1 / 13

S.Montebgnoli IRA -INAF- Bologna –Italy- 4 th SKADS Workshop, Lisbon, 2-3 October 2008

DS-6 Deliverables. S.Montebgnoli IRA -INAF- Bologna –Italy- 4 th SKADS Workshop, Lisbon, 2-3 October 2008. DS-6 T1 Deliverables: 1- Analogue (T0+12mo) and/or digital optical links (T0+21mo). 2- Architecture and technology for immediate application on the BEST - x

posy
Télécharger la présentation

S.Montebgnoli IRA -INAF- Bologna –Italy- 4 th SKADS Workshop, Lisbon, 2-3 October 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DS-6 Deliverables S.Montebgnoli IRA -INAF- Bologna –Italy- 4th SKADS Workshop, Lisbon, 2-3 October 2008

  2. DS-6 T1 Deliverables: 1- Analogue (T0+12mo) and/or digital optical links (T0+21mo). 2- Architecture and technology for immediate application on the BEST - x demonstrator construction (T0+10mo).

  3. 1- Analogue (T0+12mo) and/or digital optical links (T0+21mo). (Done) Analog Link Optical RX Optical Tx BEST-2 IF

  4. 2- Architecture and technology for immediate application on the BEST - x demonstrator construction (T0+10mo). (Done) Optical link Front End Low Noise balanced Amplifier IF Amplifier A/D

  5. DS-6 T2 Deliverables: • front ends to the receiver room (T0+12mo). • Immediately ready and easily replicable electronic (T0+12mo). • Local oscillator and sync. distribution in large infrastructures/arrays (T+38mo). • Wide band and high dynamic range Data Acquisition System (T+39mo). • 2 GHz analogue optical link (already used in BEST-1 and planned for BEST-2, -3 • 6.Tested adaptive beamforming and RFI Mitigation algorithms (T0+39mo).

  6. DS-6 T2 Deliverables:.. 1,2,3,4,5, .in practice. LNA Front end Sync distribution Easily replicable electronic Optical Fiber LO distribution FX correlator

  7. 1 2 N A/D A/D A/D 6.Tested adaptive beamforming and RFI Mitigation algorithms (T0+39mo) (Not completely Done). Simulation level. Not jet implemented . It will be the next step pf the Bee2 programming. = X = Dim. NxT using Cholesky Decomp. t T Rx n° samples per Rx Final version will be programmed on the Bee 2 engine

  8. DS-6 T3 Deliverables: • Simulation Software for sensor array (T0 + 36 months) • Methodology to compare expected results with the simulated ones (T0 + 39 months)

  9. Simulation Software for sensor array (T0 + 36 months) (Partially done) UV-plane coverage analysis for the BEST project (SKA-DS) INAF-IRA Technical Report #417/08 E. Carretti1, D. Dallacasa1, 2 1-INAF–IRA, Via Gobetti 101, I-40129 Bologna, Italy 2-Università di Bologna, Astronomy Dep., Via Ranzani 1, I-40126 Bologna, Italy

  10. 2. Methodology to compare expected results with the simulated ones (T0 + 39 months) (Partially done) DS6-T3: Assessment of Performace = 86.3 K Computed TSYS Computed TSYS BEST-1: Pn obtained with . GRASP F=408 MHz Measured TSYS

  11. DS-4 Deliverables: (to be focused with J.G. Bij de Vaate and Laurens Bakker) Kick off meeting in Medicina (Bologna) on April 2008 (BdeV)

  12. A D Calibration, Direct Pixeling, FX Correlation Calibration, Digital Adaptive beamforming (linked with DS3-T2 & DS 4 T3 and T5) FX corelator Rxi PFB Coarse Time Delay F Rxi spectrum X Resc. Fringes (f) 4 (bits) DDC FIFO Delay CTRL Adapt. Beamf. I FFT-1 Intellig. RFI Handling 1 RX 1 Beam 1    m I i Delay & RFI control Calibration/FFT Phase LUT Adaptive Beamf. Control Beam i m Rxi Calibration RX i k Beam k RX m Adaptive/multibeaming Block diagram (Deliverables)

  13. Thankyou

More Related