-UP S/N - CNC1-UP Removal procedure Accidental machine starting can cause injury or death to personnel working on the machine. To avoid accidental machine starting, turn the battery disconnect switch to the OFF position and remove the key. If the machine is not equipped with a battery disconnect switch, disconnect the battery cables from the battery and tape the battery clamps. Place a do not operate tag at the battery disconnect switch location to inform personnel that the machine is being worked on. 1. Disconnect the battery cables. Refer to Disassembly and Assembly, "Battery and Battery Cable - Seperate and Connect".
Illustration 1 g01033410 2. Remove nut (1) . 3. Slide boot (2) away from the positive terminal on electric starting motor (3) . Illustration 2 g01033411 4. Remove nut (4). Disconnect positive cable (5) from electric starting motor (3) . 5. Remove nut (9). Disconnect negative cable (10) from electric starting motor (3) . 6. Disconnect wire (8) . 7. Support electric starting motor (3) . 8. Remove nut (6) and clip (7) . 9. Remove electric starting motor (3) . Installation Procedure
Accidental machine starting can cause injury or death to personnel working on the machine. To avoid accidental machine starting, turn the battery disconnect switch to the OFF position and remove the key. If the machine is not equipped with a battery disconnect switch, disconnect the battery cables from the battery and tape the battery clamps. Place a do not operate tag at the battery disconnect switch location to inform personnel that the machine is being worked on. Illustration 3 g01033411 1. Place electric starting motor (3) in position. 2. Install clip (7) and nut (6). Tighten nut (6) to a torque of 50 ± 6 N·m (37 ± 4 lb ft). 3. Connect negative cable (10) to electric starting motor (3) and install nut (9). Tighten nut (9) to a torque of 50 ± 6 N·m (37 ± 4 lb ft). 4. Connect wire (8) . 5. Connect positive cable (5) to electric starting motor (3) and install nut (4) .
Illustration 4 g01033410 6. Slide boot (2) over the positive terminal of electric starting motor (3) . 7. Install nut (1). Tighten nut (1) to a torque of 50 ± 6 N·m (37 ± 4 lb ft). 8. Connect the battery cables. Refer to Disassembly and Assembly, "Battery and Battery Cable - Seperate and Connect". 9. Start the engine and check for proper operation of the electric starting motor. Copyright 1993 - 2019 Caterpillar Inc. Fri Dec 13 10: 22: 33 UTC+ 0530 2019 All Rights Reserved. Private Network For SIS Licensees.