An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Distributed Energy Resources Research Infrastructure

  2. Are you looking for the right kind of facility to carry out your DER Experiments?

  3. Free-of-Charge DERri offers a unique opportunity to supplement an ongoing research project using high-class research infrastructure in Europe. Your travel and accommodation expenses will be reimbursed, under the conditions agreed with the hosting institutions. The starting time and length of the experiment can be agreed with the hosting facility.

  4. Various Testing Installations Available DERri network consists of research facilities throughout Europe providing researchers with different kinds of testing facilities, simulations facilities as well as DER know-how and best practices. The facilities cover topics e.g. • smart grids • various renewable energy sources • storage • power quality • grid security • control and protection of the networks • communication • system aspects • architectural questions • domotics

  5. Examples of Past Projects

  6. Example: Electric Vehicles Control with Multi-agent System (EVOLVE-MAS) A user group from Cardiff University, UK • Host infrastructure: Tecnalia • Where and When: Derio, Spain - Spring 2011 • The purpose of EVOLVE-MAS was to test the operation of a Multi-Agent System (MAS) developed at Cardiff University. • Outcome documented on a Fact sheet and in a paper at the 3rd European Smart Grids and E-Mobility Conference in 2011 (both available on www.der-ri.net)

  7. Who Can Apply? For researchers to apply for a free accessthere are threeconditions. The leader of the applyingresearchergrouphave to work for an organisation (institute, company, universityetc) thatisestablished in countries of the European Union or associatedEuropeanstateslikeSwitzerland, Turkey or Israel. The research team, or itsmajority, must work in countriesotherthanwhere the operator of the infrastructureisestablished. The researchers must have the permission to publicly report abouttheirproject.

  8. High Class Laboratories Example 1: Ricerca sul Sistema Energetico SpA (RSE) DER Test Facility (DER-TF) • Consists of a LV microgrid, connected to the MV grid by means of a 800 kVA transformer Constituted by several generators with different technologies (renewable and conventional), controllable loads and storage systems. DER-TF can provide electricity to the main grid with a maximum power of 350 kW. • A Communication system is available with different technologies: LAN Ethernet, wireless and Power Line.

  9. Application Procedure • Applicant group fills up the application template (available on www.der-ri.net) describing the objectives and the expected outcome of the planned experiment. • Support for filling up an application can be asked to the project partners! • Application are launched periodically, next time • 30th June, 2012 and • 30th November, 2012 • A User Selection Committee of scientific experts evaluates the proposals

  10. The Project • DERri ‐ Distributed Energy Resources Research Infrastructure ‐ is a collaborative research project under the European PF7 programme (the contract n. 228449) • Start date: September 1, 2009; duration: 48 months • One structure focusing: • the interfaces among different Research Infrastructures • architectural and system aspects. INFRA-2008-1.1.2.20: for research onSmart Energy networks, to develop advanced electricity networks architectures and/or for testing of power components.

  11. Project objectives • DERri has as its primary objective the further integration of the European Distributed Energy Resources research community through: • Provision of user access to a unique portfolio of important European laboratories in the field of Distributed Energy Resources, focusing mainly system and architectural aspects. These laboratories cover the most relevant themes: integration of different types of DG equipment and their control, storage technologies, Demand Side Management etc. • Implementation of three Joint Research Activities (JRA) and • Implementation of Networking Activities (NA) aimed at strengthening the engagement with researcher and practitioner communities, public officials and the general public. • DERri provides European research communities the opportunity for transnational access to the DERri partners research infrastructures.

  12. Project structure

  13. The Consortium

  14. DERri Research Activities As part of the DERri project, joint research among the partners is conducted. These activities aim at improving the access of users to the research platforms and develop further synergies and complementary capabilities between the consorted Researchers Infrastructures. JRA 1: Joint Test Facility for Smart Energy Networks with Distributed Energy Resources (JaNDER) JRA 2: Filling the gaps in testing and characterisation methods for DER power components JRA 3: Real time simulation environment and parameter identification for power systems

  15. DERri Networking Activities Networking Activities are designed to facilitate easy communication between the project partners, infrastructure users and public stakeholders as well as external stakeholders, such as research and educational institutes and standardisation bodies. Networking Activities are divided in the following working packages: NA1 Management of the transnational user access NA2 Definition of common standards and procedures NA3 User support service NA4 Information and dissemination

  16. Contacts • DERri Coordinator: Paolo Mora – RSE (IT) • paolo.mora@rse-web.it • www.der-ri.net