IEC TC57 WG13 EMS Application Program Interfaces

IEC TC57 WG13 EMS Application Program Interfaces. Terry Saxton Convenor, WG13. WG13 Status. What is WG13?. Objectives Reduce the cost and time needed to add new applications to an EMS or other system Protect the investment in existing applications that are working effectively

Télécharger la présentation

IEC TC57 WG13 EMS Application Program Interfaces

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13

  2. WG13 Status What is WG13? • Objectives • Reduce the cost and time needed to add new applications to an EMS or other system • Protect the investment in existing applications that are working effectively • Improve the capability to exchange information between disparate systems both within and external to the control center environment • Technical approach • Provide an integration framework for interconnecting existing applications/systems that is • Based on a common architecture and information model • CIM • Generic Services • Independent of the underlying technology (PIM) • Mappings to specific technologies (PSM)

  3. WG13 Status Meeting Summary • Recent Meetings – 3 days typical • Santa Clara, California, USA January 2008 • Meet in conjunction with WG16 • Rome, Italy October 2007 • Meet in conjunction with WG19 • Minneapolis, USA May 2007 • Meet in conjunction with TC57 Plenary • Planned Meetings • Vesteras, Sweden June 2008 • Seoul, Korea October 2008 • ??? January 2009

  4. WG13 Status Work Overview

  5. Existing Comments / User Group Inputs Interoperability Test Meeting to Reconcile Existing Work and Interoperability Test Results WG13 Status TC57 WG13 Release Lifecycle for 61970-301 CIM Base New Standard Existing Standard Final Update Resolutions Update • CIM12r002 released and posted • Third Edition Part 301 ready to send to IEC • Need to bring together all CIM WGs to use same number schemes, ways of organizing UML models • Profile/context standards

  6. Work Items and Issues • Part 301 Third Edition – based on CIM12 • CIM issue resolution continues • Prioritized list • CIM Planning project proposals • ERCOT proposals • Part 450 – Profiles and compliance testing • Part 452– Model Exchange Standard – based on NERC CPSM and recent interop test updates • Part 453 and 553-4 (SVG) – Graphics Exchange Standard • Need interop testing to advance • Part 454 – Naming • Part 5xx – Document Structure of PSM specifications • NWIPs • CIM/XML message header • Part 502-8 • Model Population • State Estimator Solution CIS • Part 406 Program Invocation • OWL for CIM/XML Schema