raanan
Uploaded by
18 SLIDES
312 VUES
180LIKES

Espanol 2

DESCRIPTION

Espanol 2. Unidad 4 Writing Project #1 Profesora gooden. Learning Outcome(s). At the end of Unit 4 students will be able to: understand the structure and purpose of legends. evaluate a Mexican legend. compose a written review. Essential Questions.

1 / 18

Télécharger la présentation

Espanol 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Espanol 2 Unidad 4 Writing Project #1 Profesoragooden

  2. Learning Outcome(s) At the end of Unit 4 students will be able to: • understand the structure and purpose of legends. • evaluate a Mexican legend. • compose a written review.

  3. Essential Questions The following essential questions will provide a backdrop for the writing project. • Why is strong vocabulary so important in writing? • What are inferences? • How should transition words be used in sentences? • Why are facts and details so important in writing?

  4. En tupropiavoz(In your own words) – Escritura(Writing) • You are writing a review of the legends “Ixta y Popo” or “El fuego y el tlacuache” for inclusion in the teen section of a catalog to be used by non-Spanish speaking readers who want to know more about aspects of Hispanic literature.

  5. P.A.S.S.

  6. Your review should: • be thorough and balanced • help readers decide if material will be useful to them • summarize the text • discuss positive and negative attributes

  7. Paragraph 1 • States the title • Main point of the legend • Gives reader quick access to information • Does not use too many details • Discusses positive and negative attributes

  8. Paragraph 2 • The writer gives a personal perspective on what was enjoyable about the legend.

  9. Paragraph 3 • The writer balances the review by reporting what was bothersome.

  10. Paragraph 4 • In the conclusion, the writer explains what the reader will gain from reading the legend, reviewing the positive and the negative

  11. Length of Review • Your review should be no longer than 4 paragraphs. • The first paragraph should have 5-6 sentences. • The 2nd, 3rd and 4th paragraphs should consist of 3-5 sentences.

  12. Antes de escribir (Before writing) • Prepare to write your review by brainstorming the purpose of the story its main events ( ), the positive aspects (+), and the negative aspects (-). Be sure to write down the title and author. • Before you begin to write, record your ideas on a chart.

  13. Brainstorming Chart

  14. Revisiones (Revisions) • {Peer Editing} Share your draft with a partner. You may want to make revisions based on your partner’s responses to these questions.

  15. La version final (Final draft) • Before you write the final draft, carefully mark errors in grammar, spelling, usage, and punctuation using the proofreading symbols. Look over your work.

  16. Rubrica (Rubric) • Your review will be graded by a peer and the teacher. Criteria: Sentences___/3 Logical sentence order___/3 Details___/3 Clear and vivid detail___/3 Organization___/3 Accuracy ___/3

  17. Hay preguntas? Are there any questions?

  18. Project Timeline el 13 de mayo de 2013 Intro to project, students should have the introductory paragraph completed el 14 de mayo de 2013 Students should have the 1st, 2nd and 3rd paragraphs completed el 15 de mayo de 2013 Students should have all 4 paragraphs completed and ready for the peer check el 16 de mayo de 2013 Peer evaluation process el 17 de mayo de 2013 Work on Final draft Due : el 20 de mayo de 2013 (Must be typed (double-spaced)

More Related