1 / 9

Status report of the WLTP Informal Group Report to GRPE No . 68 b y Stephan Redmann

Status report of the WLTP Informal Group Report to GRPE No . 68 b y Stephan Redmann. WLTP IG Meetings. June 2008 – Jan. 2010 1st – 4th WLTP IG meeting 2010 – 2013 WLTP IG was inactive 8th January 2014 5th WLTP IG meeting  Start of WLTP Phase 1B . Status of WLTP Phase 1.

prue
Télécharger la présentation

Status report of the WLTP Informal Group Report to GRPE No . 68 b y Stephan Redmann

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status report ofthe WLTP Informal Group Report to GRPE No. 68 by Stephan Redmann

  2. WLTP IG Meetings June 2008 – Jan. 2010 1st – 4th WLTP IG meeting 2010 – 2013 WLTP IG was inactive 8th January 20145th WLTP IG meeting Start of WLTP Phase 1B

  3. Status of WLTP Phase 1 67th GRPE: Working document GRPE/2013/13 amendedby(11/2013) Informal document GRPE-67-04-Rev.1  WLTP Phase 1A 162th WP.29: 1) Adoption of Phase 1A gtrdocuments (03/2014) 2) Technical reports 3) Mandate for WLTP Phase 1B

  4. WLTP Phase 1b Roadmap 2014 2015 2016 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 Phase2 ToR WP.29 GRPE WLTP 167 168 169 68 69 70 71 72 73 gtr formal document gtr informal document Slight modification 14 13 12 5 6 7 8 9 11 10 Phase2 Fix organization, responsibilities and time schedule Round Robin

  5. WLTP Phase 1b Organization(WLTP-05-03) WLTP Informal Group Chair : Redmann Vice Chair : KOBAYASHI Co-TSs: ICHIKAWA / Kolesa Drafting Coord.: Dubuc Task Forces IG designates responsible CPs/Individual expert for each open task. Co-Chairs: Ohlund / NIIKUNI Co-TS: ICHIKAWA / Hartmann E-Lab. Sub-group

  6. Open issues Phase 1B Open issueslist: WLTP-05-04 Key issues:Subgroup EV Utility Factors, phasespecificcalculationformula, shortenedtestprocedure Cycle / Process Downscaling, gearshifting , numberoftests Road & DynoLoad Determination Windtunnel method, torquemetermethod, on-board anemometry, defaultrunningresistances General Normalizationprocedures, Ambienttemp. correctiontestValidations/ Round Robin exercise

  7. Parallel activitiesofthe European Union in 2014: • Normalizationprocedures(WLTP-05-13)Correction algorithms for variations in the WLTP testing 1) Chassis dynamometer test (vehicle state, test execution, meas. Equipm.)2) Road load determination (coast-down test: ambient conditions, vehicle state, test execution, test circuit)Draft report on 21 methods: end January 2014, discussions on EU implementation in 2014Interest of CPs to harmonize these procedures (partly) in Phase 1B?  Feedback requesteduntil14th February 2014.

  8. AmbientTemperatureCorrection Test (WLTP-05-14)Method already discussed and drafted in Phase 1AValidation of family concept is on-going, participation of CPs welcomed • Utility Factors (EV vehicles)Current gtr: regional UFs. EU develops revised UFs to improve representativeness, including the methodology to develop UF.

  9. Next meetings • Preparatory Telephone/Web Conference, 2 weeks in advance of each IG meeting • 6th WLTP IG Meeting, Vienna, Austria3 day meeting, end March / beginning April 2014 (date tbc) • 7th WLTP IG Meeting, Geneva June 2014, preceding GRPE (date tbc)

More Related