1 / 6

BLIP Target Data and TPL Operations - Updates and Maintenance in May 2016

This update provides information on BLIP target data, production progress, and TPL operations in May 2016. It includes details on RbCl targets, Sr-82 blending, Ga and Ge-68 production, research plans, and maintenance activities.

petway
Télécharger la présentation

BLIP Target Data and TPL Operations - Updates and Maintenance in May 2016

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MIRP Operations –5-7/2016 • Safety • Tour at BLIP last Friday by General Klotz • Tour at BLIP May 23rd, Cherry Murray • Annual Review for Ac-225 July 27th and 28th • Production • 6th set of RbCl targets pulled out April 27th @ 1125 • Processing started May 5th • Received leftover Sr-82 from LANL for blending last week • 7th set of RbCl targets to run from April 27th – May 18th • Packaging Sr-82 this Friday • Proceeding with fabrication of new Ga targets for Ge-68 production Cathy Cutler 2016

  2. BLIP Target Data– 5/2016 • 7th Set of RbCl Targets (BWK and BWL) • Total Accumulated uA/hr as of 5/9/16 @ 23:59 –45,508.80 • Total Hours – 291.12 • Average Current – 156.33 uA/hr • SOB- 4/27/16 @ 1125.... EOB- 5/18/16 0900 Cathy Cutler 2016

  3. TPL Operations– 5/2016 • TPL Maintenance • Finishing work on ventilation – waiting on final calibration • Vendor to repair D-tank sensors • Lab 2-59 hood is back in service • BLIP Maintenance • Maintenance day May 17th • F&O preformed PM on BLIP chiller

  4. Research- 5-7/2016 • Research • Normal Thorium target late June to July timeframe. • Nick Simos Mo-graphite targets will be run behind the thorium targets and possibly 3 additional weeks at 160 MeV • Thorium foil run for research, 0.5 hr run, immediately before normal thorium run • Large Thorium target test run, cook and look highest current • Sc target run behind the thorium target in the C slot for duration of thorium run.

  5. Research- 5-7/2016 • Research • May 18th;cross section study of Se-72 and Ge-68 production of GaAs targets, stacked targets, a single irradiation at incident LINAC 117 MeV, energy on target will be tailored using beam degraders, for 2 hr 40 uA unrastered beam. • June 8th; GaAs target run as beam degrader for RbCl targets to assess Se-72 production at LINAC energy of 117 MeV energy on target will be tailored using beam degraders. • Mid-July; As target run as beam degrader for RbCl targets to assess Se-72 production at LINAC energy of 117 MeV energy on target will be tailored using beam degraders. • June-July; 2 Zinc foils, dedicated run at incident 117 MeV energy on target will be tailored to 108 and 45 MeV using beam degraders.

  6. Research- 5-7/2016 • Research • Mid June-July 31; W and Os targets, multiple irradiations (5-8) at incident LINAC 66 MeV, energy on target will be tailored using beam degraders, for 0.5-1 hr 40-TBD uA unrastered beam. • July; Large Zinc target, incident 140 MeV • Total projected (Mid-May thru July): • Foils: 2 • Bolted Aluminum: 11 • Parasitic w/RbCl/Thorium: 4

More Related