1 / 18

n _TOF facility status (13/12/2010 – 06/10/2011)

n _TOF facility status (13/12/2010 – 06/10/2011). E. Berthoumieux on behalf the n_TOF collaboration. Outlines. Proton status Neutron beam line status Status of the 2010 gas release problem Status of the moderator & cooling circuit Remaining RP issues Foreseen / possible facility upgrade

quade
Télécharger la présentation

n _TOF facility status (13/12/2010 – 06/10/2011)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. n_TOF facility status(13/12/2010 – 06/10/2011) E. Berthoumieux on behalf the n_TOF collaboration

  2. Outlines • Proton status • Neutron beam line status • Status of the 2010 gas release problem • Status of the moderator & cooling circuit • Remaining RP issues • Foreseen / possible facility upgrade • RP related • Access related • In the neutron beam line • DAQ related

  3. Proton status • Reminder: proton is read by a new transformer since beginning of this year to solve the saturation problem • We are about to reach our planned intensity for 2011 • n_TOF Ph2 target received more beam than old one (>3.4 1019 p)

  4. Neutron beam line status • Reminder: First collimator not (and can not be) aligned. • Small leakage at the filter station level (probably with the C filter) • Several general electricity cuts occurred this year causing sometimes difficulties to restart the pumping, the magnet or the DAQ • Sweeping magnet switched off due to a “current balance” alarm. No real causes found by the expert. • EM & grounding problems in the WSTA. • Fences are being replaced to avoid intrusion in the WSTA

  5. n_TOF inside ISR-8 Degassing duct (~60 m) n_TOF ventilation ~30 m2 Ventilation duct n_TOF cooling station ~70 m2

  6. 2010 gas released problem (EDMS 1147942) • Maximum personnel exposure in 2010 due to the n_TOF cooling station External photon dose rate meas. • Estimation of relative contribution of the skin and inhalation dose • n_TOF operating conditions (beam and degassing) • Occupation factor

  7. Modifications on moderator circuit (reminder) • Cationic to mixed bed (previously saturated in enriched boron thanks to the bench test) resins. • No raise in conductivity seen since the filling of the circuit • Moderator circuit was not designed to switch twice a year from demineralized to borated water • New expansion vessel to fill and check the water level in the moderator circuit • New valves and pipes to empty the circuit. • Filling/emptying only require now valves manipulations. • Circuit was filled with enriched boric acid (not the same as last year!!!) the 1st of march and boron (~1 kg) was added in the “pot à bore” the 8th of march

  8. Moderator station status • Moderator circuit working at the saturation limit (filled with water containing 41.8 g/l of boric acid) • Some difficulties to have a stable regime in the borated water circulation at start-up. • Colder chilling water (7±2 ºC) and higher chilling water flow inside the “pot à bore” to ensure that it remains the coolest point of the moderator circuit • Conductivity very stable up to now (~57 µS) • A water leakage (~1.5 l loss in 6 months) was found at the TT9 sensor position. • Fixed but still under surveillance

  9. Cooling station status • Shielding has been reinforced during 2010 shutdown • Still not sufficient (see RP issues later) • Leakage of the degassing circuit solved • This circuit is now a radioactive source! • Problem with the oxygen content measurement • Value read by the station is wrong: shift of >0.04 mg/l compared to the value directly read on the apparatus. • Threshold have been modified to take care of this shift. • Action to be done during next shutdown to solve the problem

  10. Remaining RP issues (from J. Vollaire) • Dose rate in the vicinity of the cooling station can be still above the CERN limit for a non exposed area Blocks added here • Blocks added (31/08/2011) to overcome this issue • 2 workplaces • Center • Right Detector at the center

  11. Remaining RP issues (from J. Vollaire) • Results are normalized to alarm A level on PMITOF03 (= 6 mSv/h alarm B = 7 mSv/h) • Effect seems visible but is not sufficient to declassify the area with the current nominal intensity and alarm levels

  12. Summary of known problems in ISR8 Duct is a radioactive source Dose > 2.5 µSv/h Noise problem (not an n_TOF issue) Dose > 0.5 µSv/h

  13. RP related possible facility upgrade (ISR8) • Remaining dose at workplace area assigned to skyshine effect. • Dose in front of cooling station due to combination of skyshine effect and degassing duct. Foreseen/possible upgrades • Permanent RP monitoring at workplace area (RP action already started) • Send degassing duct directly to primary area • The initial idea to just replace existing duct has been abandoned • Roof (total or partial) over the station

  14. Access system in primary area willberevised(EDMS 1145465, 1145476 & 990214) • PS complex access system will be completely revised during the long shutdown • GS/ASE mandate will be focused on access only • Ventilation of primary area will be part of the access system • Cooling station will no longer be interlocked with beam!!!

  15. upgrades in the neutron beam line • Filter station • Solve the leakage problem • Add/replace some filters? • 1st collimator alignment? • Magnet control (~30 years old, lack of spares pieces) • Grounding improvement in WSTA • EM decoupling of the beam pipe nearby the WSTA? • Improve alignment in WSTA?

  16. Current DAQ limitation Hardware • 8 bits digitizers (sometimes difficult to have low threshold and wide energy range) • Data transfer rate (<1 Gb/s) • Limited number of channels/stream • Not possible to go down to thermal (TAC@250 or 500 MS/s) Software • Still in 32 bits OS (RAM and filesize limitation) • GUI still based on Qt 2 version (current Qt 4)

  17. DAQ possible upgrade • 8 channels, 12 bit, 1 GS/s, 64 MS/channel digitizer are now (next month) available on the market • Use of AXIe standard: PCIe X4 (2 GB/s) backplane connection • Cost/channel similar to DC282 (with memory extension)

  18. DAQ software improvement • 32 to 64 bits OS migration • Mandatory if one want to use more memory/channel (to go down to thermal energies) • 8 bits to 16 bits raw data format • DC282 are already 10 bits capable (limited interest because number of effective bits is 6 as for DC270) • Go to a (lossless) compressed data format • Current DAQ peak capabilities (Am/Be): 200 MB/s (17 TB/day) • TAC down to thermal at 16 bits is up to 12 times more data! • Migration to up to date libraries (Qt4, socket, …) • Improved zero suppression? • Improved Event display • … • Raw format modification -> DST rewriting Manpower needed to implement these changes (and also to ensure the DAQ maintenance)