1 / 17

Examples of cryogenics equipments installed by AT/ECR-ME O. PIROTTE

Examples of cryogenics equipments installed by AT/ECR-ME O. PIROTTE. AT-ECR-ME SECTION MANDATE. Support and expertise in mechanical engineering Design & integration office (ACAD, Euclid, CATIA...) Manufacturing facilities (workshops, welders, ...), Management of ECR mechanical workshops

prue
Télécharger la présentation

Examples of cryogenics equipments installed by AT/ECR-ME O. PIROTTE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Examples of cryogenics equipments installed by AT/ECR-MEO. PIROTTE AT-ECR-ME NTof 2005 06 27

  2. AT-ECR-ME SECTION MANDATE • Support and expertise in mechanical engineering • Design & integration office (ACAD, Euclid, CATIA...) • Manufacturing facilities (workshops, welders, ...), Management of ECR mechanical workshops • Design, Fabrication and Supervision for ongoing projects of cryogenic equipment’s fabrication and installation • Management (incl. specifications) of contracts for IS and ECR projects • Technical support for the cryogenic installations in operation • General support in cryogenics AT-ECR-ME NTof 2005 06 27

  3. Main projects and installations • Design tools management : CDD, EDMS • Many designs, manufacturing and installations of cryogenic equipments in various locations : • LHC test areas : SM18, Hall 163, Block 4, SPS BA4 • Experiment test areas : Hall 180, EHN1, EHN2, P1, P5, P8 • Refurbishment of old installations in various build. • Assistance to other groups/divisions (SC, PH) • Experiments : ASACUSA, GReC, CAST, COMPASS, CMS, ATLAS, COLDEX, + collaborations with the Cryolab (CLTF, Beam Screen TF, ...) • (Emergency) interventions for operation (incl. other groups/divisions) AT-ECR-ME NTof 2005 06 27

  4. SM18 Cryo Area 6kW Al Plant moving and refurbishing for ATLAS. Design and installation of new Valve Boxes AT-ECR-ME NTof 2005 06 27

  5. SM18 Cryo Area AT-ECR-ME NTof 2005 06 27

  6. LHC BLOC 4 Test facility New Valve Box installation during a very short shutdown AT-ECR-ME NTof 2005 06 27

  7. LHC Block 4 Magnets TF AT-ECR-ME NTof 2005 06 27

  8. LHe Discharge Station AT-ECR-ME NTof 2005 06 27

  9. ATLAS Hall180 : BT Cryo Test Facility Precooler, OI VB + TLs TCF200 + Pump Cryostat AT-ECR-ME NTof 2005 06 27

  10. ATLAS HALL 180 BT TF AT-ECR-ME NTof 2005 06 27

  11. ATLAS HALL 180 BT TF AT-ECR-ME NTof 2005 06 27

  12. ATLAS Hall 180 : LAr TF AT-ECR-ME NTof 2005 06 27

  13. ATLAS : POINT 1

  14. ATLAS POINT 1 AT-ECR-ME NTof 2005 06 27

  15. ATLAS POINT 1 AT-ECR-ME NTof 2005 06 27

  16. ATLAS POINT 1 AT-ECR-ME NTof 2005 06 27

  17. ATLAS POINT 1 AT-ECR-ME NTof 2005 06 27

More Related