Ready: Vacuum line until QTLF.660300 , with pumps and gauges New sector valves, tested Cabling for gauges, sputter ion pumps, valves Vacuum controls. Missing Vacuum line after QTLF.660300 up to window: 44m of piping, connections, gauges, pumps. What is ready/missing?.

Télécharger la présentation

What is ready/missing?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ready: Vacuum line until QTLF.660300, with pumps and gauges New sector valves, tested Cabling for gauges, sputter ion pumps, valves Vacuum controls Missing Vacuum line after QTLF.660300up to window: 44m of piping, connections, gauges, pumps. What is ready/missing? HiRadMat Vacuum G.Vandoni TE/VSC

  2. Leak detection on the whole line Sputter ion pumps operating Gauges operating Open/close TT66 sector valve Tests during the dry run None. Vacuum tests are a verification of correct installation and therefore close the installation Tests with beam Follow pressure evolution with intensity. Tests before the dry run HiRadMat Vacuum G.Vandoni TE/VSC