1 / 23

Prosperity Through Unity Research Project Healing the Land – An Elders Prospective

Prosperity Through Unity Research Project Healing the Land – An Elders Prospective. Project Components. Prosperity Through Unity Reclamation Trial Plots – Treatments Healing the Land – An Elders Perspective Pre-site / Post-site Assessment Process. Reclamation Trial Plots.

quana
Télécharger la présentation

Prosperity Through Unity Research Project Healing the Land – An Elders Prospective

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Prosperity Through Unity Research Project Healing the Land – An Elders Prospective

  2. Project Components • Prosperity Through Unity Reclamation Trial Plots – Treatments • Healing the Land – An Elders Perspective • Pre-site / Post-site Assessment Process

  3. Reclamation Trial Plots • 10 sites with range of soil types and moisture regimes • 20m x 20m treatment plots, including: - Ripping (Excavator) - Ripping with Woodchip Mulch - Ripping with Woodchips Mixed in - Untreated with Woodchip Mulch - Untreated with Brushmats - Untreated (control) • Trees & Shrubs, including - White Spruce, Black Spruce, Lodgepole Pine, Western Larch (Tamarack) - Willow, Aspen, Hybrid Poplar, Elderberry, Red-Osier Dogwood, and Rose. • Other select species and techniques will be implemented from the Healing the Land – An Elders Perspective site visits

  4. Trial Plot Treatments Rip Untreated - Mulch

  5. Trial Plot Treatments Rip + Mulch Rip + Mulch Mixed

  6. Trial Plot Treatments Untreated - Brushmats Untreated (Control)

  7. Trial Plot Treatments Sx & Pl on Mulch Sx & Pl on Rip + Mulch

  8. Trial Plot Treatments Sx & Pl on Untreated With Brushmats Rose on Untreated

  9. Healing the Land – An Elders Perspective • Monashee Resources and the Aboriginal Groups in the Peace region have been and will continue to complete site visits of the reclamation trial plots and other reclaimed well-sites in their traditional areas.

  10. Healing the Land – An Elders Perspective • The objective of these visits is to examine alternative reclamation techniques that create sites that reflect their traditional knowledge, traditional activities, and/ or creates sites that are usable to the community. This can be achieved with little or no impact on current processes.

  11. Healing the Land – An Elders Perspective • Currently discussed treatments include: reforestation, creating wildlife habitat, planting native medicinal plants, planting native plants important to the community, planting berries, planting commercial crops, and restoring the site to what was originally there.

  12. Healing the Land – An Elders Perspective • Once the site visits are completed, Monashee will take some of the most common ideas and look at potential techniques to implement the ideas into the reclamation process. • These techniques will be tried on the appropriate reclamation trial plots based ecological factors and site conditions. • As for restoring the site to what was originally there, this process will be evaluated through our Pre-site/Post-site Assessment Process.

  13. Pre-site/Post-site Assessments • The most feasible method to restore a sites productivity, ecological factors, and consequently the vegetation that was originally there is through a pre-site post sites assessment • By determining soil horizon depths, LFH (topsoil) depths, compaction hazard, etc. A plan for stripping and restoring the important layers can be developed • This will help alleviate many of the problems that lead to a loss of productivity. • This is proven through the ALR schedule A & B site assessments, which are used during construction and reclamation to restore original site conditions

  14. Pre-Site Post-Site Reforestation Wildlife Habitat

  15. Pre-site/Post-site Assessment Process • Pre-site assessment (before construction) • Develop construction and reclamation plans • Site construction • Post-construction assessment (after construction) • Development/Drilling (Producer = end of process/ Duster = Abandonment) • Post – site assessment (before reclamation) & Reclamation prescription • Reclamation

  16. Pre-Site Assessment Ecological Conditions & Traditional Knowledge Data Collection

  17. Construction & Reclamation Plans Plans to Facilitate End Land-Uses are Made Including First Nations Concerns & Recommendations

  18. Site Construction Site Constructed Following Plans and First Nations Concerns & Recommendations

  19. Post-Construction Assessment Site Constructed Following Plans and First Nations Concerns & Recommendations

  20. Development (Drilling, etc.) Site Developed (Drilling) (Producer = End Process) (Duster = Abandonment)

  21. Post - Site Assessment & Reclamation Prescription Ecological Conditions Re-examined , Compared to Original Site Conditions & Treatments Prescribed

  22. Reclamation Soil Restoration Reclamation Carried Out Following the Prescription Planting (trees/shrubs) Seeding & Fertilizing (plants/berries)

  23. Contact Info Sam Bell Operations Manager Korey Green Land and Environmental Manager Monashee Resources Ltd1533-109th AvenueDawson Creek, BCV1G 2V3Phone: 250-782-7472Fax :    250-782-7488Cell:     250-784-8999Email:  contactus@monasheeresources.comWebsite www.monasheeresources.com

More Related