1 / 22

Dr. Silas M. Simiyu Managing Director & CEO Geothermal Development Company Ltd May 18, 2011

Development of Geothermal Resources in Kenya. Dr. Silas M. Simiyu Managing Director & CEO Geothermal Development Company Ltd May 18, 2011. GDC – steam resource development. ERC. IPPs. KenGen. Importss. REA. Ministry of Energy. KETRACO – Transmission /Wholesale Market operator.

polly
Télécharger la présentation

Dr. Silas M. Simiyu Managing Director & CEO Geothermal Development Company Ltd May 18, 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Development of Geothermal Resources in Kenya Dr. Silas M. Simiyu Managing Director & CEO Geothermal Development Company Ltd May 18, 2011

  2. GDC –steam resource development ERC IPPs KenGen Importss REA Ministry of Energy KETRACO –Transmission /Wholesale Market operator KPLC –Distribution/Supply Energy Tribunal Customers Power Sector Overview

  3. The Geothermal Development Company • Incorporated in 2008 to accelerate development of geothermal resources in Kenya by reducing upfront risks to investors

  4. Geothermal in Electricity Mix

  5. Projected Electricity Demand • Least Cost Power Development Plan (LCPDP) • Electricity demand of about 15,000 MW by 2030 is projected. • At least 5,000 MW of electricity will come from geothermal

  6. Mission & Vision Vision: To be a world leader in the development of geothermal resources Mission: To develop 5,000 MW by 2030 Core Activities • Resource prospecting • Drilling (all stages) • Field development • Reservoir and management • Contracting for power plant development

  7. Geothermal Power

  8. Direct Use • Greenhouse Heating • Heating of greenhouses for cut roses ~160 hectares • Extraction of CO2 & H2S • Injection of CO2 to aid in photosynthesis • Fumigation of soils and sterilization of liquid recycled plant fertilizers using H2S • Water Recovery • Potable water • Irrigation • Industrial Applications • Heating and drying • Industrial processes

  9. Why Geothermal?

  10. Abundant and indigenous • Suswa, • Longonot, • Olkaria, • Eburru, • Menengai, • Arus-Bogoria, • Lake Baringo, • Korosi, • Paka, • Lake Magadi, • Badlands, • Silali, • Emuruangogolak, • Namarunu • Barrier • Mwananyamala • Homa Hills

  11. 0 Low Cost Assessment criteria Location and transmission benefit Low cost US$c/kwh Generation Option Natural potential Environment friendly Comments Availability Fast delivery* • Geothermal • Significant proven potential • Significant potential, but dependent on weather • Wind 8.8 • Nuclear • Min plant size of 500 MW required, politically sensitive • Gas CNG • Need to import, liquify for transport and re-gas • Coal ? ? • Coal potential in Kitui • Attractive intermediate • capacity, but not large base load • MSD 10.2 • Hydro** • High exposure to hydrology • risk (60% of installed capacity) 12.5 • Gas • Kerosene • Current GTs running at high loads, need more base load 16.5 • Solar ? • Dependent on weather with low average availability 30-50 • Could pursue along side coal opportunity ? ? • Co-gene- • ration tbd * Based on construction time – additional time would be needed for feasibility and other pre-construction activities ** 6US cents/kwh based on importing hydro power from Ethiopia vs. 12 US cents/kwh based on remaining projects in Kenya, e.g. Mutonga *** Lower than 10 cents/kwh, greater than 80% availability, less than 3 years, lower than 0.20 CO2 kg/kwh and known natural potentia

  12. Other advantages of Geothermal • Green • Not affected by adverse weather • 95% Availability • Predictable cost of power over the plant life • Technology already successful in Kenya • Modular incremental development

  13. Development Strategies

  14. Single GoK Entity Approach 2003-2012 1956-59 1967-70 1971-76 1976 - 85 1986-2003 • Two Exploratory wells drilled to a depth of ~950m • Drilling continued in Olkaria II Steam field ~ 30 wells by 1992 • Drilling was accelerated and about 23 wells were drilled • GoK & UNDP entered into an agreement to extensively undertake geothermal resource assessment • Decision was to concentrate geothermal development at Olkaria (80km2) after positive well results. • Drilling ongoing • Olkaria IV 140MW planned for 2012 • Wells never discharged and later abandoned • 45 MW (Olkaria I) commissioned between 1981-1985 • From 1992, financiers pulled out and no major works undertaken until 1999 • Six wells were drilled with positive results. • Most financing was from World Bank • Olkaria II 70MW commissioned in 2003

  15. Concessioning Olkaria III Jul 2000 1998 Dec 2000 Mar 2002 Sep 2003 2013 2008 • 8MW Com. • 12 MW • 13 MW • 13.6 MW • 55 MW • 100 MW • Olkaria III concession for 100 MW The first 13 MW developed from wells drilled by Government

  16. Concessioning Longonot • IPP license given in 2009 • Targets to develop max of 140 MW on a 700 MW Prospect • Observation • Under utilization of the resource • Slow development pace

  17. Suswa • Observation • Growth relatively slow, expected development pace not realized 2007 • Suswa (>600 MW) concessioned to IPP

  18. Surface Exploration GDC Exploration and Appraisal drilling GDC Feasibility Study GDC Production & Development of Steam Supply GDC Sale of Steam Investment by Private entity/KenGen Construction and Operation of Power Plant Private Entity Development Strategy

  19. GDC Development Strategy

  20. CHALLENGES